SFS1500 - Production Variance Report

The process page that you use to generate this report includes these fields:

Field or Control Description

Variance Posting Date

The dates that production is closed for accounting.

Prdn Due Date/Shift

Enter a beginning and end production due date and shift. The Shift field value must be between 1 and 3.

Variance Tolerance Amount

Enter the minimum monetary amount on which you want to display report results. By specifying a minimum monetary amount, you can focus in on those production IDs or production areas with significant variances. Enter 0.00 to report all variances for the production that is selected.