Description of the illustration devcs_build_pipeline_manytoonedependency_nodes.png

This image shows a pipeline diagram in the designer. The diagram has five nodes: Start, Job 2, Job 3, Job 4, and Job 5. Arrows from the right handle of the Start node point to the left handle of the Job 2, Job 3, and Job 4 nodes. Arrows from the right handle of the Job 2, Job 3, and job 4 node point to the left handle of the Job 5 node.