Get all planning amount detail for all periods for a forecast plan line

get

/fscmRestApi/resources/11.13.18.05/projectForecasts/{PlanVersionId}/child/PlanningResources/{PlanningElementId}/child/PlanningAmounts/{PlanLineId}/child/PlanningAmountDetails

Request

Path Parameters
Query Parameters
  • This parameter specifies dependencies which are fields that are set before and rolled back after generating the response. Generally they are used to preview the effects of an attribute change. The fields specified in this parameter are always set in the resource instance in question. When a child resource collection is requested and the parameter is set, the fields will be set in the parent resource instance before generating the resource collection payload. The value of this query parameter is a set of dependency fields. Example: dependency=ProductId=2

    Format: <attr1>=<val1>,<attr2>=<value2>
  • When this parameter is provided, the specified children are included in the resource payload (instead of just a link). The value of this query parameter is "all" or "". More than one child can be specified using comma as a separator. Example: ?expand=Employees,Localizations. Nested children can also be provided following the format "Child.NestedChild" (Example: ?expand=Employees.Managers). If a nested child is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?expand=Employees.Managers" is the same as "?expand=Employees,Employees.Managers" (which will expand Employees and Managers).
  • This parameter filters the resource fields. Only the specified fields are returned, which means that if no fields are specified, no fields are returned (useful to get only the links). If an indirect child resource is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?fields=Employees.Managers:Empname" is the same as "?fields=;Employees:;Employees.Managers:Empname" (which will only return the "Empname" field for Managers). the value of this query parameter is a list of resource fields. The attribute can be a direct (Example: Employees) or indirect (Example: Employees.Managers) child. It cannot be combined with expand query parameter. If both are provided, only fields will be considered.

    Format: ?fields=Attribute1,Attribute2

    Format for fields in child resource: ?fields=Accessor1:Attribute1,Attribute2
  • Used as a predefined finder to search the collection.

    Format: ?finder=<finderName>;<variableName>=<variableValue>,<variableName2>=<variableValue2>

    The following are the available finder names and corresponding finder variables:

    • PrimaryKey: Finds the periodic amounts for a resource assignment for a forecast version.
      Finder Variables:
      • PlanLineDetailId; integer; Identifier of the periodic level planning amounts for a resource assignment in the forecast version.
  • This parameter restricts the number of resources returned inside the resource collection. If the limit exceeds the resource count then the framework will only return the available resources.
  • This parameter can be used to show only certain links while accessing a singular resource or a resource collection. The parameter value format is a comma-separated list of : <link_relation>

    Example:
    self,canonical
  • Used to define the starting position of the resource collection. If offset exceeds the resource count then no resources are returned. Default value is 0.
  • The resource item payload will be filtered in order to contain only data (no links section, for example).
  • This parameter orders a resource collection based on the specified fields. The parameter value is a comma-separated string of attribute names, each optionally followed by a colon and "asc" or "desc". Specify "asc" for ascending and "desc" for descending. The default value is "asc". For example, ?orderBy=field1:asc,field2:desc
  • This query parameter defines the where clause. The resource collection will be queried using the provided expressions. The value of this query parameter is one or more expressions. Example: ?q=Deptno>=10 and <= 30;Loc!=NY

    Format: ?q=expression1;expression2

    You can use these queryable attributes to filter this collection resource using the q query parameter:
    • ActualBurdenedCost; number; Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in planning currency from the start of the project till the current date.
    • ActualBurdenedCostInProjectCurrency; number; Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project currency from the start of the project till the current date.
    • ActualBurdenedCostInProjectLedgerCurrency; number; Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project ledger currency from the start of the project till the current date.
    • ActualBurdenedCostRate; number; Actual burdened cost rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
    • ActualQuantity; number; Actual effort for the forecast version resource assignment from the start of the project till the current date.
    • ActualRawCost; number; Actual cost incurred for the period in the forecast version resource assignment in planning currency that is directly attributable to the work performed from the start of the project till the current date.
    • ActualRawCostInProjectCurrency; number; Actual cost incurred for the forecast version resource assignment in project currency that is directly attributable to the work performed from the start of the project till the current date.
    • ActualRawCostInProjectLedgerCurrency; number; Actual cost incurred for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed from the start of the project till the current date.
    • ActualRawCostRate; number; Rate that is used to calculate the actual cost for the forecast version resource assignment that is directly attributable to the work performed.
    • ActualRevenue; number; Amount of revenue recognized for the forecast version resource assignment in planning currency from the inception of the project to date.
    • ActualRevenueInProjectCurrency; number; Amount of revenue recognized for the forecast version resource assignment in project currency from the inception of the project to date.
    • ActualRevenueInProjectLedgerCurrency; number; Amount of revenue recognized for the forecast version resource assignment in project ledger currency from the inception of the project to date.
    • ActualRevenueRate; number; Rate that is used to calculate the actual revenue for the forecast version resource assignment.
    • EACBurdenedCost; number; Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
    • EACBurdenedCostInProjectCurrency; number; Estimated cost in project currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
    • EACBurdenedCostInProjectLedgerCurrency; number; Estimated cost in project ledger currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
    • EACBurdenedCostRate; number; Rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
    • EACQuantity; number; Measure of the effort planned for in the forecast version resource assignment.
    • EACRawCost; number; Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed.
    • EACRawCostInProjectCurrency; number; Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
    • EACRawCostInProjectLedgerCurrency; number; Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
    • EACRawCostRate; number; Rate that is used to calculate the estimated cost at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
    • EACRevenue; number; Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task.
    • EACRevenueInProjectCurrency; number; Estimated revenue amount in project currency recognized for the forecast version resource assignment at the completion of the task.
    • EACRevenueInProjectLedgerCurrency; number; Estimated revenue amount in project ledger currency recognized for the forecast version resource assignment at the completion of the task.
    • EACRevenueRate; number; Rate that is used to calculate the estimated revenue at the completion of the task for the forecast version resource assignment.
    • ETCBurdenedCost; number; Estimated remaining cost in planning currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
    • ETCBurdenedCostInProjectCurrency; number; Estimated remaining cost in project currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
    • ETCBurdenedCostInProjectLedgerCurrency; number; Estimated remaining cost in project ledger currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
    • ETCQuantity; number; Estimated remaining effort by the forecast version resource assignment for completion.
    • ETCRawCost; number; Estimated remaining cost in planning currency required for completion of the task in the period by the forecast version resource assignment that is directly attributable to the work performed.
    • ETCRawCostInProjectCurrency; number; Estimated remaining cost in project currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
    • ETCRawCostInProjectLedgerCurrency; number; Estimated remaining cost in project ledger currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
    • ETCRevenue; number; Estimated remaining revenue amount in planning currency to be recognized for the forecast version resource assignment.
    • ETCRevenueInProjectCurrency; number; Estimated remaining revenue amount in project currency to be recognized for the forecast version resource assignment.
    • ETCRevenueInProjectLedgerCurrency; number; Estimated remaining revenue amount in project ledger currency to be recognized for the forecast version resource assignment.
    • EffectiveETCBurdenedCostRate; number; Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
    • EffectiveETCRawCostRate; number; Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
    • EffectiveETCRevenueRate; number; Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue.
    • ManualSpreadFlag; boolean; Indicates if the periodic planning is modified and retained for the plan line on date changes.
    • PeriodName; string; Period for which the periodic forecast amount is entered.
    • PlanLineDetailId; integer; Identifier of the periodic level planning amounts for a resource assignment in the forecast version.
    • PurchaseOrderCommittedBurdenedCost; number; Cost for the forecast version resource assignment committed through purchase orders in planning currency that includes both raw and burden costs.
    • PurchaseOrderCommittedBurdenedCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through purchase orders in project currency that includes both raw and burden costs.
    • PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that includes both raw and burden costs.
    • PurchaseOrderCommittedQuantity; number; Effort for the forecast version resource assignment committed through purchase orders.
    • PurchaseOrderCommittedRawCost; number; Cost for the forecast version resource assignment committed through purchase orders in planning currency that is directly attributable to the work performed.
    • PurchaseOrderCommittedRawCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through purchase orders in project currency that is directly attributable to the work performed.
    • PurchaseOrderCommittedRawCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that is directly attributable to the work performed.
    • RequisitionCommittedBurdenedCost; number; Cost for the forecast version resource assignment committed through requisitions in planning currency that includes both raw and burden costs.
    • RequisitionCommittedBurdenedCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through requisitions in project currency that includes both raw and burden costs.
    • RequisitionCommittedBurdenedCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through requisitions in project ledger currency that includes both raw and burden costs.
    • RequisitionCommittedQuantity; number; Effort for the forecast version resource assignment committed through requisitions.
    • RequisitionCommittedRawCost; number; Cost for the forecast version resource assignment committed through requisitions in planning currency that is directly attributable to the work performed.
    • RequisitionCommittedRawCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through requisitions in project currency that is directly attributable to the work performed.
    • RequisitionCommittedRawCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through requisitions in project ledger currency that is directly attributable to the work performed.
    • StandardETCBurdenedCostRate; number; Average rate derived from the rate schedule for calculating the planned burdened cost for the forecast version resource assignment.
    • StandardETCRawCostRate; number; Rate derived from the rate schedule for calculating the planned raw cost for the forecast version resource assignment.
    • StandardETCRevenueRate; number; Rate derived from the rate schedule for calculating the planned revenue for the forecast version resource assignment.
    • SupplierInvoiceCommittedBurdenedCost; number; Cost for the forecast version resource assignment committed through supplier invoices in planning currency that includes both raw and burden costs.
    • SupplierInvoiceCommittedBurdenedCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through supplier invoices in project currency that includes both raw and burden costs.
    • SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that includes both raw and burden costs.
    • SupplierInvoiceCommittedQuantity; number; Effort for the forecast version resource assignment committed through supplier invoices.
    • SupplierInvoiceCommittedRawCost; number; Cost for the forecast version resource assignment committed through supplier invoices in planning currency that is directly attributable to the work performed.
    • SupplierInvoiceCommittedRawCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through supplier invoices in project currency that is directly attributable to the work performed.
    • SupplierInvoiceCommittedRawCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that is directly attributable to the work performed.
    • TotalCommittedBurdenedCost; number; Total committed cost for the forecast version resource assignment in planning currency that includes both raw and burden costs.
    • TotalCommittedBurdenedCostInProjectCurrency; number; Total committed cost for the forecast version resource assignment in project currency that includes both raw and burden costs.
    • TotalCommittedBurdenedCostInProjectLedgerCurrency; number; Total committed cost for the forecast version resource assignment in project ledger currency that includes both raw and burden costs.
    • TotalCommittedQuantity; number; Committed effort for the forecast version resource assignment.
    • TotalCommittedRawCost; number; Total committed cost for the forecast version resource assignment in planning currency that is directly attributable to the work performed.
    • TotalCommittedRawCostInProjectCurrency; number; Total committed cost for the forecast version resource assignment in project currency that is directly attributable to the work performed.
    • TotalCommittedRawCostInProjectLedgerCurrency; number; Total committed cost for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed.
    • TransferOrderCommittedBurdenedCost; number; Cost for the forecast version resource assignment committed through transfer orders in planning currency that includes both raw and burden costs.
    • TransferOrderCommittedBurdenedCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through transfer orders in project currency that includes both raw and burden costs.
    • TransferOrderCommittedBurdenedCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that includes both raw and burden costs.
    • TransferOrderCommittedQuantity; number; Effort for the forecast version resource assignment committed through transfer orders.
    • TransferOrderCommittedRawCost; number; Cost for the forecast version resource assignment committed through transfer orders in planning currency that is directly attributable to the work performed.
    • TransferOrderCommittedRawCostInProjectCurrency; number; Cost for the forecast version resource assignment committed through transfer orders in project currency that is directly attributable to the work performed.
    • TransferOrderCommittedRawCostInProjectLedgerCurrency; number; Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that is directly attributable to the work performed.
  • The resource collection representation will include the "estimated row count" when "?totalResults=true", otherwise the count is not included. The default value is "false".
Header Parameters
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.

There's no request body for this operation.

Back to Top

Response

Supported Media Types

Default Response

The following table describes the default response for this task.
Headers
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Body ()
Root Schema : projectForecasts-PlanningResources-PlanningAmounts-PlanningAmountDetails
Type: object
Show Source
Nested Schema : Items
Type: array
Title: Items
The items in the collection.
Show Source
Nested Schema : projectForecasts-PlanningResources-PlanningAmounts-PlanningAmountDetails-item-response
Type: object
Show Source
  • Title: Burdened Cost: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in planning currency from the start of the project till the current date.
  • Title: Burdened Cost in Project Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project currency from the start of the project till the current date.
  • Title: Burdened Cost in Project Ledger Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project ledger currency from the start of the project till the current date.
  • Title: Burdened Cost Rate
    Read Only: true
    Actual burdened cost rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
  • Title: Quantity: Actual Amount
    Read Only: true
    Actual effort for the forecast version resource assignment from the start of the project till the current date.
  • Title: Raw Cost: Actual Amount
    Read Only: true
    Actual cost incurred for the period in the forecast version resource assignment in planning currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: Raw Cost in Project Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment in project currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: Raw Cost in Project Ledger Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: EAC Actual Raw Cost Rate
    Read Only: true
    Rate that is used to calculate the actual cost for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: Actual Amount
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in planning currency from the inception of the project to date.
  • Title: Revenue in Project Currency: Actual Amounts
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in project currency from the inception of the project to date.
  • Title: Revenue in Project Ledger Currency: Actual Amounts
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in project ledger currency from the inception of the project to date.
  • Title: Revenue Rate: Actual Amount
    Read Only: true
    Rate that is used to calculate the actual revenue for the forecast version resource assignment.
  • Title: Burdened Cost: EAC
    Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost in Project Currency: EAC
    Read Only: true
    Estimated cost in project currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost in Project Ledger Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost: Total Burdened Cost Rate
    Read Only: true
    Rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
  • Title: Quantity: EAC
    Measure of the effort planned for in the forecast version resource assignment.
  • Title: Raw Cost: EAC
    Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost: Total Raw Cost Rate
    Read Only: true
    Rate that is used to calculate the estimated cost at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue
    Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue in Project Ledger Currency: EAC
    Read Only: true
    Estimated revenue amount in project currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue in Project Ledger Currency: EAC
    Read Only: true
    Estimated revenue amount in project ledger currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue Rate
    Read Only: true
    Rate that is used to calculate the estimated revenue at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Raw Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Title: Effective Revenue Rate
    Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue.
  • Title: Burdened Cost: ETC
    Read Only: true
    Estimated remaining cost in planning currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Burdened Cost in Project Currency: ETC
    Read Only: true
    Estimated remaining cost in project currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Burdened Cost in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining cost in project ledger currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Quantity: ETC
    Read Only: true
    Estimated remaining effort by the forecast version resource assignment for completion.
  • Title: Raw Cost: ETC
    Read Only: true
    Estimated remaining cost in planning currency required for completion of the task in the period by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: ETC
    Read Only: true
    Estimated remaining cost in project currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining cost in project ledger currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: ETC
    Read Only: true
    Estimated remaining revenue amount in planning currency to be recognized for the forecast version resource assignment.
  • Title: Previous Forecast Revenue in Project Currency: ETC
    Read Only: true
    Estimated remaining revenue amount in project currency to be recognized for the forecast version resource assignment.
  • Title: Revenue in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining revenue amount in project ledger currency to be recognized for the forecast version resource assignment.
  • Links
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Period
    Maximum Length: 30
    Period for which the periodic forecast amount is entered.
  • Identifier of the periodic level planning amounts for a resource assignment in the forecast version.
  • Title: Burdened Cost Commitments: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Purchase Orders
    Read Only: true
    Effort for the forecast version resource assignment committed through purchase orders.
  • Title: Raw Cost Commitments: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost Commitments: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Requisitions
    Read Only: true
    Effort for the forecast version resource assignment committed through requisitions.
  • Title: Raw Cost Commitments: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost: Standard Rate
    Read Only: true
    Average rate derived from the rate schedule for calculating the planned burdened cost for the forecast version resource assignment.
  • Title: Raw Cost: Standard Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned raw cost for the forecast version resource assignment.
  • Title: Standard Revenue Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned revenue for the forecast version resource assignment.
  • Title: Burdened Cost Commitments: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Supplier Invoices
    Read Only: true
    Effort for the forecast version resource assignment committed through supplier invoices.
  • Title: Raw Cost Commitments: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Ledger Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project ledger currency that includes both raw and burden costs.
  • Title: Quantity: Total Commitments
    Read Only: true
    Committed effort for the forecast version resource assignment.
  • Title: Raw Cost: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project currency that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost Commitments: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Transfer Orders
    Read Only: true
    Effort for the forecast version resource assignment committed through transfer orders.
  • Title: Raw Cost Commitments: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that is directly attributable to the work performed.