DSN Reporting for AT-MP Absences
The DSN will collect information to produce the Absence Event DSN which will be placed in the legislative section of the Absence record.
For DSN purposes all absences contained in a case are treated as a single absence i.e., only one DSN record is required for all the absences contained in a case.
| Name | Description |
|---|---|
| Subrogation Start Date | Required for DSN. Automatically calculated: Absence Start Date in case of a single absence, else the start of the first absence in the case (for linked absences). |
| Override Subrogation Start Date | User enterable field to enter the date to be used instead (override) the system calculated one |
| Subrogation End date | Required for DSN. Automatically calculated: Subrogation End date will be the maximum entitlement remaining under either the LGI, conventional or company plan, even if it goes beyond the absence end date. |
| Override Subrogation End Date | User enterable field to enter the date to be used instead (override) the system calculated one |
| Return To Work Reason |
By default, the DSN will return normal return to work as a reason. |
| Last Day Worked Override |
The last day worked is the calendar day before the absence start date, But the user can enter the last day worked for DSN reporting, instead of the calculated one. |