Stop an Integration Schedule in a Project

post

/ic/api/integration/v1/projects/{projectId}/integrations/{id}/schedule/stop

Stops an integration schedule in a project. Cancels all existing runs and no new runs are submitted.

Request

Path Parameters
  • Integration composite identifier. The ID consists of the code and the version separated by the | (vertical line) character. Format: code%7Cversion. Example: SC2RN%7C01.00.0000. When using cURL, substitute the %7C code for the vertical line.
  • Project identifier
Query Parameters
  • Stop the schedule in asynchronous manner. Link in the location header can be used to monitor the state of the schedule.
  • Retry stop schedule if it's stuck in STOPPING state. Link in the location header can be used to monitor the state of the schedule.

There's no request body for this operation.

Back to Top

Response

Supported Media Types

200 Response

Successful operation

202 Response

Request accepted

404 Response

Resource not found
Back to Top