This image shows a graphic representation of a pipeline run with two triggers. The Start node is bordered with a dotted line and is connected to JobA01-#1 with a dotted line. The first trigger, <FiveMinutes> and the jobs it executes (JobA01-#1, JobA02-#1, JobA03-#1, JobA04-#1,) are connected by solid green arrows. The second trigger, <TwoMinutes> is shaded white and connected to JobA05-#2 with a solid black line. A green arrow from JobA05-#2 points to JobA06-#2.