Replenishment Process Mode

Enter a UDC (46/PC) that identifies a replenishment processing method. Valid are:

P: Productivity mode. The system suggests the fewest locations possible to minimize the number of putaway and picking trips. The system minimizes the number of replenishment trips by replenishing from the fewest locations possible.

S: Space maximization mode. The system maximizes space use by attempting to top off partially filled locations to minimize inventory fragmentation.