How Participation Processing Evaluates Collapsing Rules and Timeliness Rules
If you configured life events with a timeliness rule, participation evaluation processing evaluates the timeliness rule before the collapsing rule. This topic uses a sample configuration of a collapsing rule and a timeliness rule to explain how the participation evaluation process evaluates such events.
Collapsing Rule Events and Timeliness Evaluation Rule Event
You configured the following:
-
Collapsing rule that collapses the Transfer and Location Change events to a resultant Location Change event if they occur within five days apart. You configured the occurred date of the resultant event to the date of the earliest life event
-
Timeliness evaluation rule for the Marriage event. You want to set the event status to Manual if it occurs outside 90 days from the process run date
The following table uses different scenarios to show how participation evaluation processing evaluates life events.
Scenario |
Events |
---|---|
Life event that was configured with a timeliness rule occurs before the collapsing rule life event combination |
|
Life event that was configured with a timeliness rule occurs after the collapsing rule life event combination |
|