Stop an Integration Schedule in a Project
post
/ic/api/integration/v1/projects/{projectId}/integrations/{id}/schedule/stop
Stops an integration schedule in a project. Cancels all existing runs and no new runs are submitted.
Request
Path Parameters
-
id(required): string
Integration composite identifier. The ID consists of the code and the version separated by the | (vertical line) character. Format: code%7Cversion. Example: SC2RN%7C01.00.0000. When using cURL, substitute the %7C code for the vertical line.
-
projectId(required): string
Project identifier
Query Parameters
-
async: boolean
Stop the schedule in asynchronous manner. Link in the location header can be used to monitor the state of the schedule.
-
retry: boolean
Retry stop schedule if it's stuck in STOPPING state. Link in the location header can be used to monitor the state of the schedule.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json; charset=utf-8
200 Response
Successful operation
202 Response
Request accepted
404 Response
Resource not found