Summary Time Periods and 13 Periods

Learn how 13-period calendars display in Workforce Summary Time Periods.

The rates for Salary Basis don't show in quarterly and half-year Summary Time Periods (STPs). Instead, the application converts the Salary Basis rate into a weekly rate (assuming the rate is based on a 52-week year) and then multiplies the rate by the number of weeks in the period. In a leap year, the rate is multiplied by 5 in the configured extra period.