Create an export option for a project forecast version

post

/fscmRestApi/resources/11.13.18.05/projectForecasts/{PlanVersionId}/child/PlanningOptions/{PlanningOptionId}/child/ExportOptions

Request

Path Parameters
Header Parameters
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
  • Contains one of the following values: true or false. If true, the server performs an Upsert operation instead of a Create operation. During an Upsert operation, the server attempts to find an existing resource that matches the payload. If a match is found, the server updates the existing resource instead of creating a new one. If not found or false (default), the server performs a Create operation. Note that the Upsert operation isn't supported for date-effective REST resources.
Supported Media Types
Request Body - application/json ()
Root Schema : schema
Type: object
Show Source
  • Title: Burdened Cost: Actual Amounts
    Maximum Length: 1
    Actual burdened cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: Actual Amounts
    Maximum Length: 1
    Actual burdened costs incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Actual burdened costs incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin: Actual Amounts
    Maximum Length: 1
    Difference between actual project-related costs and actual revenue amounts. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Currency: Actual Amounts
    Maximum Length: 1
    Difference between actual project-related costs and actual revenue amounts calculated using project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Difference between actual project-related costs and actual revenue amounts calculated using project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: Actual Amounts
    Maximum Length: 1
    Actual quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: Actual Amounts
    Maximum Length: 1
    Actual cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: Actual Amounts
    Maximum Length: 1
    Actual cost amounts incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Actual cost amounts incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue: Actual Amounts
    Maximum Length: 1
    Actual revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Currency: Actual Amounts
    Maximum Length: 1
    Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Effective Multiplier
    Maximum Length: 1
    Multiplier used to calculate the burdened costs. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments: Supplier Invoices
    Maximum Length: 1
    Costs for supplier invoices billed against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Currency: Supplier Invoices
    Maximum Length: 1
    Burdened costs for supplier invoices billed against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
    Maximum Length: 1
    Burdened costs for supplier invoices billed against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments: Purchase Orders
    Maximum Length: 1
    Burdened costs for purchase orders against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Currency: Purchase Orders
    Maximum Length: 1
    Burdened costs for purchase orders against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
    Maximum Length: 1
    Burdened costs for purchase orders against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments: Requisitions
    Maximum Length: 1
    Burdened costs for outstanding purchase requisitions against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Currency: Requisitions
    Maximum Length: 1
    Burdened costs for outstanding purchase requisitions against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Requisitions
    Maximum Length: 1
    Burdened costs for outstanding purchase requisitions against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Standard Multiplier
    Maximum Length: 1
    Standard multiplier derived from the burden schedule for calculating burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Standard Rate
    Maximum Length: 1
    Standard rate derived from the rate schedule for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Display Commitments
    Indicates whether to display the external commitments present in the budget or forecast plan lines.
  • Title: Display currency conversion attributes and amounts in multiple transaction currencies
    Indicates whether to display the currency conversion attributes and amounts in multiple transaction currencies if the plan type allows planning in multiple transaction currencies.
  • Title: Burdened Cost: EAC
    Maximum Length: 1
    Estimate of burdened cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: EAC
    Maximum Length: 1
    Estimate of burdened costs incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimate of burdened costs incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin: EAC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Currency: EAC
    Maximum Length: 1
    Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin Percentage: EAC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: EAC
    Maximum Length: 1
    Estimate-at-completion quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: EAC
    Maximum Length: 1
    Estimate of cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: EAC
    Maximum Length: 1
    Estimate of cost amounts incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimate of cost amounts incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue: EAC
    Maximum Length: 201
    Estimate-at-completion revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Currency: EAC
    Maximum Length: 1
    Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Effective Rate
    Maximum Length: 1
    User entered rate for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: Effective Rate
    Maximum Length: 1
    User entered rate for calculating the raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Effective Revenue Rate
    Maximum Length: 1
    User entered rate for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: ETC
    Maximum Length: 1
    Estimate of burdened cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: ETC
    Maximum Length: 1
    Estimate of burdened costs to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: ETC
    Maximum Length: 1
    Estimate of burdened costs to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin: ETC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Currency: ETC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin Percentage: ETC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: ETC
    Maximum Length: 1
    Estimate-to-complete quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: ETC
    Maximum Length: 1
    Estimate of cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: ETC
    Maximum Length: 1
    Estimate of cost amounts to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Ledger Currency: ETC
    Maximum Length: 1
    Estimate of cost amounts to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: ETC Revenue
    Maximum Length: 1
    Estimate-to-complete revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Currency: ETC
    Maximum Length: 1
    Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Ledger Currency: ETC
    Maximum Length: 1
    Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Export Options ID
    Identifier of the project forecast version export options.
  • Title: From Date
    Maximum Length: 1
    From date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Cost Date
    Maximum Length: 1
    Date that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Cost Date Type
    Maximum Length: 1
    Date type that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Cost Rate
    Maximum Length: 1
    Cost rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Cost Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Date
    Maximum Length: 1
    Date that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Date Type
    Maximum Length: 1
    Date type that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Rate
    Maximum Length: 1
    Revenue rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Date
    Maximum Length: 1
    Date that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Date Type
    Maximum Length: 1
    Date type that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Rate
    Maximum Length: 1
    Cost rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Date
    Maximum Length: 1
    Date that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Date Type
    Maximum Length: 1
    Date type that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Rate
    Maximum Length: 1
    Revenue rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity Commitments: Supplier Invoices
    Maximum Length: 1
    Planned quantity of supplier invoice commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity Commitments: Purchase Orders
    Maximum Length: 1
    Planned quantity of purchase order commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity Commitments: Requisitions
    Maximum Length: 1
    Planned quantity of purchase requisition commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments: Supplier Invoices
    Maximum Length: 1
    Costs from supplier invoices that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Supplier Invoices
    Maximum Length: 1
    Costs from supplier invoices that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
    Maximum Length: 1
    Costs from supplier invoices that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments: Purchase Orders
    Maximum Length: 1
    Purchase order costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Purchase Orders
    Maximum Length: 1
    Purchase order costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Ledger Currency: Purchase Orders
    Maximum Length: 1
    Purchase order costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments: Requisitions
    Maximum Length: 1
    Purchase requisition costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Requisitions
    Maximum Length: 1
    Purchase requisition costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Ledger Currency: Requisitions
    Maximum Length: 1
    Purchase requisition costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: Standard Rate
    Maximum Length: 1
    Rate derived from the rate schedule for calculating raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue: Standard Rate
    Maximum Length: 1
    Rate derived from the rate schedule for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: To Date
    Maximum Length: 1
    End date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Total Commitments
    Maximum Length: 1
    Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: Total Commitments
    Maximum Length: 1
    Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: Total Commitments
    Maximum Length: 1
    Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: Total Commitments
    Maximum Length: 1
    Total commitments quantity required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: Total Commitments
    Maximum Length: 1
    Total commitments incurred by the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: Total Commitments
    Maximum Length: 1
    Total commitments incurred by the project in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Total Commitments
    Maximum Length: 1
    Total commitments incurred by the project in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Unit of Measure
    Maximum Length: 1
    Unit of measure for a resource. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
Back to Top

Response

Supported Media Types

Default Response

The following table describes the default response for this task.
Headers
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Body ()
Root Schema : projectForecasts-PlanningOptions-ExportOptions-item-response
Type: object
Show Source
  • Title: Burdened Cost: Actual Amounts
    Maximum Length: 1
    Actual burdened cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: Actual Amounts
    Maximum Length: 1
    Actual burdened costs incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Actual burdened costs incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin: Actual Amounts
    Maximum Length: 1
    Difference between actual project-related costs and actual revenue amounts. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Currency: Actual Amounts
    Maximum Length: 1
    Difference between actual project-related costs and actual revenue amounts calculated using project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Difference between actual project-related costs and actual revenue amounts calculated using project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: Actual Amounts
    Maximum Length: 1
    Actual quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: Actual Amounts
    Maximum Length: 1
    Actual cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: Actual Amounts
    Maximum Length: 1
    Actual cost amounts incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Actual cost amounts incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue: Actual Amounts
    Maximum Length: 1
    Actual revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Currency: Actual Amounts
    Maximum Length: 1
    Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Ledger Currency: Actual Amounts
    Maximum Length: 1
    Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Effective Multiplier
    Maximum Length: 1
    Multiplier used to calculate the burdened costs. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments: Supplier Invoices
    Maximum Length: 1
    Costs for supplier invoices billed against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Currency: Supplier Invoices
    Maximum Length: 1
    Burdened costs for supplier invoices billed against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
    Maximum Length: 1
    Burdened costs for supplier invoices billed against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments: Purchase Orders
    Maximum Length: 1
    Burdened costs for purchase orders against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Currency: Purchase Orders
    Maximum Length: 1
    Burdened costs for purchase orders against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
    Maximum Length: 1
    Burdened costs for purchase orders against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments: Requisitions
    Maximum Length: 1
    Burdened costs for outstanding purchase requisitions against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Currency: Requisitions
    Maximum Length: 1
    Burdened costs for outstanding purchase requisitions against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Requisitions
    Maximum Length: 1
    Burdened costs for outstanding purchase requisitions against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Standard Multiplier
    Maximum Length: 1
    Standard multiplier derived from the burden schedule for calculating burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Standard Rate
    Maximum Length: 1
    Standard rate derived from the rate schedule for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Display Commitments
    Indicates whether to display the external commitments present in the budget or forecast plan lines.
  • Title: Display currency conversion attributes and amounts in multiple transaction currencies
    Indicates whether to display the currency conversion attributes and amounts in multiple transaction currencies if the plan type allows planning in multiple transaction currencies.
  • Title: Burdened Cost: EAC
    Maximum Length: 1
    Estimate of burdened cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: EAC
    Maximum Length: 1
    Estimate of burdened costs incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimate of burdened costs incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin: EAC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Currency: EAC
    Maximum Length: 1
    Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin Percentage: EAC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: EAC
    Maximum Length: 1
    Estimate-at-completion quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: EAC
    Maximum Length: 1
    Estimate of cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: EAC
    Maximum Length: 1
    Estimate of cost amounts incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimate of cost amounts incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue: EAC
    Maximum Length: 201
    Estimate-at-completion revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Currency: EAC
    Maximum Length: 1
    Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Ledger Currency: EAC
    Maximum Length: 1
    Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Effective Rate
    Maximum Length: 1
    User entered rate for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: Effective Rate
    Maximum Length: 1
    User entered rate for calculating the raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Effective Revenue Rate
    Maximum Length: 1
    User entered rate for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: ETC
    Maximum Length: 1
    Estimate of burdened cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: ETC
    Maximum Length: 1
    Estimate of burdened costs to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: ETC
    Maximum Length: 1
    Estimate of burdened costs to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin: ETC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin in Project Currency: ETC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Margin Percentage: ETC
    Maximum Length: 1
    Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: ETC
    Maximum Length: 1
    Estimate-to-complete quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: ETC
    Maximum Length: 1
    Estimate of cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: ETC
    Maximum Length: 1
    Estimate of cost amounts to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Ledger Currency: ETC
    Maximum Length: 1
    Estimate of cost amounts to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: ETC Revenue
    Maximum Length: 1
    Estimate-to-complete revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Currency: ETC
    Maximum Length: 1
    Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue in Project Ledger Currency: ETC
    Maximum Length: 1
    Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Export Options ID
    Identifier of the project forecast version export options.
  • Title: From Date
    Maximum Length: 1
    From date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Links
  • Title: Planning Currency
    Read Only: true
    Maximum Length: 1
    Currency used for planning in the forecast line. This value is always set to true and the attribute is exported.
  • Title: Planning Resource
    Read Only: true
    Maximum Length: 1
    Resource used for financial planning in the forecast line. This value is always set to true and the attribute is exported.
  • Title: Project Currency Conversion: Cost Date
    Maximum Length: 1
    Date that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Cost Date Type
    Maximum Length: 1
    Date type that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Cost Rate
    Maximum Length: 1
    Cost rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Cost Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Date
    Maximum Length: 1
    Date that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Date Type
    Maximum Length: 1
    Date type that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Rate
    Maximum Length: 1
    Revenue rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Currency Conversion: Revenue Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Date
    Maximum Length: 1
    Date that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Date Type
    Maximum Length: 1
    Date type that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Rate
    Maximum Length: 1
    Cost rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Cost Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Date
    Maximum Length: 1
    Date that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Date Type
    Maximum Length: 1
    Date type that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Rate
    Maximum Length: 1
    Revenue rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Project Ledger Currency Conversion: Revenue Rate Type
    Maximum Length: 1
    The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity Commitments: Supplier Invoices
    Maximum Length: 1
    Planned quantity of supplier invoice commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity Commitments: Purchase Orders
    Maximum Length: 1
    Planned quantity of purchase order commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity Commitments: Requisitions
    Maximum Length: 1
    Planned quantity of purchase requisition commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments: Supplier Invoices
    Maximum Length: 1
    Costs from supplier invoices that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Supplier Invoices
    Maximum Length: 1
    Costs from supplier invoices that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
    Maximum Length: 1
    Costs from supplier invoices that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments: Purchase Orders
    Maximum Length: 1
    Purchase order costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Purchase Orders
    Maximum Length: 1
    Purchase order costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Ledger Currency: Purchase Orders
    Maximum Length: 1
    Purchase order costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments: Requisitions
    Maximum Length: 1
    Purchase requisition costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Requisitions
    Maximum Length: 1
    Purchase requisition costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Ledger Currency: Requisitions
    Maximum Length: 1
    Purchase requisition costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Resource Class
    Read Only: true
    Maximum Length: 1
    Resource class associated with the forecast line. This value is always set to true and the attribute is exported.
  • Title: Spread Curve
    Read Only: true
    Maximum Length: 1
    Spread curve associated with the forecast line. This value is always set to true and the attribute is exported.
  • Title: Raw Cost: Standard Rate
    Maximum Length: 1
    Rate derived from the rate schedule for calculating raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Revenue: Standard Rate
    Maximum Length: 1
    Rate derived from the rate schedule for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Task Name
    Read Only: true
    Maximum Length: 1
    Name assigned to a task. This value is always set to true and the attribute is exported.
  • Title: Task Number
    Read Only: true
    Maximum Length: 1
    Number of the task. This value is always set to true and the attribute is exported.
  • Title: To Date
    Maximum Length: 1
    End date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost: Total Commitments
    Maximum Length: 1
    Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Currency: Total Commitments
    Maximum Length: 1
    Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Burdened Cost in Project Ledger Currency: Total Commitments
    Maximum Length: 1
    Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Quantity: Total Commitments
    Maximum Length: 1
    Total commitments quantity required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost: Total Commitments
    Maximum Length: 1
    Total commitments incurred by the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost in Project Currency: Total Commitments
    Maximum Length: 1
    Total commitments incurred by the project in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Raw Cost Commitments in Project Currency: Total Commitments
    Maximum Length: 1
    Total commitments incurred by the project in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
  • Title: Unit of Measure
    Maximum Length: 1
    Unit of measure for a resource. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
Back to Top