Finalizing the Installation Plan

When you click No on the Location dialog, the Planner begins to finalize the plan, as indicated by a status message in the lower left-hand portion of the screen:

This image is described in the surrounding text.

Installation Planner displays a message to let you know that the installation plan has been finalized.

This image is described in the surrounding text.

On the Information Prompt that indicates Installation Planner has concluded, click the OK button to exit the message box and initiate the Planner Validation Report.

    • If the processing option default was selected, Planner Validation Report automatically prompts you to run this report.

    • If the processing option default was not selected, click the Validate node on the tree view of your plan to initiate the Planner Validation Report.

When the plan is finalized:

  • The status is set to 20, which signals that several adjustments to tables were made according to your plan.

  • The OCM is created.

  • The JDE.INI is modified.

  • The following tables are upgraded:

    • Release Master table (F00945).

    • Path Code Master table (F00942).

    • Package Plan table (F98404).

    • Machine Detail table (F9651).

    • Language table (F984031), if you are installing an alternate language.