Create Trade Operation

Create a trade operation by grouping the expected landed cost charges for material shipments.

Follow these steps:
  1. Create a trade operation for an upcoming shipment to capture the landed cost charges for that shipment.
  2. Create a trade operation after the actual shipment.
  3. To create a trade operation in ERP Cloud Cost Management, set up these charge lines.
    This table displays the details of charge lines to create a trade operation:
    Charge Line Charge Name Charge Basis Supplier Supplier Site Charge Currency Estimate Associated PO
    1 BOE Charge Aggregate Customs Authority Port of landing USD 6000000 PO 11, line 1 and line 2
    2 India Freight Aggregate Air India Port of landing USD 60000 PO 11, line 1 and line 2
    3 India Freight Aggregate DHL Port of landing USD 8000 PO 11, line 1 and line 2

    In the above table, Allocation Basis is Item Value, Charge Reference is PO Number, and Value is 11 for all charge lines. All the attributes are based on user discretion.

  4. Set the status for trade operation to Open and allocate the estimated charge.