7 How do I change the data type for a project in the app?

  1. Tap the project.
    You see the list of number cards.
  2. Tap More options icon.
  3. Tap Data Staging.
  4. Tap Change data type icon for an item to change the value to a number, text, or date.
  5. Tap Show hide icon for an item to show or hide it.
  6. Tap Done to apply the changes.