The image shows the completed pipeline, which stopped running before executing the last job because it didn't get the two needed approvals. The gray Start node is to the left. A blue line with an arrow to the right connects it to the first node, JobA, which is shaded green. Job a has a #5 next to it, indicating that it was the 5th run for that job. A green line with an arrow to the right connects it to the red Approval node, indicating that at least one approver rejected the pipeline approval. JobB, which is shaded white, has no number next to it, indicating that it wasn't run. A dark gray arrow connects the Approval note to JobB.