Edit an Integration with Incomplete Connections
You can edit integrations that include endpoints based on incomplete connections.
Note the following restrictions and capabilities with editing these types of integrations:
-
You can edit completed connections, actions, and maps.
-
You cannot edit endpoints based on incomplete connections. Instead, you must first edit the endpoints for those connections on the Connections page.
- In the navigation pane, click Design, then Integrations.
-
Open the integration that includes endpoints based on incomplete connections.
A message is displayed in the banner indicating that you can edit this integration, except for the endpoints based on incomplete connections.
-
Edit any completed connections, actions, and maps, as necessary.
-
To complete the integration, go to the Connections page for the incomplete connection and complete the configuration.
-
Return to the integration and edit the newly completed connection in the Adapter Endpoint Configuration Wizard, if necessary.
-
Save and exit the integration, then activate it.