WO Processing
These processing options control the work center information that appears on the form.
- 1. Include Work Order Generated Loads
Specify whether the system includes work order loads before rate schedules, after rate schedules, or not at all. Values are:
1: Generates work order loads before rate schedules.
2: Generates work order loads after rate schedules.
Blank: Does not recognize work order loads.
- 2. From Operation Status
Specify the status the system uses for the work orders or rate schedules as the routing steps are completed. Enter a value from UDC 31/OS (Operation Status) that indicates the status of a work order or rate schedule. Enter the operation status to use as the default value or select it from the Select User Define Code form.
- 3. To Operation Status
Specify the operation status the system uses for the work orders or rate schedules as the routing steps are completed. Enter a value from UDC 31/OS (Operation Status) that indicates the status of a work order or rate schedule. Enter the operation status to use as the default value or select it from the Select User Define Code form.