Create a planning amounts for a resource assignment

post

/fscmRestApi/resources/11.13.18.05/financialProjectPlans/{PlanVersionId}/child/ResourceAssignments/{PlanningElementId}/child/PlanningAmounts

Request

Path Parameters
Header Parameters
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
  • Contains one of the following values: true or false. If true, the server performs an Upsert operation instead of a Create operation. During an Upsert operation, the server attempts to find an existing resource that matches the payload. If a match is found, the server updates the existing resource instead of creating a new one. If not found or false (default), the server performs a Create operation. Note that the Upsert operation isn't supported for date-effective REST resources.
Supported Media Types
Request Body - application/json ()
Root Schema : schema
Type: object
Show Source
  • Title: Burdened Cost
    Total planned cost for the financial project plan resource assignment in planning currency that includes both raw and burden costs.
  • Title: Currency
    Maximum Length: 15
    Code that identifies the planning currency on the financial project plan resource assignment.
  • Title: Average Effective Burden Cost Rate
    Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Effective Raw Cost Rate
    Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Plan Line ID
    Identifier of the summary level planning amounts for a resource assignment in the financial project plan.
  • Plan Lines Descriptive Flexfields
    Title: Plan Lines Descriptive Flexfields
    The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans.
  • Title: Planned Quantity
    Measure of the effort planned for in the financial project plan resource assignment, expressed in hours.
  • Planning Amount Details
    Title: Planning Amount Details
    The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts.
  • Title: Raw Cost
    Planned cost for the financial project plan resource assignment in planning currency that corresponds to the work performed.
Nested Schema : Plan Lines Descriptive Flexfields
Type: array
Title: Plan Lines Descriptive Flexfields
The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans.
Show Source
Nested Schema : Planning Amount Details
Type: array
Title: Planning Amount Details
The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts.
Show Source
Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanLinesDFF-item-post-request
Type: object
Show Source
Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanningAmountDetails-item-post-request
Type: object
Show Source
  • Title: Planned Burdened Cost
    Total planned cost for the period in the financial project plan resource assignment in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Rate
    Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Effective Rate
    Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Period
    Maximum Length: 30
    Period for which the periodic level planning amounts are created for a resource assignment in the financial project plan.
  • Title: Planned Quantity
    Measure of the effort planned for the period in the financial project plan resource assignment, expressed in hours.
  • Title: Raw cost
    Planned cost for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed.
Back to Top

Response

Supported Media Types

Default Response

The following table describes the default response for this task.
Headers
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Body ()
Root Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-item-response
Type: object
Show Source
  • Title: Baseline Burdened Cost
    Read Only: true
    Total planned cost for the baseline financial project plan resource assignment, including raw and burden costs, in planning currency.
  • Title: Rolled-up Baseline Cost for Resource in Project Currency
    Read Only: true
    Total planned cost for the baseline financial project plan resource assignment, including raw and burden costs, in project currency.
  • Title: Baseline Burdened Cost
    Read Only: true
    Total planned cost for the financial project plan resource assignment, including raw and burden costs, in project ledger currency in the baseline financial project plan version.
  • Title: Baseline Currency
    Read Only: true
    Maximum Length: 30
    Currency of the rendered baseline amounts.
  • Title: Baseline Quantity
    Read Only: true
    Measure of the effort planned for the resource assignment in the baseline financial project plan version, expressed in hours.
  • Title: Baseline Raw Cost
    Read Only: true
    Planned cost for the project in planning currency in the baseline financial project plan version that corresponds to the work performed.
  • Title: Baseline Raw Cost
    Read Only: true
    Planned cost for the baseline financial project plan resource assignment in project currency that corresponds to the work performed.
  • Title: Baseline Raw Cost
    Read Only: true
    Planned cost for the baseline financial project plan resource assignment in project ledger currency that corresponds to the work performed.
  • Title: Burdened Cost
    Total planned cost for the financial project plan resource assignment in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Currency: Total
    Read Only: true
    Total planned cost for the financial project plan resource assignment in project currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Ledger Currency: Total
    Read Only: true
    Total planned cost for the financial project plan resource assignment in project ledger currency that includes both raw and burden costs.
  • Title: Currency
    Maximum Length: 15
    Code that identifies the planning currency on the financial project plan resource assignment.
  • Title: Average Effective Burden Cost Rate
    Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Effective Raw Cost Rate
    Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Title: ITD Actual Burdened Cost
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in planning currency from the start date of the project till the current date.
  • Title: ITD Actual Burdened Cost
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project currency from the start date of the project till the current date.
  • Title: ITD Actual Burdened Cost
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project ledger currency from the start date of the project till the current date.
  • Title: ITD Actual Quantity
    Read Only: true
    Actual effort for the financial project plan resource assignment from the start of the project till the current date, expressed in hours.
  • Title: ITD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment in planning currency that corresponds to the work performed from the start date of the project till the current date.
  • Title: ITD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment in project currency that corresponds to the work performed from the start date of the project till the current date.
  • Title: ITD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment in project ledger currency that corresponds to the work performed from the start date of the project till the current date.
  • Links
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Plan Line ID
    Identifier of the summary level planning amounts for a resource assignment in the financial project plan.
  • Plan Lines Descriptive Flexfields
    Title: Plan Lines Descriptive Flexfields
    The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans.
  • Title: Planned Quantity
    Measure of the effort planned for in the financial project plan resource assignment, expressed in hours.
  • Planning Amount Details
    Title: Planning Amount Details
    The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts.
  • Title: Raw Cost
    Planned cost for the financial project plan resource assignment in planning currency that corresponds to the work performed.
  • Title: Raw Cost in Project Currency: Total
    Read Only: true
    Planned cost for the financial project plan resource assignment in project currency that corresponds to the work performed.
  • Title: Raw Cost in Project Ledger Currency
    Read Only: true
    Planned cost for the financial project plan resource assignment in project ledger currency that corresponds to the work performed.
  • Title: Standard Burdened Cost Rate
    Read Only: true
    Average rate derived from the rate schedule for calculating the planned burdened cost for the financial project plan resource assignment.
  • Title: Standard Raw Cost Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned raw cost for the financial project plan resource assignment.
Nested Schema : Plan Lines Descriptive Flexfields
Type: array
Title: Plan Lines Descriptive Flexfields
The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans.
Show Source
Nested Schema : Planning Amount Details
Type: array
Title: Planning Amount Details
The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts.
Show Source
Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanLinesDFF-item-response
Type: object
Show Source
Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanningAmountDetails-item-response
Type: object
Show Source
  • Title: Planned Burdened Cost
    Total planned cost for the period in the financial project plan resource assignment in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Currency: Total
    Read Only: true
    Total planned cost for a period in the financial project plan resource assignment in project currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Ledger Currency: Total
    Read Only: true
    Total planned cost for a period in the financial project plan resource assignment in project ledger currency that includes both raw and burden costs.
  • Title: Burdened Cost Rate
    Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Effective Rate
    Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Title: ITD Actual Burdened Cost
    Read Only: true
    Actual cost incurred for the period in the financial project plan resource assignment, including raw and burden costs, in planning currency from the start date of the project till the current date.
  • Title: ITD Actual Burdened Cost
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project currency from the start date of the project till the current date.
  • Title: ITD Actual in Project Ledger Currency
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project ledger currency from the start date of the project till the current date.
  • Title: ITD Actual Quantity
    Read Only: true
    Actual effort for the period in the financial project plan resource assignment from the start of the project till the current date, expressed in hours.
  • Title: ITD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed from the start date of the project till the current date.
  • Title: ITD Actual in Project Currency
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment in project currency that corresponds to the work performed from the start date of the project till the current date.
  • Title: ITD Actual in Project Ledger Currency
    Read Only: true
    Actual cost incurred for the financial project plan resource assignment in project ledger currency that corresponds to the work performed from the start date of the project till the current date.
  • Links
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Period
    Maximum Length: 30
    Period for which the periodic level planning amounts are created for a resource assignment in the financial project plan.
  • Title: Planned Quantity
    Measure of the effort planned for the period in the financial project plan resource assignment, expressed in hours.
  • Title: Raw cost
    Planned cost for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed.
  • Title: Raw Cost in Project Currency: Total
    Read Only: true
    Planned cost for a period in the financial project plan resource assignment in project currency that corresponds to the work performed.
  • Title: Raw Cost in Project Ledger Currency: Total
    Read Only: true
    Planned cost for a period in the financial project plan resource assignment in project ledger currency that corresponds to the work performed.
  • Title: Standard Burdened Cost Rate
    Read Only: true
    Average rate derived from the rate schedule for calculating the planned burdened cost for the period in the financial project plan resource assignment.
  • Title: Standard Raw Cost Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned raw cost for the period in the financial project plan resource assignment.
Back to Top