Source Types
Project Costing uses transactions to track, analyze, and report on actual and planned project costs. You assign source types to individual transactions to identify the transaction's purpose.
Source types can be as general or as specific as needed. For example, you can use a Labor source type to track total project labor costs, or use overtime labor and standard labor source types to track overtime and standard labor separately.
PeopleSoft delivers the following source types as default; however, if you do not need any of the functionality provided with the source types, then they can be modified or removed.
| Source Type | Description |
|---|---|
|
AFUDC |
AFUDC Interest |
|
DIRCT |
Direct Costs |
|
LABOR |
Labor |
|
MATER |
Materials |
|
OVER |
Overhead |