Process
- 1. From Operation Status
Specify a default from operation status from the Work Center Load Review Calendar program (E313000).
- 2. Through Operation Status
Specify a default through operation status from the Work Center Load Review Calendar program (E313000).
- 3. Version of Supply/Demand inclusion Rules
Specify a default version of the supply/demand inclusion rules from the Work Center Load Review Calendar program (E313000).
- 4. Quantity Calculation
Specify whether the system includes the scrapped or canceled quantity in the calculation of the remaining quantity. Values are:
Blank: Include the scrapped or canceled quantity in the remaining quantity.
1: Do not include the scrapped or canceled quantity in the remaining quantity.