Turn Equipment into Nonlabor Resources

This example illustrates setting up assets as nonlabor resources.

Scenario

You are asked to set up nonlabor resources and assign them to the appropriate organizations for the Vision Corporation.

Defining Nonlabor Resources

Vision Corporation wants to capture costs for computer equipment, vehicles, survey equipment, and other assets.

In this example, assume that expenditure types and organizations are already set up, which are prerequisites of defining nonlabor resources.

The Other Assets expenditure type is assigned to all divisions. This nonlabor resource captures miscellaneous items.

To define a nonlabor resource, you specify a name and description of each asset, such as a piece of equipment or pool of assets, and a date range during which the resource can be used.

For each nonlabor resource, you must choose an expenditure type with the Usage expenditure type class. Every usage item that you charge to a project must specify the nonlabor resource utilized and the nonlabor resource organization that owns the resource. You can select organizations that are classified as project and task owning organizations or project expenditure organizations.

A nonlabor resource may be a piece of equipment with capacity that is consumed, such as a training room, or equipment with physical output that is consumed, such as a copier. Enable the Equipment resource class to plan and report nonlabor resources as equipment with capacity that is consumed.

Nonlabor Resource Details

The following table shows the nonlabor resources for Vision Corporation.

Resource Name

Description

Expenditure Type

Equipment Resource Class

From Date

Organizations

Laptop

Laptop on the Headquarters Network

Computer Services

Not enabled

January 1, 2011

Data Systems

Finance

Information Services

Risk Analysis

HQ SPARC T3-1 Server

Oracle SPARC Server

Computer Services

Not enabled

January 1, 2011

Information Services

Oracle Exadata Storage Server

Data Systems Oracle Storage Server

Computer Services

Not enabled

January 1, 2011

Data Systems

Oracle Developer Studio

Engineering and Services Oracle Development Platform

Computer Services

Not enabled

January 1, 2011

Vision Engineering

Vision Services

Survey

Standard Surveying Equipment

Field Equipment

Enabled

May 1, 2011

Vision Engineering

Van

Heavy Duty Van

Vehicle

Not enabled

January 1, 2011

Vision Construction

West

Midwest

East

South

International

Minivan

Site Visit Minivan

Vehicle

Not enabled

August 1, 2011

Vision Construction

West

Midwest

East

South

International

Pickup Truck

Heavy Duty Pickup Truck

Vehicle

Not enabled

January 1, 2011

West

Midwest

East

Other Asset

Other Asset

Other Assets

Not enabled

January 1, 2011

Administration

Vision Construction

Vision Engineering

Vision Services