Description of the Illustration er-example-stages.png
This image shows the Emergency dynamic process in the design view. The title bar includes the following links and buttons (from left to right): Test, Publish, Activate, Close, and Save. The Application Home tab and the Emergency Process tab are in the top-left corner below the title bar. The Emergency Process tab is selected.
The Emergency Process tab is divided into three sections:
- The top section has the following information (from left to right): the Add Stage field, the Emergency Process input and output controls, the Tour button, the Edit button, the Data Objects button, the Roles button, and the Edit Configuration button.
- The middle section has two stages. The Screening stage contains the Screen Patient activity. The Treatment stage contains the Treat Patient activity. The illustration highlights these activities with a red box.
- The bottom section has two global Activities: Discharge Patient and Surgery.
The validation error icon, which is a yellow triangle with a black number in the center, is shown in the four human activities and in the Emergency Process control in the top section.