Get insights for all projects
get
/fscmRestApi/resources/11.13.18.05/projectInsights
Request
Query Parameters
-
expand: string
When this parameter is provided, the specified children are included in the resource payload (instead of just a link). The value of this query parameter is "all" or "". More than one child can be specified using comma as a separator. Example: ?expand=Employees,Localizations. Nested children can also be provided following the format "Child.NestedChild" (Example: ?expand=Employees.Managers). If a nested child is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?expand=Employees.Managers" is the same as "?expand=Employees,Employees.Managers" (which will expand Employees and Managers).
-
fields: string
This parameter filters the resource fields. Only the specified fields are returned, which means that if no fields are specified, no fields are returned (useful to get only the links). If an indirect child resource is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?fields=Employees.Managers:Empname" is the same as "?fields=;Employees:;Employees.Managers:Empname" (which will only return the "Empname" field for Managers). the value of this query parameter is a list of resource fields. The attribute can be a direct (Example: Employees) or indirect (Example: Employees.Managers) child. It cannot be combined with expand query parameter. If both are provided, only fields will be considered.
Format: ?fields=Attribute1,Attribute2
Format for fields in child resource: ?fields=Accessor1:Attribute1,Attribute2 -
finder: string
Used as a predefined finder to search the collection.
Format ?finder=<finderName>;<variableName>=<variableValue>,<variableName2>=<variableValue2>
The following are the available finder names and corresponding finder variables- PrimaryKey Finds the project insights with the specified primary key.
Finder Variables- ProjectId; integer; The unique identifier of the project.
- findByProjectId Finds the project insights with the specified primary key.
Finder Variables- ProjectId; integer; The unique identifier of the project.
- PrimaryKey Finds the project insights with the specified primary key.
-
limit: integer
This parameter restricts the number of resources returned inside the resource collection. If the limit exceeds the resource count then the framework will only return the available resources.
-
links: string
This parameter can be used to show only certain links while accessing a singular resource or a resource collection. The parameter value format is a comma-separated list of : <link_relation>
Example:
self,canonical -
offset: integer
Used to define the starting position of the resource collection. If offset exceeds the resource count then no resources are returned. Default value is 0.
-
onlyData: boolean
The resource item payload will be filtered in order to contain only data (no links section, for example).
-
orderBy: string
This parameter orders a resource collection based on the specified fields. The parameter value is a comma-separated string of attribute names, each optionally followed by a colon and "asc" or "desc". Specify "asc" for ascending and "desc" for descending. The default value is "asc". For example, ?orderBy=field1:asc,field2:desc
-
q: string
This query parameter defines the where clause. The resource collection will be queried using the provided expressions. The value of this query parameter is one or more expressions. Example: ?q=Deptno>=10 and <= 30;Loc!=NY
Format: ?q=expression1;expression2
You can use these queryable attributes to filter this collection resource using the q query parameter:- ActualPercentComplete; number; The percentage of reported work completed on the project.
- ActualPlannedCost; number; The amount in the cost breakdown for a project that's attributed to planned costs.
- ActualUnplannedCost; number; The amount in the cost breakdown for a project that's attributed to unplanned costs.
- AssignmentsEndingSoon; number; The number of resources with assignments to the project that are scheduled to end within the next two weeks.
- AssignmentsReserved; number; The number of resources with reserved assignments to the project.
- BudgetSpentAmount; number; The budgeted amount spent for the project.
- BudgetToDateAmount; number; The amount of budget that's available to spend at that point in time for a project.
- CommittedCost; number; The amount in the cost breakdown for a project that's attributed to committed costs. Commitments include purchase orders, purchase requisitions, and supplier invoices.
- CreatedBy; string; The user who created the record.
- CreationDate; string; The date when the record was created.
- CurrencyCode; string; The currency code for the project currency.
- CurrentBaselineBudget; number; The total planned cost that's associated to the project tasks or task assignments in the current baseline budget.
- ExpectedPercentComplete; number; The percentage of work that should be complete as of today if the project is on schedule. The value is a calculation of expected duration multiplied by planned hours and then divided by the planned duration.
- InvoicesAwaitingApproval; number; The number of invoices submitted for the project that are pending approval.
- LastUpdateDate; string; The date when the record was last updated.
- LastUpdatedBy; string; The user who last updated the record.
- MilestonesAtRisk; number; The number of milestones that are at risk of being delayed.
- MilestonesDueSoon; number; The number of milestones that are due in the near future.
- MilestonesPastDue; number; The number of milestones that aren't completed by the finish date.
- MissingTimeCardsFiveWeeksOld; number; The number of time cards that are missing or incomplete for a project and due five weeks ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsFourWeeksOld; number; The number of time cards that are missing or incomplete for a project and due four weeks ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsOneWeekOld; number; The number of time cards that are missing or incomplete for a project and due one week ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsThreeWeeksOld; number; The number of time cards that are missing or incomplete for a project and due three weeks ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsTwoWeeksOld; number; The number of time cards that are missing or incomplete for a project and due two weeks ago. Only resources that are enabled to track time are considered.
- PerformanceHealthStatus; string; The value representing the overall performance health of the project, such as at risk and on track. The list of values is defined in the lookup PJS_PERF_INDICATORS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- PerformanceHealthStatusCode; string; The code representing the overall performance health of the project, such as at risk and on track. A list of values is defined in the lookup type PJS_PERF_INDICATORS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- PlannedEffort; number; The amount of effort planned for the project.
- ProjectId; integer; The unique identifier of the project.
- ProjectName; string; The display name of the project.
- TaskExceptionsCount; number; The number of task exceptions for a project. Task exceptions occur when the team member changes the task dates or effort outside of the threshold values that were set during implementation or when the tasks are overdue.
- WeekFiveToEightOverAllocated; number; The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next five to eight weeks of the project.
- WeekFiveToEightUnderAllocated; number; The number of labor resources who are assigned to tasks for less than their allocated hours during the next five to eight weeks of the project.
- WeekNineToTwelveOverAllocated; number; The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next nine to twelve weeks of the project.
- WeekNineToTwelveUnderAllocated; number; The number of labor resources who are assigned to tasks for less than their allocated hours during the next nine to twelve weeks of the project.
- WeekOneToFourOverAllocated; number; The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours for the four weeks of the project that start with the current week.
- WeekOneToFourUnderAllocated; number; The number of labor resources who are assigned to tasks for less than their allocated hours for the four weeks of the project that start with the current week.
-
totalResults: boolean
The resource collection representation will include the "estimated row count" when "?totalResults=true", otherwise the count is not included. The default value is "false".
Header Parameters
-
Metadata-Context:
If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
-
REST-Framework-Version:
The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
Default Response
The following table describes the default response for this task.
Headers
-
Metadata-Context:
If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
-
REST-Framework-Version:
The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Root Schema : projectInsights
Type:
Show Source
object-
count(required): integer
The number of resource instances returned in the current range.
-
hasMore(required): boolean
Indicates whether more resources are available on the server than the subset returned in the response. If the value is true, then there are more resources to retrieve from the server. The default value is false.
-
items: array
Items
Title:
ItemsThe items in the collection. -
limit(required): integer
The actual paging size used by the server.
-
links(required): array
Links
Title:
LinksThe link relations associated with the resource instance. -
offset(required): integer
The offset value used in the current page.
-
totalResults: integer
The estimated row count when "?totalResults=true", otherwise the count is not included.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source
Nested Schema : projectInsights-item-response
Type:
Show Source
object-
ActualPercentComplete: number
Title:
Actual Percentage CompleteRead Only:trueThe percentage of reported work completed on the project. -
ActualPlannedCost: number
Title:
Actual Planned CostRead Only:trueThe amount in the cost breakdown for a project that's attributed to planned costs. -
ActualUnplannedCost: number
Title:
Actual Unplanned CostRead Only:trueThe amount in the cost breakdown for a project that's attributed to unplanned costs. -
Assignments: array
Assignments
Title:
AssignmentsThe Assignments resource is used to view details for the assignments ending soon and reserved assignments for a project. -
AssignmentsEndingSoon: number
Title:
Assignments EndingRead Only:trueThe number of resources with assignments to the project that are scheduled to end within the next two weeks. -
AssignmentsReserved: number
Title:
Assignments Reserved CountRead Only:trueThe number of resources with reserved assignments to the project. -
BudgetSpentAmount: number
Title:
Budget SpentRead Only:trueThe budgeted amount spent for the project. -
BudgetToDateAmount: number
Title:
Budget to DateRead Only:trueThe amount of budget that's available to spend at that point in time for a project. -
CommittedCost: number
Title:
Committed CostRead Only:trueThe amount in the cost breakdown for a project that's attributed to committed costs. Commitments include purchase orders, purchase requisitions, and supplier invoices. -
CreatedBy: string
Title:
Created ByRead Only:trueMaximum Length:64The user who created the record. -
CreationDate: string
(date-time)
Title:
Creation DateRead Only:trueThe date when the record was created. -
CurrencyCode: string
Title:
CurrencyRead Only:trueMaximum Length:15The currency code for the project currency. -
CurrentBaselineBudget: number
Title:
BudgetRead Only:trueThe total planned cost that's associated to the project tasks or task assignments in the current baseline budget. -
ExpectedPercentComplete: number
Title:
Expected Percentage CompleteRead Only:trueThe percentage of work that should be complete as of today if the project is on schedule. The value is a calculation of expected duration multiplied by planned hours and then divided by the planned duration. -
InvoicesAwaitingApproval: number
Title:
Invoices Awaiting ApprovalRead Only:trueThe number of invoices submitted for the project that are pending approval. -
LastUpdateDate: string
(date-time)
Title:
Last Update DateRead Only:trueThe date when the record was last updated. -
LastUpdatedBy: string
Title:
Last Updated ByRead Only:trueMaximum Length:64The user who last updated the record. -
links: array
Links
Title:
LinksThe link relations associated with the resource instance. -
MilestonesAtRisk: number
Title:
Milestones at RiskRead Only:trueThe number of milestones that are at risk of being delayed. -
MilestonesDueSoon: number
Title:
Milestones Due SoonRead Only:trueThe number of milestones that are due in the near future. -
MilestonesPastDue: number
Title:
Milestones Past DueRead Only:trueThe number of milestones that aren't completed by the finish date. -
MissingTimeCards: array
Missing Time Cards
Title:
Missing Time CardsThe Missing Time Card resource is used to view the details of the missing or incomplete time card count for a project. It includes the resources and their expected hours for time cards that are missing or partially reported. -
MissingTimeCardsFiveWeeksOld: number
Title:
Missing Time Cards Five Weeks OldRead Only:trueThe number of time cards that are missing or incomplete for a project and due five weeks ago. Only resources that are enabled to track time are considered. -
MissingTimeCardsFourWeeksOld: number
Title:
Missing Time Cards Four Weeks OldRead Only:trueThe number of time cards that are missing or incomplete for a project and due four weeks ago. Only resources that are enabled to track time are considered. -
MissingTimeCardsOneWeekOld: number
Title:
Missing Time Cards One Week OldRead Only:trueThe number of time cards that are missing or incomplete for a project and due one week ago. Only resources that are enabled to track time are considered. -
MissingTimeCardsThreeWeeksOld: number
Title:
Missing Time Cards Three Weeks OldRead Only:trueThe number of time cards that are missing or incomplete for a project and due three weeks ago. Only resources that are enabled to track time are considered. -
MissingTimeCardsTwoWeeksOld: number
Title:
Missing Time Cards Two Weeks OldRead Only:trueThe number of time cards that are missing or incomplete for a project and due two weeks ago. Only resources that are enabled to track time are considered. -
PendingInvoices: array
Pending Invoices
Title:
Pending InvoicesThe Pending Invoices resource is used to view the details of the invoices pending approval count for a project. -
PerformanceHealthStatus: string
Title:
Performance Health StatusRead Only:trueMaximum Length:80The value representing the overall performance health of the project, such as at risk and on track. The list of values is defined in the lookup PJS_PERF_INDICATORS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
PerformanceHealthStatusCode: string
Title:
Performance Health Status CodeRead Only:trueMaximum Length:30The code representing the overall performance health of the project, such as at risk and on track. A list of values is defined in the lookup type PJS_PERF_INDICATORS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
PlannedEffort: number
Title:
PlannedRead Only:trueThe amount of effort planned for the project. -
ProjectId: integer
(int64)
Title:
Project IDThe unique identifier of the project. -
ProjectName: string
Title:
Project NameRead Only:trueMaximum Length:240The display name of the project. -
TaskExceptions: array
Task Exceptions
Title:
Task ExceptionsThe Task Exceptions resource is used to view the details of the task exceptions, milestones past due, and milestones due soon counts for a project. It includes what qualified the task or milestone as an exception. -
TaskExceptionsCount: number
Title:
Task Exceptions CountRead Only:trueThe number of task exceptions for a project. Task exceptions occur when the team member changes the task dates or effort outside of the threshold values that were set during implementation or when the tasks are overdue. -
TeamAllocations: array
Team Allocations
Title:
Team AllocationsThe Team Allocations resource is used to view the over and under allocated labor resource details for a project. It includes the weekly assignment, allocation, and variance hours per team member for the twelve weeks that start with the current week. -
WeekFiveToEightOverAllocated: number
Title:
Weeks Five to Eight Overallocated ResourcesRead Only:trueThe number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next five to eight weeks of the project. -
WeekFiveToEightUnderAllocated: number
Title:
Weeks Five to Eight Under Allocated ResourcesRead Only:trueThe number of labor resources who are assigned to tasks for less than their allocated hours during the next five to eight weeks of the project. -
WeekNineToTwelveOverAllocated: number
Title:
Weeks Nine to Twelve Overallocated ResourcesRead Only:trueThe number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next nine to twelve weeks of the project. -
WeekNineToTwelveUnderAllocated: number
Title:
Weeks Nine to Twelve Under Allocated ResourcesRead Only:trueThe number of labor resources who are assigned to tasks for less than their allocated hours during the next nine to twelve weeks of the project. -
WeekOneToFourOverAllocated: number
Title:
Weeks One to Four Overallocated ResourcesRead Only:trueThe number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours for the four weeks of the project that start with the current week. -
WeekOneToFourUnderAllocated: number
Title:
Weeks One to Four Under Allocated ResourcesRead Only:trueThe number of labor resources who are assigned to tasks for less than their allocated hours for the four weeks of the project that start with the current week.
Nested Schema : Assignments
Type:
arrayTitle:
AssignmentsThe Assignments resource is used to view details for the assignments ending soon and reserved assignments for a project.
Show Source
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source
Nested Schema : Missing Time Cards
Type:
arrayTitle:
Missing Time CardsThe Missing Time Card resource is used to view the details of the missing or incomplete time card count for a project. It includes the resources and their expected hours for time cards that are missing or partially reported.
Show Source
Nested Schema : Pending Invoices
Type:
arrayTitle:
Pending InvoicesThe Pending Invoices resource is used to view the details of the invoices pending approval count for a project.
Show Source
Nested Schema : Task Exceptions
Type:
arrayTitle:
Task ExceptionsThe Task Exceptions resource is used to view the details of the task exceptions, milestones past due, and milestones due soon counts for a project. It includes what qualified the task or milestone as an exception.
Show Source
Nested Schema : Team Allocations
Type:
arrayTitle:
Team AllocationsThe Team Allocations resource is used to view the over and under allocated labor resource details for a project. It includes the weekly assignment, allocation, and variance hours per team member for the twelve weeks that start with the current week.
Show Source
Nested Schema : projectInsights-Assignments-item-response
Type:
Show Source
object-
AssignmentEndDate: string
(date)
Title:
Assignment End DateThe date when the resource assignment to the project is scheduled to end. -
AssignmentId: integer
(int64)
Title:
Assignment IDThe unique identifier of the project resource assignment. -
AssignmentStartDate: string
(date)
Title:
Start DateThe date when the resource assignment to the project is scheduled to start. -
AssignmentStatus: string
Title:
Assignment StatusRead Only:trueMaximum Length:80The project assignment status for a resource, such as reserved or pending adjustment. A list of values is defined in the lookup type PJR_ASSIGN_STATUS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
AssignmentStatusCode: string
Title:
Assignment Status CodeMaximum Length:30The code representing the project assignment status for a resource, such as RESERVED and PENDING_ADJUSTMENT. A list of values is defined in the lookup type PJR_ASSIGN_STATUS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CreatedBy: string
Title:
Created ByMaximum Length:64The user who created the record. -
CreationDate: string
(date-time)
Title:
Creation DateThe date when the record was created. -
EarliestTaskDate: string
(date)
Title:
Earliest Task Start DateThe earliest start date for the set of tasks that are assigned to the labor resource for the project. -
LastUpdateDate: string
(date-time)
Title:
Last Update DateThe date when the record was last updated. -
LastUpdatedBy: string
Title:
Last Updated ByMaximum Length:64The user who last updated the record. -
LatestTaskDate: string
(date)
Title:
Latest Task Finish DateThe latest finish date for the set of tasks that are assigned to the labor resource. -
links: array
Links
Title:
LinksThe link relations associated with the resource instance. -
ResourceId: integer
(int64)
Title:
Resource IDThe unique identifier of the project enterprise labor resource. -
ResourceName: string
Title:
ResourceRead Only:trueMaximum Length:240The name of the project enterprise labor resource.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source
Nested Schema : link
Type:
Show Source
object-
href: string
Title:
hyperlink referenceThe URI to the related resource. -
kind: string
Title:
kindAllowed Values:[ "collection", "item", "describe", "other" ]The kind of the related resource. -
name: string
Title:
nameThe name of the link to the related resource. -
properties: object
properties
-
rel: string
Title:
relationAllowed Values:[ "self", "lov", "parent", "canonical", "child", "enclosure", "action", "custom" ]The name of the relation to the resource instance. Example: self.
Nested Schema : properties
Type:
Show Source
object-
changeIndicator: string
Change indicator or the ETag value of the resource instance.
Nested Schema : projectInsights-MissingTimeCards-item-response
Type:
Show Source
object-
CategoryCodeForFiveWeeksAgo: string
Title:
Category Code for Five Weeks Old Missing Time CardMaximum Length:30The code that represents the categorization of the missing time card for the week ending five weeks ago. Values include ORA_PJS_MISSING_TIMECARD, ORA_PJS_MISSING_HOURS, and ORA_PJS_IN_PROCESS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryCodeForFourWeeksAgo: string
Title:
Category Code for Four Weeks Old Missing Time CardMaximum Length:30The code that represents the categorization of the missing time card for the week ending four weeks ago. Values include ORA_PJS_MISSING_TIMECARD, ORA_PJS_MISSING_HOURS, and ORA_PJS_IN_PROCESS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryCodeForOneWeekAgo: string
Title:
Category Code for One Week Old Missing Time CardMaximum Length:30The code that represents the categorization of the missing time card for the week ending one week ago. Values include ORA_PJS_MISSING_TIMECARD, ORA_PJS_MISSING_HOURS, and ORA_PJS_IN_PROCESS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryCodeForThreeWeeksAgo: string
Title:
Category Code for Three Weeks Old Missing Time CardMaximum Length:30The code that represents the categorization of the missing time card for the week ending three weeks ago. Values include ORA_PJS_MISSING_TIMECARD, ORA_PJS_MISSING_HOURS, and ORA_PJS_IN_PROCESS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryCodeForTwoWeeksAgo: string
Title:
Category Code for Two Weeks Old Missing Time CardMaximum Length:30The code that represents the categorization of the missing time card for the week ending two weeks ago. Values include ORA_PJS_MISSING_TIMECARD, ORA_PJS_MISSING_HOURS, and ORA_PJS_IN_PROCESS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryForFiveWeeksAgo: string
Title:
Category for Five Weeks Old Missing Time CardThe categorization of the missing time card for the week ending five weeks ago. Values include missing, partially reported, and in progress. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryForFourWeeksAgo: string
Title:
Category for Four Weeks Old Missing Time CardThe categorization of the missing time card for the week ending four weeks ago. Values include missing, partially reported, and in progress. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryForOneWeekAgo: string
Title:
Category for One Week Old Missing Time CardThe categorization of the missing time card for the week ending one week ago. Values include missing, partially reported, and in progress. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryForThreeWeeksAgo: string
Title:
Category for Three Weeks Old Missing Time CardThe categorization of the missing time card for the week ending three weeks ago. Values include missing, partially reported, and in progress. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CategoryForTwoWeeksAgo: string
Title:
Category for Two Weeks Old Missing Time CardThe categorization of the missing time card for the week ending two weeks ago. Values include missing, partially reported, and in progress. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_CATEGORY. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentCodeForFiveWeeksAgo: string
Title:
Commentary Code for Five Weeks Old Time CardMaximum Length:30The code that represents the additional commentary for the time card for the week ending five weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are ORA_PJS_SAVED, ORA_PJS_AWAITING_APPROVAL, ORA_PJS_AWAITING_PROCESSING, ORA_PJS_REJECTED, and ORA_PJS_HOURS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentCodeForFourWeeksAgo: string
Title:
Commentary Code for Four Weeks Old Time CardMaximum Length:30The code that represents the additional commentary for the time card for the week ending four weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are ORA_PJS_SAVED, ORA_PJS_AWAITING_APPROVAL, ORA_PJS_AWAITING_PROCESSING, ORA_PJS_REJECTED, and ORA_PJS_HOURS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentCodeForOneWeekAgo: string
Title:
Commentary Code for One Week Old Time CardMaximum Length:30The code that represents the additional commentary for the time card for the week ending one week ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are ORA_PJS_SAVED, ORA_PJS_AWAITING_APPROVAL, ORA_PJS_AWAITING_PROCESSING, ORA_PJS_REJECTED, and ORA_PJS_HOURS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentCodeForThreeWeeksAgo: string
Title:
Commentary Code for Three Weeks Old Time CardMaximum Length:30The code that represents the additional commentary for the time card for the week ending three weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are ORA_PJS_SAVED, ORA_PJS_AWAITING_APPROVAL, ORA_PJS_AWAITING_PROCESSING, ORA_PJS_REJECTED, and ORA_PJS_HOURS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentCodeForTwoWeeksAgo: string
Title:
Commentary Code for Two Weeks Old Time CardMaximum Length:30The code that represents the additional commentary for the time card for the week ending two weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are ORA_PJS_SAVED, ORA_PJS_AWAITING_APPROVAL, ORA_PJS_AWAITING_PROCESSING, ORA_PJS_REJECTED, and ORA_PJS_HOURS. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentForFiveWeeksAgo: string
Title:
Commentary for Five Weeks Old Time CardAdditional commentary for the time card for the week ending five weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are saved, awaiting approval, awaiting processing, rejected, and hours less than scheduled. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentForFourWeeksAgo: string
Title:
Commentary for Four Weeks Old Time CardAdditional commentary for the time card for the week ending four weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are saved, awaiting approval, awaiting processing, rejected, and hours less than scheduled. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentForOneWeekAgo: string
Title:
Commentary for One Week Old Time CardAdditional commentary for the time card for the week ending one week ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are saved, awaiting approval, awaiting processing, rejected, and hours less than scheduled. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentForThreeWeeksAgo: string
Title:
Commentary for Three Weeks Old Time CardAdditional commentary for the time card for the week ending three weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are saved, awaiting approval, awaiting processing, rejected, and hours less than scheduled. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CommentForTwoWeeksAgo: string
Title:
Commentary for Two Weeks Old Time CardAdditional commentary for the time card for the week ending two weeks ago. The commentary is for a time card that exists but isn't yet approved and successfully transferred. Values are saved, awaiting approval, awaiting processing, rejected, and hours less than scheduled. A list of values is defined in the lookup type ORA_PJS_UDB_TIMECARD_COMMENTS. Review the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task. -
CreatedBy: string
Title:
Created ByMaximum Length:64The user who created the record. -
CreationDate: string
(date-time)
Title:
Creation DateThe date when the record was created. -
DefaultHoursFiveWeeksAgo: number
Title:
Default Hours Five Weeks AgoThe default hours for the week ending five weeks ago for the resource and project. -
DefaultHoursFourWeeksAgo: number
Title:
Default Hours Four Weeks AgoThe default hours for the week ending four weeks ago for the resource and project. -
DefaultHoursOneWeekAgo: number
Title:
Default Hours One Week AgoThe default hours for the week ending one week ago for the resource and project. -
DefaultHoursThreeWeeksAgo: number
Title:
Default Hours Three Weeks AgoThe default hours for the week ending three weeks ago for the resource and project. -
DefaultHoursTwoWeeksAgo: number
Title:
Default Hours Two Weeks AgoThe default hours for the week ending two weeks ago for the resource and project. -
LastUpdateDate: string
(date-time)
Title:
Last Update DateThe date when the record was last updated. -
LastUpdatedBy: string
Title:
Last Updated ByMaximum Length:64The user who last updated the record. -
links: array
Links
Title:
LinksThe link relations associated with the resource instance. -
ResourceId: integer
(int64)
Title:
Resource IDRead Only:trueThe unique identifier of the project enterprise labor resource. -
ResourceName: string
Title:
Resource NameRead Only:trueMaximum Length:240The name of the project enterprise labor resource. -
ScheduledHoursFiveWeeksAgo: number
Title:
Scheduled Hours Five Weeks AgoThe effort in hours for the week ending five weeks ago for the resource and project. -
ScheduledHoursFourWeeksAgo: number
Title:
Scheduled Hours Four Weeks AgoThe effort in hours for the week ending four weeks ago for the resource and project. -
ScheduledHoursOneWeekAgo: number
Title:
Scheduled Hours One Week AgoThe effort in hours for the week ending one week ago for the resource and project. -
ScheduledHoursThreeWeeksAgo: number
Title:
Scheduled Hours Three Weeks AgoThe effort in hours for the week ending three weeks ago for the resource and project. -
ScheduledHoursTwoWeeksAgo: number
Title:
Scheduled Hours Two Weeks AgoThe effort in hours for the week ending two weeks ago for the resource and project. -
TimeCardHoursFiveWeeksAgo: number
Title:
Time Card Hours Five Weeks AgoThe effort in hours reported on a time card for the week ending five weeks ago for the resource and project. -
TimeCardHoursFourWeeksAgo: number
Title:
Time Card Hours Four Weeks AgoThe effort in hours reported on a time card for the week ending four weeks ago for the resource and project. -
TimeCardHoursOneWeekAgo: number
Title:
Time Card Hours One Week AgoThe effort in hours reported on a time card for the week ending one week ago for the resource and project. -
TimeCardHoursThreeWeeksAgo: number
Title:
Time Card Hours Three Weeks AgoThe effort in hours reported on a time card for the week ending three weeks ago for the resource and project. -
TimeCardHoursTwoWeeksAgo: number
Title:
Time Card Hours Two Weeks AgoThe effort in hours reported on a time card for the week ending two weeks ago for the resource and project.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source
Nested Schema : projectInsights-PendingInvoices-item-response
Type:
Show Source
object-
CreatedBy: string
Title:
Created ByMaximum Length:64The user who created the record. -
CreationDate: string
(date-time)
Title:
Creation DateThe date when the record was created. -
InvoiceAmount: number
Title:
Invoice Amount in Invoice CurrencyThe amount in the invoice currency. -
InvoiceCreationDate: string
(date)
Title:
Invoice Creation DateThe date when the invoice was created. -
InvoiceCurrencyCode: string
Title:
Invoice Currency CodeMaximum Length:15The currency code for the invoice that's transferred to Receivables. -
InvoiceDate: string
(date)
Title:
Invoice DateThe invoice date that's passed to Receivables to calculate the invoice due date. -
InvoiceId: integer
(int64)
Title:
Invoice IDThe unique identifier of the invoice. -
LastUpdateDate: string
(date-time)
Title:
Last Update DateThe date when the record was last updated. -
LastUpdatedBy: string
Title:
Last Updated ByMaximum Length:64The user who last updated the record. -
links: array
Links
Title:
LinksThe link relations associated with the resource instance. -
ProjectId: integer
(int64)
The unique identifier of the project.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source
Nested Schema : projectInsights-TaskExceptions-item-response
Type:
Show Source
object-
ActualHours: number
Title:
Actual HoursThe actual effort spent on the project task. -
CreatedBy: string
Title:
Created ByMaximum Length:64The user who created the record. -
CreationDate: string
(date-time)
Title:
Creation DateThe date when the record was created. -
FinishDelayedFlag: boolean
Title:
Finish Delayed IndicatorMaximum Length:1Indicates whether the task finish date was updated to a later date and is beyond the threshold that was set during implementation. If true, then the finish date change is beyond the threshold. -
FinishPastDueFlag: boolean
Title:
Finish Past Due IndicatorMaximum Length:1Indicates whether the project task finished on time. If true, then the task didn't finish on time. -
LastUpdateDate: string
(date-time)
Title:
Last Update DateThe date when the record was last updated. -
LastUpdatedBy: string
Title:
Last Updated ByMaximum Length:64The user who last updated the record. -
links: array
Links
Title:
LinksThe link relations associated with the resource instance. -
MilestoneFlag: boolean
Title:
MilestoneMaximum Length:1Indicates whether the task is a project milestone. If true, then the task is a milestone. -
NumberOfExceptions: number
Title:
Number of ExceptionsThe number of exceptions for a task. Task exceptions occur when the team member changes the task dates or effort outside of the threshold values that were set during implementation or when the tasks are overdue. -
PercentComplete: number
Title:
Percent CompleteThe percentage of work completed for a task. -
PlannedEffort: number
Title:
PlannedThe planned effort required to complete the project task. -
PlannedFinishDate: string
(date)
Title:
Planned Finish DateThe date when work is scheduled to end for a project task. -
PlannedHoursIncreasedFlag: boolean
Title:
Planned Hours Increased IndicatorMaximum Length:1Indicates whether the number of hours planned for a project task has increased more than the threshold that was set during implementation. If true, then the planned hours change is over the threshold. -
PlannedStartDate: string
(date)
Title:
Planned Start DateThe date when work is scheduled to start for a project task. -
StartDelayedFlag: boolean
Title:
Start Delayed IndicatorMaximum Length:1Indicates whether the task start date was updated to a later date and is beyond the threshold that was set during implementation. If true, then the start date change is beyond the threshold. -
StartPastDueFlag: boolean
Title:
Start Past Due IndicatorMaximum Length:1Indicates whether the project task started on time. If true, then the task didn't start on time. -
TaskId: integer
(int64)
The unique identifier of the project task.
-
TaskName: string
Title:
Task NameRead Only:trueMaximum Length:255The name of the project task.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source
Nested Schema : projectInsights-TeamAllocations-item-response
Type:
Show Source
object-
CreatedBy: string
Title:
Created ByMaximum Length:64The user who created the record. -
CreationDate: string
(date-time)
Title:
Creation DateThe date when the record was created. -
LastUpdateDate: string
(date-time)
Title:
Last Updated ByThe date when the record was last updated. -
LastUpdatedBy: string
Title:
Last Updated ByMaximum Length:64The user who last updated the record. -
links: array
Links
Title:
LinksThe link relations associated with the resource instance. -
ResourceId: integer
(int64)
Title:
Resource IDThe unique identifier of the project enterprise labor resource. -
ResourceName: string
Title:
ResourceRead Only:trueMaximum Length:240The name of the project enterprise labor resource. -
WeekEightAllocatedHours: number
Title:
Week Eight Allocated HoursThe number of hours allocated to the resource for the week of the project that starts in seven weeks. -
WeekEightAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in seven weeks.
-
WeekEightVariance: number
Title:
Week Eight Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in seven weeks. -
WeekElevenAllocatedHours: number
The number of hours allocated to the resource for the week of the project that starts in ten weeks.
-
WeekElevenAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in ten weeks.
-
WeekElevenVariance: number
Title:
Week Eleven Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in ten weeks. -
WeekFiveAllocatedHours: number
Title:
Week Five Allocated HoursThe number of hours allocated to the resource for the week of the project that starts in four weeks. -
WeekFiveAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in four weeks.
-
WeekFiveToEightAllocatedHours: number
Title:
Weeks Five to Eight Allocated HoursRead Only:trueThe number of hours allocated to the resource for the four weeks of the project that start in four weeks. -
WeekFiveToEightAssignedHours: number
Read Only:
trueThe number of hours assigned to the resource for the four weeks of the project that start in four weeks. -
WeekFiveToEightVariance: number
Title:
Weeks Five to Eight Allocation VarianceThe variance between the allocated and assigned hours for the four weeks of the project that start in four weeks. -
WeekFiveVariance: number
Title:
Week Five Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in four weeks. -
WeekFourAllocatedHours: number
Title:
Week Four Allocated HoursThe number of hours allocated to the resource for the week of the project that starts in three weeks. -
WeekFourAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in three weeks.
-
WeekFourVariance: number
Title:
Week Four Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in three weeks. -
WeekNineAllocatedHours: number
Title:
Week Nine Allocated HoursThe number of hours allocated to the resource for the week of the project that starts in eight weeks. -
WeekNineAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in eight weeks.
-
WeekNineToTwelveAllocatedHours: number
Read Only:
trueThe number of hours allocated to the resource for the four weeks of the project that start in eight weeks. -
WeekNineToTwelveAssignedHours: number
Read Only:
trueThe number of hours assigned to the resource for the four weeks of the project that start in eight weeks. -
WeekNineToTwelveVariance: number
Title:
Weeks Nine to Twelve Allocation VarianceThe variance between the allocated and assigned hours for the four weeks of the project that start in eight weeks. -
WeekNineVariance: number
Title:
Week Nine Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in eight weeks. -
WeekOneAllocatedHours: number
Title:
Week One Allocated HoursThe number of hours allocated to the resource for the current week of the project. -
WeekOneAssignedHours: number
The number of hours assigned to the resource for the current week of the project.
-
WeekOneToFourAllocatedHours: number
Title:
Weeks One to Four Allocated HoursRead Only:trueThe number of hours allocated to the resource for the four weeks of the project that start with the current week. -
WeekOneToFourAssignedHours: number
Read Only:
trueThe number of hours assigned to the resource for the four weeks of the project that start with the current week. -
WeekOneToFourVariance: number
Title:
Weeks One to Four Allocation VarianceThe variance between the allocated and assigned hours for the four weeks of the project that start with the current week. -
WeekOneVariance: number
Title:
Week One Allocation VarianceThe variance between the allocated and assigned hours for the current week of the project. -
WeekSevenAllocatedHours: number
Title:
Week Seven Allocated HoursThe number of hours allocated to the resource for the week of the project that starts in six weeks. -
WeekSevenAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in six weeks.
-
WeekSevenVariance: number
Title:
Week Seven Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in six weeks. -
WeekSixAllocatedHours: number
Title:
Week Six Allocated HoursThe number of hours allocated to the resource for the week of the project that starts in five weeks. -
WeekSixAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in five weeks.
-
WeekSixVariance: number
Title:
Week Six Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in five weeks. -
WeekTenAllocatedHours: number
Title:
Week Ten Allocated HoursThe number of hours allocated to the resource for the week of the project that starts in nine weeks. -
WeekTenAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in nine weeks.
-
WeekTenVariance: number
Title:
Week Ten Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in nine weeks. -
WeekThreeAllocatedHours: number
Title:
Week Three Assigned HoursThe number of hours allocated to the resource for the week of the project that starts in two weeks. -
WeekThreeAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in two weeks.
-
WeekThreeVariance: number
Title:
Week Three Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in two weeks. -
WeekTwelveAllocatedHours: number
The number of hours allocated to the resource for the week of the project that starts in eleven weeks.
-
WeekTwelveAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts in eleven weeks.
-
WeekTwelveVariance: number
Title:
Week Twelve Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts in eleven weeks. -
WeekTwoAllocatedHours: number
Title:
Week Two Allocated HoursThe number of hours allocated to the resource for the week of the project that starts next Sunday. -
WeekTwoAssignedHours: number
The number of hours assigned to the resource for the week of the project that starts next Sunday.
-
WeekTwoVariance: number
Title:
Week Two Allocation VarianceThe variance between the allocated and assigned hours for the week of the project that starts next Sunday.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source
Examples
The following example shows how to get insights for all projects by submitting a GET request on the REST resource using cURL.
curl --user ppm_cloud_user https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectInsights
Response Body Example
The following shows an example of the response body in JSON format of all project templates.
{
"items": [
{
"ProjectId": 300100061807448,
"ProjectName": "Fox Stores",
"ActualPercentComplete": 42,
"ExpectedPercentComplete": 45,
"PlannedEffort": 1600,
"TaskExceptionsCount": 4,
"WeekOneToFourUnderAllocated": 1,
"WeekFiveToEightUnderAllocated": 0,
"WeekNineToTwelveUnderAllocated": 0,
"WeekOneToFourOverAllocated": 1,
"WeekFiveToEightOverAllocated": 0,
"WeekNineToTwelveOverAllocated": 0,
"AssignmentsEndingSoon": 1,
"AssignmentsReserved": 2,
"MilestonesAtRisk": 0,
"MilestonesDueSoon": 1,
"MilestonesPastDue": 0,
"MissingTimeCardsFiveWeeksOld": null,
"MissingTimeCardsFourWeeksOld": null,
"MissingTimeCardsThreeWeeksOld": 1,
"MissingTimeCardsTwoWeeksOld": 0,
"MissingTimeCardsOneWeekOld": 1,
"CurrentBaselineBudget": 2560000,
"CurrencyCode": "USD",
"BudgetSpentAmount": 453000,
"BudgetToDateAmount": 471000,
"ActualUnplannedCost": 20800,
"ActualPlannedCost": 431200,
"CommittedCost": 504000,
"InvoicesAwaitingApproval": 1,
"PerformanceHealthStatusCode": "INDICATOR_4",
"PerformanceHealthStatus": "On track",
"CreatedBy": "Lisa.Williams",
"CreationDate": "2019-09-07T05:42:39+00:00",
"LastUpdateDate": "2019-10-28T09:14:32+00:00",
"LastUpdatedBy": "Lisa.Williams",
"links": [
....
]
}
...
]
}