The image shows the pipeline with the status displayed in a tooltipafter mousing over the approval node. The gray Start node is to the left. A blue line with an arrow to the right connects it to the first node, JobA, which is shaded green. Job a has a #5 next to it, indicating that it was the 5th run for that job. A green line with an arrow to the right connects it to the yellow Approval node with the spinner, indicating that some approval action is needed. A dark gray arrow connects the Approval note to JobB, which is shaded white and has no number next to it, indicating that it hasn't been run yet.