Understand Schedule Integration Behavior When Using the Local Time Zone

Understand how schedule integrations are impacted by use of the local time zone. This section provides several use cases.

Daylight Savings Time Begins

Assume daylight savings begins in your environment on March 1 (time is moved forward from 1 AM to 2 AM) and your integration is scheduled to run at 1:30 AM. In this scenario, the time range between 1 AM and 1:59 AM does not exist and the schedule integration does not run on March 1 at 1:30 AM.

Daylight Savings Time Ends

Assume daylight savings time ends in your environment on November 1 (the time is rolled back from 2 AM to 1 AM) and your integration is scheduled to run at 1 AM. The schedule integration runs when expected at 1 AM. When 2 AM arrives and the time is rolled back to 1 AM, the schedule integration does not run again.