Process
- 1. From Operation Status
-
Specify the default From Operation Status the system uses for the Work Center Load Review Calendar program (P313004X).
- 2. Through Operation Status
Specify the default Through Operation Status the system uses for the Work Center Load Review Calendar program (P313004X).
- 3. Version of Supply/Demand inclusion Rules
Specify the default Version of Supply/Demand Inclusion Rules the system uses for the Work Center Load Review Calendar program (P313004X).
- 4. Quantity Calculation
Specify whether the system includes the scrapped or canceled quantity in the calculation of the remaining quantity. Values are:
Blank: Include the scrapped or canceled quantity in the remaining quantity.
1: Do not include the scrapped or canceled quantity in the remaining quantity.