Create a planning resource for a project forecast version

post

/fscmRestApi/resources/11.13.18.05/projectForecasts/{PlanVersionId}/child/PlanningResources

Request

Path Parameters
Header Parameters
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
  • Contains one of the following values: true or false. If true, the server performs an Upsert operation instead of a Create operation. During an Upsert operation, the server attempts to find an existing resource that matches the payload. If a match is found, the server updates the existing resource instead of creating a new one. If not found or false (default), the server performs a Create operation. Note that the Upsert operation isn't supported for date-effective REST resources.
Supported Media Types
Request Body - application/json ()
Root Schema : schema
Type: object
Show Source
  • Default Value: N
    Indicates whether the periodic planning is retained in the plan version on plan line date modifications.
  • Planning Amounts
    Title: Planning Amounts
    The Planning Amounts resource is used to view project forecast resource assignment summary amounts.
  • Title: Planning Element ID
    Identifier of the planning resources of the forecast version.
  • Title: Planning Dates: To Date
    The date that is planned on the financial plan for a resource to begin their assignment on a project task.
  • Title: Planning Dates: From Date
    The date that is planned on the financial plan for a resource to finish their assignment on a project task.
  • Title: Planning Resource
    Identifier of the resource breakdown structure element used to create the financial plan resource assignment.
  • Title: Resource
    Maximum Length: 240
    Name or alias of the resource included in the planning resource breakdown structure that is used to create the financial plan resource assignment.
  • Title: Task
    Identifier of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment.
  • Title: Task Name
    Maximum Length: 255
    Name of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task ID, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment.
  • Title: Task Number
    Maximum Length: 100
    Number of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task ID but not for all three or a combination of them while creating a financial plan resource assignment.
Nested Schema : Planning Amounts
Type: array
Title: Planning Amounts
The Planning Amounts resource is used to view project forecast resource assignment summary amounts.
Show Source
Nested Schema : schema
Type: object
Show Source
  • Maximum Length: 15
    Code that identifies the planning currency on the forecast version resource assignment.
  • Title: Burdened Cost
    Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Quantity: EAC
    Measure of the effort planned for in the forecast version resource assignment.
  • Title: Raw Cost
    Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: EAC
    Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Burdened Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Effective ETC Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Title: Revenue: Effective Rate
    Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue.
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Plan Line ID
    Identifier of the summary level planning amounts for a resource assignment in the forecast version.
  • Plan Lines Descriptive Flexfields
    Title: Plan Lines Descriptive Flexfields
    The Plan Lines Descriptive Flexfields resource is used to capture and view additional information for planning amounts in project forecasts.
  • Planning Amount Details
    Title: Planning Amount Details
    The Planning Amount Details resource is used to view project forecast resource assignment periodic amounts.
Nested Schema : Plan Lines Descriptive Flexfields
Type: array
Title: Plan Lines Descriptive Flexfields
The Plan Lines Descriptive Flexfields resource is used to capture and view additional information for planning amounts in project forecasts.
Show Source
Nested Schema : Planning Amount Details
Type: array
Title: Planning Amount Details
The Planning Amount Details resource is used to view project forecast resource assignment periodic amounts.
Show Source
Nested Schema : projectForecasts-PlanningResources-PlanningAmounts-PlanLinesDFF-item-post-request
Type: object
Show Source
Nested Schema : projectForecasts-PlanningResources-PlanningAmounts-PlanningAmountDetails-item-post-request
Type: object
Show Source
  • Title: Burdened Cost: EAC
    Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Quantity: EAC
    Measure of the effort planned for in the forecast version resource assignment.
  • Title: Raw Cost: EAC
    Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue
    Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Burdened Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Raw Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Title: Effective Revenue Rate
    Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue.
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Period
    Maximum Length: 30
    Period for which the periodic forecast amount is entered.
  • Identifier of the periodic level planning amounts for a resource assignment in the forecast version.
Back to Top

Response

Supported Media Types

Default Response

The following table describes the default response for this task.
Headers
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Body ()
Root Schema : projectForecasts-PlanningResources-item-response
Type: object
Show Source
  • Links
  • Default Value: N
    Indicates whether the periodic planning is retained in the plan version on plan line date modifications.
  • Planning Amounts
    Title: Planning Amounts
    The Planning Amounts resource is used to view project forecast resource assignment summary amounts.
  • Title: Planning Element ID
    Identifier of the planning resources of the forecast version.
  • Title: Planning Dates: To Date
    The date that is planned on the financial plan for a resource to begin their assignment on a project task.
  • Title: Planning Dates: From Date
    The date that is planned on the financial plan for a resource to finish their assignment on a project task.
  • Title: Planning Resource
    Identifier of the resource breakdown structure element used to create the financial plan resource assignment.
  • Title: Resource Class
    Read Only: true
    Maximum Length: 240
    Grouping of predefined resource types to which the resource in the financial plan resource assignment belongs. A list of valid values are Labor, Equipment, Material Items, and Financial Resources.
  • Title: Resource
    Maximum Length: 240
    Name or alias of the resource included in the planning resource breakdown structure that is used to create the financial plan resource assignment.
  • Title: Task
    Identifier of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment.
  • Title: Task Name
    Maximum Length: 255
    Name of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task ID, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment.
  • Title: Task Number
    Maximum Length: 100
    Number of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task ID but not for all three or a combination of them while creating a financial plan resource assignment.
  • Title: Unit of Measure
    Read Only: true
    Unit of work that measures the quantity of effort for which the resource is planned for on the financial plan resource assignment.
Nested Schema : Planning Amounts
Type: array
Title: Planning Amounts
The Planning Amounts resource is used to view project forecast resource assignment summary amounts.
Show Source
Nested Schema : projectForecasts-PlanningResources-PlanningAmounts-item-response
Type: object
Show Source
  • Title: Actual Burdened Cost
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in planning currency from the start of the project till the current date.
  • Title: Burdened Cost in Project Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project currency from the start of the project till the current date.
  • Title: Burdened Cost in Project Ledger Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project ledger currency from the start of the project till the current date.
  • Title: Burdened Cost Rate
    Read Only: true
    Actual burdened cost rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
  • Title: Actual Quantity
    Read Only: true
    Actual effort for the forecast version resource assignment from the start of the project till the current date.
  • Title: Actual Raw Cost
    Read Only: true
    Actual cost incurred for the period in the forecast version resource assignment in planning currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: Raw Cost in Project Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment in project currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: Raw Cost in Project Ledger Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed from the start of the project till the current date.
  • Read Only: true
    Rate that is used to calculate the actual cost for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: Actual Amount
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in planning currency from the inception of the project to date.
  • Title: Revenue in Project Currency: Actual Amounts
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in project currency from the inception of the project to date.
  • Title: Revenue in Project Ledger Currency: Actual Amount
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in project ledger currency from the inception of the project to date.
  • Title: Actual Rate
    Read Only: true
    Rate that is used to calculate the actual revenue for the forecast version resource assignment.
  • Maximum Length: 15
    Code that identifies the planning currency on the forecast version resource assignment.
  • Title: Burdened Cost
    Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost in Project Currency: EAC
    Read Only: true
    Estimated cost in project currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost in Project Ledger Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost: Total Burdened Cost Rate
    Read Only: true
    Rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
  • Title: Quantity: EAC
    Measure of the effort planned for in the forecast version resource assignment.
  • Title: Raw Cost
    Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost: Total Raw Cost Rate
    Read Only: true
    Rate that is used to calculate the estimated cost at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: EAC
    Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue in Project Currency: EAC
    Read Only: true
    Estimated revenue amount in project currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue in Project Ledger Currency: EAC
    Read Only: true
    Estimated revenue amount in project ledger currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Effective Rate
    Read Only: true
    Rate that is used to calculate the estimated revenue at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Effective ETC Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Title: Revenue: Effective Rate
    Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue.
  • Title: ETC Burdened Cost
    Read Only: true
    Estimated remaining cost in planning currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Burdened Cost in Project Currency: ETC
    Read Only: true
    Estimated remaining cost in project currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Burdened Cost in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining cost in project ledger currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Quantity: ETC
    Read Only: true
    Estimated remaining effort by the forecast version resource assignment for completion.
  • Title: ETC Raw Cost
    Read Only: true
    Estimated remaining cost in planning currency required for completion of the task in the period by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: ETC
    Read Only: true
    Estimated remaining cost in project currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining cost in project ledger currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: ETC
    Read Only: true
    Estimated remaining revenue amount in planning currency to be recognized for the forecast version resource assignment.
  • Title: Revenue in Project Currency: ETC
    Read Only: true
    Estimated remaining revenue amount in project currency to be recognized for the forecast version resource assignment.
  • Title: Revenue in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining revenue amount in project ledger currency to be recognized for the forecast version resource assignment.
  • Links
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Plan Line ID
    Identifier of the summary level planning amounts for a resource assignment in the forecast version.
  • Plan Lines Descriptive Flexfields
    Title: Plan Lines Descriptive Flexfields
    The Plan Lines Descriptive Flexfields resource is used to capture and view additional information for planning amounts in project forecasts.
  • Planning Amount Details
    Title: Planning Amount Details
    The Planning Amount Details resource is used to view project forecast resource assignment periodic amounts.
  • Title: Burdened Cost Commitments: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Purchase Orders
    Read Only: true
    Effort for the forecast version resource assignment committed through purchase orders.
  • Title: Raw Cost Commitments: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost Commitments: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project ledger currency that includes both raw and burden costs.
  • Title: Requisitions
    Read Only: true
    Effort for the forecast version resource assignment committed through requisitions.
  • Title: Raw Cost Commitments: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project ledger currency that is directly attributable to the work performed.
  • Title: Standard Burdened Cost Rate
    Read Only: true
    Average rate derived from the rate schedule for calculating the planned burdened cost for the forecast version resource assignment.
  • Title: Standard ETC Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned raw cost for the forecast version resource assignment.
  • Title: Revenue: Standard Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned revenue for the forecast version resource assignment.
  • Title: Burdened Cost Commitments: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Supplier Invoices
    Read Only: true
    Effort for the forecast version resource assignment committed through supplier invoices.
  • Title: Raw Cost Commitments: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Ledger Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project ledger currency that includes both raw and burden costs.
  • Title: Quantity: Total Commitments
    Read Only: true
    Committed effort for the forecast version resource assignment.
  • Title: Raw Cost: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project currency that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost Commitments: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Transfer Orders
    Read Only: true
    Effort for the forecast version resource assignment committed through transfer orders.
  • Title: Raw Cost Commitments: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that is directly attributable to the work performed.
Nested Schema : Plan Lines Descriptive Flexfields
Type: array
Title: Plan Lines Descriptive Flexfields
The Plan Lines Descriptive Flexfields resource is used to capture and view additional information for planning amounts in project forecasts.
Show Source
Nested Schema : Planning Amount Details
Type: array
Title: Planning Amount Details
The Planning Amount Details resource is used to view project forecast resource assignment periodic amounts.
Show Source
Nested Schema : projectForecasts-PlanningResources-PlanningAmounts-PlanLinesDFF-item-response
Type: object
Show Source
Nested Schema : projectForecasts-PlanningResources-PlanningAmounts-PlanningAmountDetails-item-response
Type: object
Show Source
  • Title: Burdened Cost: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in planning currency from the start of the project till the current date.
  • Title: Burdened Cost in Project Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project currency from the start of the project till the current date.
  • Title: Burdened Cost in Project Ledger Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project ledger currency from the start of the project till the current date.
  • Title: Burdened Cost Rate
    Read Only: true
    Actual burdened cost rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
  • Title: Quantity: Actual Amount
    Read Only: true
    Actual effort for the forecast version resource assignment from the start of the project till the current date.
  • Title: Raw Cost: Actual Amount
    Read Only: true
    Actual cost incurred for the period in the forecast version resource assignment in planning currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: Raw Cost in Project Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment in project currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: Raw Cost in Project Ledger Currency: Actual Amounts
    Read Only: true
    Actual cost incurred for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed from the start of the project till the current date.
  • Title: EAC Actual Raw Cost Rate
    Read Only: true
    Rate that is used to calculate the actual cost for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: Actual Amount
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in planning currency from the inception of the project to date.
  • Title: Revenue in Project Currency: Actual Amounts
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in project currency from the inception of the project to date.
  • Title: Revenue in Project Ledger Currency: Actual Amounts
    Read Only: true
    Amount of revenue recognized for the forecast version resource assignment in project ledger currency from the inception of the project to date.
  • Title: Revenue Rate: Actual Amount
    Read Only: true
    Rate that is used to calculate the actual revenue for the forecast version resource assignment.
  • Title: Burdened Cost: EAC
    Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost in Project Currency: EAC
    Read Only: true
    Estimated cost in project currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost in Project Ledger Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost: Total Burdened Cost Rate
    Read Only: true
    Rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs.
  • Title: Quantity: EAC
    Measure of the effort planned for in the forecast version resource assignment.
  • Title: Raw Cost: EAC
    Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: EAC
    Read Only: true
    Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost: Total Raw Cost Rate
    Read Only: true
    Rate that is used to calculate the estimated cost at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue
    Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue in Project Ledger Currency: EAC
    Read Only: true
    Estimated revenue amount in project currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue in Project Ledger Currency: EAC
    Read Only: true
    Estimated revenue amount in project ledger currency recognized for the forecast version resource assignment at the completion of the task.
  • Title: Revenue Rate
    Read Only: true
    Rate that is used to calculate the estimated revenue at the completion of the task for the forecast version resource assignment.
  • Title: Burdened Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts.
  • Title: Raw Cost: Effective Rate
    Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts.
  • Title: Effective Revenue Rate
    Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue.
  • Title: Burdened Cost: ETC
    Read Only: true
    Estimated remaining cost in planning currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Burdened Cost in Project Currency: ETC
    Read Only: true
    Estimated remaining cost in project currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Burdened Cost in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining cost in project ledger currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment.
  • Title: Quantity: ETC
    Read Only: true
    Estimated remaining effort by the forecast version resource assignment for completion.
  • Title: Raw Cost: ETC
    Read Only: true
    Estimated remaining cost in planning currency required for completion of the task in the period by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: ETC
    Read Only: true
    Estimated remaining cost in project currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining cost in project ledger currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed.
  • Title: Revenue: ETC
    Read Only: true
    Estimated remaining revenue amount in planning currency to be recognized for the forecast version resource assignment.
  • Title: Previous Forecast Revenue in Project Currency: ETC
    Read Only: true
    Estimated remaining revenue amount in project currency to be recognized for the forecast version resource assignment.
  • Title: Revenue in Project Ledger Currency: ETC
    Read Only: true
    Estimated remaining revenue amount in project ledger currency to be recognized for the forecast version resource assignment.
  • Links
  • Maximum Length: 1
    Indicates if the periodic planning is modified and retained for the plan line on date changes.
  • Title: Period
    Maximum Length: 30
    Period for which the periodic forecast amount is entered.
  • Identifier of the periodic level planning amounts for a resource assignment in the forecast version.
  • Title: Burdened Cost Commitments: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Purchase Orders
    Read Only: true
    Effort for the forecast version resource assignment committed through purchase orders.
  • Title: Raw Cost Commitments: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Purchase Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost Commitments: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Requisitions
    Read Only: true
    Effort for the forecast version resource assignment committed through requisitions.
  • Title: Raw Cost Commitments: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Requisitions
    Read Only: true
    Cost for the forecast version resource assignment committed through requisitions in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost: Standard Rate
    Read Only: true
    Average rate derived from the rate schedule for calculating the planned burdened cost for the forecast version resource assignment.
  • Title: Raw Cost: Standard Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned raw cost for the forecast version resource assignment.
  • Title: Standard Revenue Rate
    Read Only: true
    Rate derived from the rate schedule for calculating the planned revenue for the forecast version resource assignment.
  • Title: Burdened Cost Commitments: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Supplier Invoices
    Read Only: true
    Effort for the forecast version resource assignment committed through supplier invoices.
  • Title: Raw Cost Commitments: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
    Read Only: true
    Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project currency that includes both raw and burden costs.
  • Title: Burdened Cost in Project Ledger Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project ledger currency that includes both raw and burden costs.
  • Title: Quantity: Total Commitments
    Read Only: true
    Committed effort for the forecast version resource assignment.
  • Title: Raw Cost: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost in Project Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project currency that is directly attributable to the work performed.
  • Title: Raw Cost in Project Ledger Currency: Total Commitments
    Read Only: true
    Total committed cost for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed.
  • Title: Burdened Cost Commitments: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in planning currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project currency that includes both raw and burden costs.
  • Title: Burdened Cost Commitments in Project Ledger Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that includes both raw and burden costs.
  • Title: Quantity Commitments: Transfer Orders
    Read Only: true
    Effort for the forecast version resource assignment committed through transfer orders.
  • Title: Raw Cost Commitments: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in planning currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project currency that is directly attributable to the work performed.
  • Title: Raw Cost Commitments in Project Ledger Currency: Transfer Orders
    Read Only: true
    Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that is directly attributable to the work performed.
Back to Top

Examples

The following example shows how to create planning resources for project forecast versions using a batch operation.

curl --user ppm_cloud_user -X POST -H "Content-Type: application/vnd.oracle.adf.batch+json" -d @example_request_payload.json "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05" -H 'cache-control: no-cache'

Request Body Example

The following shows an example of the request body in JSON format.

{
   "parts":[
      {
         "id":"part1",
         "path":"/projectForecasts/300100185480716/child/PlanningResources",
         "operation":"create",
         "payload":{
                  "TaskNumber":"2.0",
                  "ResourceName":"Labor",
                  "PlanningStartDate":"2012-01-01T00:00:00+05:30",
                  "PlanningEndDate":"2015-12-31T00:00:00+05:30",
                  "PlanningAmounts":[
                     {
                        "EACQuantity":"10",
                        "Currency":"USD",
                        "EACRawCost":"1000",
                        "EACBurdenedCost":"2500",
                        "PlanningAmountDetails":[
                           {
                              "PeriodName":"Dec-13",
                              "EACQuantity":10,
                              "EACRawCost":"1000",
                              "EACBurdenedCost":"2500"
                           }
                        ]
                     }
                  ]
               }
      },
      {
         "id":"part2",
         "path":"/projectForecasts/300100185480720/child/PlanningResources",
         "operation":"create",
         "payload":{
                  "TaskNumber":"2.0",
                  "ResourceName":"Labor",
                  "PlanningStartDate":"2012-01-01T00:00:00+05:30",
                  "PlanningEndDate":"2015-12-31T00:00:00+05:30",
                  "PlanningAmounts":[
                     {
                        "EACQuantity":"10",
                        "Currency":"USD",
                        "EACRawCost":"1000",
                        "EACBurdenedCost":"2500",
                        "PlanningAmountDetails":[
                           {
                              "PeriodName":"Dec-19",
                              "EACQuantity":10,
                              "EACRawCost":"1000",
                              "EACBurdenedCost":"2500"
                           }
                        ]
                     }
                  ]
               }
      },
      {
         "id":"part3",
         "path":"/projectForecasts/300100185480724/child/PlanningResources",
         "operation":"create",
         "payload":{
                  "TaskNumber":"2.0",
                  "ResourceName":"Labor",
                  "PlanningStartDate":"2012-01-01T00:00:00+05:30",
                  "PlanningEndDate":"2015-12-31T00:00:00+05:30",
                  "PlanningAmounts":[
                     {
                        "EACQuantity":"10",
                        "Currency":"USD",
                        "EACRawCost":"1000",
                        "EACBurdenedCost":"2500",
                        "PlanningAmountDetails":[
                           {
                              "PeriodName":"Dec-19",
                              "EACQuantity":10,
                              "EACRawCost":"1000",
                              "EACBurdenedCost":"2500"
                           }
                        ]
                     }
                  ]
               }
      }
   ]
}

Response Body Example

The following shows an example of the response body in JSON format.

{
"parts": [
  {
"id": "part1",
"path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources",
"operation": "create",
"payload": {
"PlanningElementId": 300100185480760,
"TaskId": 300100023161791,
"TaskNumber": "2.0",
"TaskName": "Electrical",
"RbsElementId": 100100008580900,
"ResourceName": "Labor",
"UnitOfMeasure": "Hours",
"ResourceClass": "Labor",
"PlanningStartDate": "2011-12-31T18:30:00+00:00",
"PlanningEndDate": "2015-12-30T18:30:00+00:00",
"PlanningAmounts": {
"items": [
  {
"PlanLineId": 300100185480761,
"TotalCommittedQuantity": null,
"ActualQuantity": null,
"ETCQuantity": 10,
"EACQuantity": 10,
"Currency": "USD",
"TotalCommittedRawCost": null,
"ActualRawCost": null,
"ETCRawCost": 1000,
"EACRawCost": 1000,
"StandardETCRawCostRate": null,
"EffectiveETCRawCostRate": 100,
"ActualRawCostRate": 0,
"EACRawCostRate": 100,
"TotalCommittedBurdenedCost": null,
"ActualBurdenedCost": null,
"ETCBurdenedCost": 2500,
"EACBurdenedCost": 2500,
"StandardETCBurdenedCostRate": null,
"EffectiveETCBurdenedCostRate": 250,
"ActualBurdenedCostRate": 0,
"EACBurdenedCostRate": 250,
"RequisitionCommittedQuantity": null,
"PurchaseOrderCommittedQuantity": null,
"SupplierInvoiceCommittedQuantity": null,
"TransferOrderCommittedQuantity": null,
"RequisitionCommittedRawCost": null,
"PurchaseOrderCommittedRawCost": null,
"SupplierInvoiceCommittedRawCost": null,
"TransferOrderCommittedRawCost": null,
"RequisitionCommittedBurdenedCost": null,
"PurchaseOrderCommittedBurdenedCost": null,
"SupplierInvoiceCommittedBurdenedCost": null,
"TransferOrderCommittedBurdenedCost": null,
"TotalCommittedRawCostInProjectCurrency": 0,
"ActualRawCostInProjectCurrency": null,
"ETCRawCostInProjectCurrency": null,
"EACRawCostInProjectCurrency": null,
"RequisitionCommittedRawCostInProjectCurrency": null,
"PurchaseOrderCommittedRawCostInProjectCurrency": null,
"SupplierInvoiceCommittedRawCostinProjectCurrency": null,
"TransferOrderCommittedRawCostInProjectCurrency": null,
"TotalCommittedRawCostInProjectLedgerCurrency": 0,
"ActualRawCostInProjectLedgerCurrency": null,
"ETCRawCostInProjectLedgerCurrency": null,
"EACRawCostInProjectLedgerCurrency": null,
"RequisitionCommittedRawCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedRawCostinProjectLedgerCurrency": null,
"TransferOrderCommittedRawCostInProjectLedgerCurrency": null,
"TotalCommittedBurdenedCostInProjectCurrency": null,
"ActualBurdenedCostInProjectCurrency": null,
"ETCBurdenedCostInProjectCurrency": 0,
"EACBurdenedCostInProjectCurrency": null,
"RequisitionCommittedBurdenedCostInProjectCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectCurrency": null,
"SupplierInvoiceCommittedBurdenedCostinProjectCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectCurrency": null,
"TotalCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualBurdenedCostInProjectLedgerCurrency": null,
"ETCBurdenedCostInProjectLedgerCurrency": 0,
"EACBurdenedCostInProjectLedgerCurrency": null,
"RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedBurdenedCostinProjectLedgerCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualRevenue": null,
"ETCRevenue": 0,
"EACRevenue": null,
"StandardETCRevenueRate": null,
"EffectiveETCRevenueRate": null,
"ActualRevenueRate": 0,
"EACRevenueRate": 0,
"ActualRevenueInProjectCurrency": null,
"ETCRevenueInProjectCurrency": 0,
"EACRevenueInProjectCurrency": null,
"ActualRevenueInProjectLedgerCurrency": null,
"ETCRevenueInProjectLedgerCurrency": 0,
"EACRevenueInProjectLedgerCurrency": null,
"PlanningAmountDetails": {
"items": [
  {
"PlanLineDetailId": 300100185480762,
"TotalCommittedQuantity": null,
"ActualQuantity": null,
"ETCQuantity": 10,
"EACQuantity": 10,
"PeriodName": "Dec-13",
"TotalCommittedRawCost": null,
"ActualRawCost": null,
"ETCRawCost": 1000,
"EACRawCost": 1000,
"StandardETCRawCostRate": null,
"EffectiveETCRawCostRate": 100,
"ActualRawCostRate": 0,
"EACRawCostRate": 100,
"TotalCommittedBurdenedCost": null,
"ActualBurdenedCost": null,
"ETCBurdenedCost": 2500,
"EACBurdenedCost": 2500,
"StandardETCBurdenedCostRate": null,
"EffectiveETCBurdenedCostRate": 250,
"ActualBurdenedCostRate": 0,
"EACBurdenedCostRate": 250,
"RequisitionCommittedQuantity": null,
"PurchaseOrderCommittedQuantity": null,
"SupplierInvoiceCommittedQuantity": null,
"TransferOrderCommittedQuantity": null,
"RequisitionCommittedRawCost": null,
"PurchaseOrderCommittedRawCost": null,
"SupplierInvoiceCommittedRawCost": null,
"TransferOrderCommittedRawCost": null,
"RequisitionCommittedBurdenedCost": null,
"PurchaseOrderCommittedBurdenedCost": null,
"SupplierInvoiceCommittedBurdenedCost": null,
"TransferOrderCommittedBurdenedCost": null,
"TotalCommittedRawCostInProjectCurrency": 0,
"ActualRawCostInProjectCurrency": null,
"ETCRawCostInProjectCurrency": null,
"EACRawCostInProjectCurrency": null,
"RequisitionCommittedRawCostInProjectCurrency": null,
"PurchaseOrderCommittedRawCostInProjectCurrency": null,
"SupplierInvoiceCommittedRawCostInProjectCurrency": null,
"TransferOrderCommittedRawCostInProjectCurrency": null,
"TotalCommittedRawCostInProjectLedgerCurrency": 0,
"ActualRawCostInProjectLedgerCurrency": null,
"ETCRawCostInProjectLedgerCurrency": null,
"EACRawCostInProjectLedgerCurrency": null,
"RequisitionCommittedRawCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedRawCostInProjectLedgerCurrency": null,
"TransferOrderCommittedRawCostInProjectLedgerCurrency": null,
"TotalCommittedBurdenedCostInProjectCurrency": null,
"ActualBurdenedCostInProjectCurrency": null,
"ETCBurdenedCostInProjectCurrency": 0,
"EACBurdenedCostInProjectCurrency": null,
"RequisitionCommittedBurdenedCostInProjectCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectCurrency": null,
"SupplierInvoiceCommittedBurdenedCostInProjectCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectCurrency": null,
"TotalCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualBurdenedCostInProjectLedgerCurrency": null,
"ETCBurdenedCostInProjectLedgerCurrency": 0,
"EACBurdenedCostInProjectLedgerCurrency": null,
"RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualRevenue": null,
"ETCRevenue": 0,
"EACRevenue": null,
"StandardETCRevenueRate": null,
"EffectiveETCRevenueRate": null,
"ActualRevenueRate": 0,
"EACRevenueRate": 0,
"ActualRevenueInProjectCurrency": null,
"ETCRevenueInProjectCurrency": 0,
"EACRevenueInProjectCurrency": null,
"ActualRevenueInProjectLedgerCurrency": null,
"ETCRevenueInProjectLedgerCurrency": 0,
"EACRevenueInProjectLedgerCurrency": null,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761/child/PlanningAmountDetails/300100185480762",
"name": "PlanningAmountDetails",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761/child/PlanningAmountDetails/300100185480762",
"name": "PlanningAmountDetails",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761",
"name": "PlanningAmounts",
"kind": "item"
}
],
}
],
"count": 1,
"hasMore": false,
"limit": 24,
"offset": 0,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761/child/PlanningAmountDetails",
"name": "PlanningAmountDetails",
"kind": "collection"
}
],
},
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761",
"name": "PlanningAmounts",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761",
"name": "PlanningAmounts",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760",
"name": "PlanningResources",
"kind": "item"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761/child/PlanLinesDFF",
"name": "PlanLinesDFF",
"kind": "collection"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts/300100185480761/child/PlanningAmountDetails",
"name": "PlanningAmountDetails",
"kind": "collection"
}
],
}
],
"count": 1,
"hasMore": false,
"limit": 24,
"offset": 0,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts",
"name": "PlanningAmounts",
"kind": "collection"
}
],
},
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760",
"name": "PlanningResources",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760",
"name": "PlanningResources",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716",
"name": "projectForecasts",
"kind": "item"
},
  {
"rel": "lov",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/lov/PrimaryPlanningRBSLOVVO",
"name": "PrimaryPlanningRBSLOVVO",
"kind": "collection"
},
  {
"rel": "lov",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/lov/FinancialTaskVersionLOVVO",
"name": "FinancialTaskVersionLOVVO",
"kind": "collection"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480716/child/PlanningResources/300100185480760/child/PlanningAmounts",
"name": "PlanningAmounts",
"kind": "collection"
}
],
}
},
  {
"id": "part2",
"path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources",
"operation": "create",
"payload": {
"PlanningElementId": 300100185480763,
"TaskId": 100100048824025,
"TaskNumber": "2.0",
"TaskName": "Design Development Phase",
"RbsElementId": 100100048824017,
"ResourceName": "Labor",
"UnitOfMeasure": "Hours",
"ResourceClass": "Labor",
"PlanningStartDate": "2011-12-31T18:30:00+00:00",
"PlanningEndDate": "2015-12-30T18:30:00+00:00",
"PlanningAmounts": {
"items": [
  {
"PlanLineId": 300100185480764,
"TotalCommittedQuantity": null,
"ActualQuantity": null,
"ETCQuantity": 10,
"EACQuantity": 10,
"Currency": "USD",
"TotalCommittedRawCost": null,
"ActualRawCost": null,
"ETCRawCost": 1000,
"EACRawCost": 1000,
"StandardETCRawCostRate": null,
"EffectiveETCRawCostRate": 100,
"ActualRawCostRate": 0,
"EACRawCostRate": 100,
"TotalCommittedBurdenedCost": null,
"ActualBurdenedCost": null,
"ETCBurdenedCost": 2500,
"EACBurdenedCost": 2500,
"StandardETCBurdenedCostRate": null,
"EffectiveETCBurdenedCostRate": 250,
"ActualBurdenedCostRate": 0,
"EACBurdenedCostRate": 250,
"RequisitionCommittedQuantity": null,
"PurchaseOrderCommittedQuantity": null,
"SupplierInvoiceCommittedQuantity": null,
"TransferOrderCommittedQuantity": null,
"RequisitionCommittedRawCost": null,
"PurchaseOrderCommittedRawCost": null,
"SupplierInvoiceCommittedRawCost": null,
"TransferOrderCommittedRawCost": null,
"RequisitionCommittedBurdenedCost": null,
"PurchaseOrderCommittedBurdenedCost": null,
"SupplierInvoiceCommittedBurdenedCost": null,
"TransferOrderCommittedBurdenedCost": null,
"TotalCommittedRawCostInProjectCurrency": 0,
"ActualRawCostInProjectCurrency": null,
"ETCRawCostInProjectCurrency": null,
"EACRawCostInProjectCurrency": null,
"RequisitionCommittedRawCostInProjectCurrency": null,
"PurchaseOrderCommittedRawCostInProjectCurrency": null,
"SupplierInvoiceCommittedRawCostinProjectCurrency": null,
"TransferOrderCommittedRawCostInProjectCurrency": null,
"TotalCommittedRawCostInProjectLedgerCurrency": 0,
"ActualRawCostInProjectLedgerCurrency": null,
"ETCRawCostInProjectLedgerCurrency": null,
"EACRawCostInProjectLedgerCurrency": null,
"RequisitionCommittedRawCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedRawCostinProjectLedgerCurrency": null,
"TransferOrderCommittedRawCostInProjectLedgerCurrency": null,
"TotalCommittedBurdenedCostInProjectCurrency": null,
"ActualBurdenedCostInProjectCurrency": null,
"ETCBurdenedCostInProjectCurrency": 0,
"EACBurdenedCostInProjectCurrency": null,
"RequisitionCommittedBurdenedCostInProjectCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectCurrency": null,
"SupplierInvoiceCommittedBurdenedCostinProjectCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectCurrency": null,
"TotalCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualBurdenedCostInProjectLedgerCurrency": null,
"ETCBurdenedCostInProjectLedgerCurrency": 0,
"EACBurdenedCostInProjectLedgerCurrency": null,
"RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedBurdenedCostinProjectLedgerCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualRevenue": null,
"ETCRevenue": 0,
"EACRevenue": null,
"StandardETCRevenueRate": null,
"EffectiveETCRevenueRate": null,
"ActualRevenueRate": 0,
"EACRevenueRate": 0,
"ActualRevenueInProjectCurrency": null,
"ETCRevenueInProjectCurrency": 0,
"EACRevenueInProjectCurrency": null,
"ActualRevenueInProjectLedgerCurrency": null,
"ETCRevenueInProjectLedgerCurrency": 0,
"EACRevenueInProjectLedgerCurrency": null,
"PlanningAmountDetails": {
"items": [
  {
"PlanLineDetailId": 300100185480765,
"TotalCommittedQuantity": null,
"ActualQuantity": null,
"ETCQuantity": 10,
"EACQuantity": 10,
"PeriodName": "Dec-19",
"TotalCommittedRawCost": null,
"ActualRawCost": null,
"ETCRawCost": 1000,
"EACRawCost": 1000,
"StandardETCRawCostRate": null,
"EffectiveETCRawCostRate": 100,
"ActualRawCostRate": 0,
"EACRawCostRate": 100,
"TotalCommittedBurdenedCost": null,
"ActualBurdenedCost": null,
"ETCBurdenedCost": 2500,
"EACBurdenedCost": 2500,
"StandardETCBurdenedCostRate": null,
"EffectiveETCBurdenedCostRate": 250,
"ActualBurdenedCostRate": 0,
"EACBurdenedCostRate": 250,
"RequisitionCommittedQuantity": null,
"PurchaseOrderCommittedQuantity": null,
"SupplierInvoiceCommittedQuantity": null,
"TransferOrderCommittedQuantity": null,
"RequisitionCommittedRawCost": null,
"PurchaseOrderCommittedRawCost": null,
"SupplierInvoiceCommittedRawCost": null,
"TransferOrderCommittedRawCost": null,
"RequisitionCommittedBurdenedCost": null,
"PurchaseOrderCommittedBurdenedCost": null,
"SupplierInvoiceCommittedBurdenedCost": null,
"TransferOrderCommittedBurdenedCost": null,
"TotalCommittedRawCostInProjectCurrency": 0,
"ActualRawCostInProjectCurrency": null,
"ETCRawCostInProjectCurrency": null,
"EACRawCostInProjectCurrency": null,
"RequisitionCommittedRawCostInProjectCurrency": null,
"PurchaseOrderCommittedRawCostInProjectCurrency": null,
"SupplierInvoiceCommittedRawCostInProjectCurrency": null,
"TransferOrderCommittedRawCostInProjectCurrency": null,
"TotalCommittedRawCostInProjectLedgerCurrency": 0,
"ActualRawCostInProjectLedgerCurrency": null,
"ETCRawCostInProjectLedgerCurrency": null,
"EACRawCostInProjectLedgerCurrency": null,
"RequisitionCommittedRawCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedRawCostInProjectLedgerCurrency": null,
"TransferOrderCommittedRawCostInProjectLedgerCurrency": null,
"TotalCommittedBurdenedCostInProjectCurrency": null,
"ActualBurdenedCostInProjectCurrency": null,
"ETCBurdenedCostInProjectCurrency": 0,
"EACBurdenedCostInProjectCurrency": null,
"RequisitionCommittedBurdenedCostInProjectCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectCurrency": null,
"SupplierInvoiceCommittedBurdenedCostInProjectCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectCurrency": null,
"TotalCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualBurdenedCostInProjectLedgerCurrency": null,
"ETCBurdenedCostInProjectLedgerCurrency": 0,
"EACBurdenedCostInProjectLedgerCurrency": null,
"RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualRevenue": null,
"ETCRevenue": 0,
"EACRevenue": null,
"StandardETCRevenueRate": null,
"EffectiveETCRevenueRate": null,
"ActualRevenueRate": 0,
"EACRevenueRate": 0,
"ActualRevenueInProjectCurrency": null,
"ETCRevenueInProjectCurrency": 0,
"EACRevenueInProjectCurrency": null,
"ActualRevenueInProjectLedgerCurrency": null,
"ETCRevenueInProjectLedgerCurrency": 0,
"EACRevenueInProjectLedgerCurrency": null,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764/child/PlanningAmountDetails/300100185480765",
"name": "PlanningAmountDetails",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764/child/PlanningAmountDetails/300100185480765",
"name": "PlanningAmountDetails",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764",
"name": "PlanningAmounts",
"kind": "item"
}
],
}
],
"count": 1,
"hasMore": false,
"limit": 24,
"offset": 0,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764/child/PlanningAmountDetails",
"name": "PlanningAmountDetails",
"kind": "collection"
}
],
},
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764",
"name": "PlanningAmounts",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764",
"name": "PlanningAmounts",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763",
"name": "PlanningResources",
"kind": "item"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764/child/PlanLinesDFF",
"name": "PlanLinesDFF",
"kind": "collection"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts/300100185480764/child/PlanningAmountDetails",
"name": "PlanningAmountDetails",
"kind": "collection"
}
],
}
],
"count": 1,
"hasMore": false,
"limit": 24,
"offset": 0,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts",
"name": "PlanningAmounts",
"kind": "collection"
}
],
},
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763",
"name": "PlanningResources",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763",
"name": "PlanningResources",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720",
"name": "projectForecasts",
"kind": "item"
},
  {
"rel": "lov",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/lov/PrimaryPlanningRBSLOVVO",
"name": "PrimaryPlanningRBSLOVVO",
"kind": "collection"
},
  {
"rel": "lov",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/lov/FinancialTaskVersionLOVVO",
"name": "FinancialTaskVersionLOVVO",
"kind": "collection"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480720/child/PlanningResources/300100185480763/child/PlanningAmounts",
"name": "PlanningAmounts",
"kind": "collection"
}
],
}
},
  {
"id": "part3",
"path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources",
"operation": "create",
"payload": {
"PlanningElementId": 300100185480766,
"TaskId": 100100048827367,
"TaskNumber": "2.0",
"TaskName": "Design Development Phase",
"RbsElementId": 100100048827359,
"ResourceName": "Labor",
"UnitOfMeasure": "Hours",
"ResourceClass": "Labor",
"PlanningStartDate": "2011-12-31T18:30:00+00:00",
"PlanningEndDate": "2015-12-30T18:30:00+00:00",
"PlanningAmounts": {
"items": [
  {
"PlanLineId": 300100185480767,
"TotalCommittedQuantity": null,
"ActualQuantity": null,
"ETCQuantity": 10,
"EACQuantity": 10,
"Currency": "USD",
"TotalCommittedRawCost": null,
"ActualRawCost": null,
"ETCRawCost": 1000,
"EACRawCost": 1000,
"StandardETCRawCostRate": null,
"EffectiveETCRawCostRate": 100,
"ActualRawCostRate": 0,
"EACRawCostRate": 100,
"TotalCommittedBurdenedCost": null,
"ActualBurdenedCost": null,
"ETCBurdenedCost": 2500,
"EACBurdenedCost": 2500,
"StandardETCBurdenedCostRate": null,
"EffectiveETCBurdenedCostRate": 250,
"ActualBurdenedCostRate": 0,
"EACBurdenedCostRate": 250,
"RequisitionCommittedQuantity": null,
"PurchaseOrderCommittedQuantity": null,
"SupplierInvoiceCommittedQuantity": null,
"TransferOrderCommittedQuantity": null,
"RequisitionCommittedRawCost": null,
"PurchaseOrderCommittedRawCost": null,
"SupplierInvoiceCommittedRawCost": null,
"TransferOrderCommittedRawCost": null,
"RequisitionCommittedBurdenedCost": null,
"PurchaseOrderCommittedBurdenedCost": null,
"SupplierInvoiceCommittedBurdenedCost": null,
"TransferOrderCommittedBurdenedCost": null,
"TotalCommittedRawCostInProjectCurrency": 0,
"ActualRawCostInProjectCurrency": null,
"ETCRawCostInProjectCurrency": null,
"EACRawCostInProjectCurrency": null,
"RequisitionCommittedRawCostInProjectCurrency": null,
"PurchaseOrderCommittedRawCostInProjectCurrency": null,
"SupplierInvoiceCommittedRawCostinProjectCurrency": null,
"TransferOrderCommittedRawCostInProjectCurrency": null,
"TotalCommittedRawCostInProjectLedgerCurrency": 0,
"ActualRawCostInProjectLedgerCurrency": null,
"ETCRawCostInProjectLedgerCurrency": null,
"EACRawCostInProjectLedgerCurrency": null,
"RequisitionCommittedRawCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedRawCostinProjectLedgerCurrency": null,
"TransferOrderCommittedRawCostInProjectLedgerCurrency": null,
"TotalCommittedBurdenedCostInProjectCurrency": null,
"ActualBurdenedCostInProjectCurrency": null,
"ETCBurdenedCostInProjectCurrency": 0,
"EACBurdenedCostInProjectCurrency": null,
"RequisitionCommittedBurdenedCostInProjectCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectCurrency": null,
"SupplierInvoiceCommittedBurdenedCostinProjectCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectCurrency": null,
"TotalCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualBurdenedCostInProjectLedgerCurrency": null,
"ETCBurdenedCostInProjectLedgerCurrency": 0,
"EACBurdenedCostInProjectLedgerCurrency": null,
"RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedBurdenedCostinProjectLedgerCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualRevenue": null,
"ETCRevenue": 0,
"EACRevenue": null,
"StandardETCRevenueRate": null,
"EffectiveETCRevenueRate": null,
"ActualRevenueRate": 0,
"EACRevenueRate": 0,
"ActualRevenueInProjectCurrency": null,
"ETCRevenueInProjectCurrency": 0,
"EACRevenueInProjectCurrency": null,
"ActualRevenueInProjectLedgerCurrency": null,
"ETCRevenueInProjectLedgerCurrency": 0,
"EACRevenueInProjectLedgerCurrency": null,
"PlanningAmountDetails": {
"items": [
  {
"PlanLineDetailId": 300100185480768,
"TotalCommittedQuantity": null,
"ActualQuantity": null,
"ETCQuantity": 10,
"EACQuantity": 10,
"PeriodName": "Dec-19",
"TotalCommittedRawCost": null,
"ActualRawCost": null,
"ETCRawCost": 1000,
"EACRawCost": 1000,
"StandardETCRawCostRate": null,
"EffectiveETCRawCostRate": 100,
"ActualRawCostRate": 0,
"EACRawCostRate": 100,
"TotalCommittedBurdenedCost": null,
"ActualBurdenedCost": null,
"ETCBurdenedCost": 2500,
"EACBurdenedCost": 2500,
"StandardETCBurdenedCostRate": null,
"EffectiveETCBurdenedCostRate": 250,
"ActualBurdenedCostRate": 0,
"EACBurdenedCostRate": 250,
"RequisitionCommittedQuantity": null,
"PurchaseOrderCommittedQuantity": null,
"SupplierInvoiceCommittedQuantity": null,
"TransferOrderCommittedQuantity": null,
"RequisitionCommittedRawCost": null,
"PurchaseOrderCommittedRawCost": null,
"SupplierInvoiceCommittedRawCost": null,
"TransferOrderCommittedRawCost": null,
"RequisitionCommittedBurdenedCost": null,
"PurchaseOrderCommittedBurdenedCost": null,
"SupplierInvoiceCommittedBurdenedCost": null,
"TransferOrderCommittedBurdenedCost": null,
"TotalCommittedRawCostInProjectCurrency": 0,
"ActualRawCostInProjectCurrency": null,
"ETCRawCostInProjectCurrency": null,
"EACRawCostInProjectCurrency": null,
"RequisitionCommittedRawCostInProjectCurrency": null,
"PurchaseOrderCommittedRawCostInProjectCurrency": null,
"SupplierInvoiceCommittedRawCostInProjectCurrency": null,
"TransferOrderCommittedRawCostInProjectCurrency": null,
"TotalCommittedRawCostInProjectLedgerCurrency": 0,
"ActualRawCostInProjectLedgerCurrency": null,
"ETCRawCostInProjectLedgerCurrency": null,
"EACRawCostInProjectLedgerCurrency": null,
"RequisitionCommittedRawCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedRawCostInProjectLedgerCurrency": null,
"TransferOrderCommittedRawCostInProjectLedgerCurrency": null,
"TotalCommittedBurdenedCostInProjectCurrency": null,
"ActualBurdenedCostInProjectCurrency": null,
"ETCBurdenedCostInProjectCurrency": 0,
"EACBurdenedCostInProjectCurrency": null,
"RequisitionCommittedBurdenedCostInProjectCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectCurrency": null,
"SupplierInvoiceCommittedBurdenedCostInProjectCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectCurrency": null,
"TotalCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualBurdenedCostInProjectLedgerCurrency": null,
"ETCBurdenedCostInProjectLedgerCurrency": 0,
"EACBurdenedCostInProjectLedgerCurrency": null,
"RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null,
"PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency": null,
"TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null,
"ActualRevenue": null,
"ETCRevenue": 0,
"EACRevenue": null,
"StandardETCRevenueRate": null,
"EffectiveETCRevenueRate": null,
"ActualRevenueRate": 0,
"EACRevenueRate": 0,
"ActualRevenueInProjectCurrency": null,
"ETCRevenueInProjectCurrency": 0,
"EACRevenueInProjectCurrency": null,
"ActualRevenueInProjectLedgerCurrency": null,
"ETCRevenueInProjectLedgerCurrency": 0,
"EACRevenueInProjectLedgerCurrency": null,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767/child/PlanningAmountDetails/300100185480768",
"name": "PlanningAmountDetails",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767/child/PlanningAmountDetails/300100185480768",
"name": "PlanningAmountDetails",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767",
"name": "PlanningAmounts",
"kind": "item"
}
],
}
],
"count": 1,
"hasMore": false,
"limit": 24,
"offset": 0,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767/child/PlanningAmountDetails",
"name": "PlanningAmountDetails",
"kind": "collection"
}
],
},
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767",
"name": "PlanningAmounts",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767",
"name": "PlanningAmounts",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766",
"name": "PlanningResources",
"kind": "item"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767/child/PlanLinesDFF",
"name": "PlanLinesDFF",
"kind": "collection"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts/300100185480767/child/PlanningAmountDetails",
"name": "PlanningAmountDetails",
"kind": "collection"
}
],
}
],
"count": 1,
"hasMore": false,
"limit": 24,
"offset": 0,
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts",
"name": "PlanningAmounts",
"kind": "collection"
}
],
},
"links": [
  {
"rel": "self",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766",
"name": "PlanningResources",
"kind": "item",
"properties": {
"changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178"
}
},
  {
"rel": "canonical",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766",
"name": "PlanningResources",
"kind": "item"
},
  {
"rel": "parent",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724",
"name": "projectForecasts",
"kind": "item"
},
  {
"rel": "lov",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/lov/PrimaryPlanningRBSLOVVO",
"name": "PrimaryPlanningRBSLOVVO",
"kind": "collection"
},
  {
"rel": "lov",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/lov/FinancialTaskVersionLOVVO",
"name": "FinancialTaskVersionLOVVO",
"kind": "collection"
},
  {
"rel": "child",
"href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185480724/child/PlanningResources/300100185480766/child/PlanningAmounts",
"name": "PlanningAmounts",
"kind": "collection"
}
],
}
}
],
}
Back to Top