Finalizing the Installation Plan

When the plan is finalized:

  • The status is set to 20, signaling that several adjustments to OCM mappings and tables are made according to your plan.

  • The system creates the OCM mappings and the JDE.INI.

  • These tables are updated:

    • Release Master table (F00945).

    • Path Code Master table (F00942).

    • Package Plan table (F98404).

    • Machine Detail table (F9651).

    • Language table (F984031), if you are installing a language.

To finalize the Installation Plan:

This image is described in the surrounding text.
  1. On the Information Prompt that indicates Installation Planner has concluded, click the OK button to exit the message box and initiate the Planner Validation Report.

    • If the processing option default was selected, Planner Validation Report automatically prompts you to run this report.

    • If the processing option default was not selected, click Validate on the tree view of your plan to initiate the Planner Validation Report.