Calculation Levels

  • Ensure that calculations are done on level 0 of all dimensions if the application design has a bottom up version setup.
  • If required for the approval process only, include aggregations in the BSO Plan Type. Move all other aggregations to the ASO Plan Type.
  • Keep the number of blocks included in your calculations as low as possible, for as long as possible.