Get insights for a program

get

/fscmRestApi/resources/11.13.18.05/projectProgramInsights/{projectProgramInsightsUniqID}

Request

Path Parameters
  • This is the hash key of the attributes which make up the composite key--- ObjectId, ObjectType, ObjectParentId and TreeStructureId ---for the Project Program Insights resource and used to uniquely identify an instance of Project Program Insights. The client should not generate the hash key value. Instead, the client should query on the Project Program Insights collection resource with a filter on the primary key values in order to navigate to a specific instance of Project Program Insights.

    For example: projectProgramInsights?q=ObjectId=<value1>;ObjectType=<value2>;ObjectParentId=<value3>;TreeStructureId=<value4>
Query Parameters
  • This parameter specifies dependencies which are fields that are set before and rolled back after generating the response. Generally they are used to preview the effects of an attribute change. The fields specified in this parameter are always set in the resource instance in question. When a child resource collection is requested and the parameter is set, the fields will be set in the parent resource instance before generating the resource collection payload. The value of this query parameter is a set of dependency fields. Example: dependency=ProductId=2

    Format: <attr1>=<val1>,<attr2>=<value2>
  • When this parameter is provided, the specified children are included in the resource payload (instead of just a link). The value of this query parameter is "all" or "". More than one child can be specified using comma as a separator. Example: ?expand=Employees,Localizations. Nested children can also be provided following the format "Child.NestedChild" (Example: ?expand=Employees.Managers). If a nested child is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?expand=Employees.Managers" is the same as "?expand=Employees,Employees.Managers" (which will expand Employees and Managers).
  • This parameter filters the resource fields. Only the specified fields are returned, which means that if no fields are specified, no fields are returned (useful to get only the links). If an indirect child resource is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?fields=Employees.Managers:Empname" is the same as "?fields=;Employees:;Employees.Managers:Empname" (which will only return the "Empname" field for Managers). the value of this query parameter is a list of resource fields. The attribute can be a direct (Example: Employees) or indirect (Example: Employees.Managers) child. It cannot be combined with expand query parameter. If both are provided, only fields will be considered.

    Format: ?fields=Attribute1,Attribute2

    Format for fields in child resource: ?fields=Accessor1:Attribute1,Attribute2
  • This parameter can be used to show only certain links while accessing a singular resource or a resource collection. The parameter value format is a comma-separated list of : <link_relation>

    Example:
    self,canonical
  • The resource item payload will be filtered in order to contain only data (no links section, for example).
Header Parameters
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.

There's no request body for this operation.

Back to Top

Response

Supported Media Types

Default Response

The following table describes the default response for this task.
Headers
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Body ()
Root Schema : projectProgramInsights-item-response
Type: object
Show Source
  • Read Only: true
    The total at completion for the labor cost from the current baseline budget.
  • Read Only: true
    The total-at-completion value for the current baseline budget revenue minus the current baseline budget cost.
  • Read Only: true
    The percentage at completion for the current baseline budget cost minus the original baseline budget cost, divided by the current baseline budget cost.
  • Read Only: true
    The total at completion for the days from the start date.
  • Read Only: true
    The total at completion for the original baseline budget cost minus the actual cost.
  • Read Only: true
    The total at completion for the original baseline budget cost minus the estimate-at-completion for the current approved forecast cost.
  • Read Only: true
    The total at completion for the original baseline budget margin minus the estimate-at-completion for the current approved forecast margin.
  • Read Only: true
    The total at completion for the original baseline budget revenue minus the estimate-at-completion for the current approved forecast revenue.
  • Read Only: true
    The total at completion for the burdened cost from the original baseline budget.
  • Read Only: true
    The total at completion for the labor effort from the original baseline budget.
  • Read Only: true
    The actual effort worked for a work plan.
  • Read Only: true
    Amount to bill.
  • Read Only: true
    The end date for the program calendar period. The period with this end date is the as-of-period for the measure time dimension.
  • Read Only: true
    The name of the program calendar period. The period with this name is the as-of-period for the measure time dimension.
  • Read Only: true
    The start date for the program calendar period. The period with this start date is the as-of-period for the measure time dimension.
  • Title: Assessment Code
    Read Only: true
    Maximum Length: 30
    The code that represents the program owner's ongoing assessment for the likelihood that the program will meet the program objectives. Examples for assessments are On track and At risk. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_ASSESSMENT. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    Maximum Length: 80
    The program owner's ongoing assessment for the likelihood that the program will meet the program objectives. Examples for assessments are On track and At risk. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_ASSESSMENT. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    The earned value divided by the actual cost.
  • Read Only: true
    Maximum Length: 64
    The user who created the record.
  • Read Only: true
    The date when the record was created.
  • Read Only: true
    The currency code for the monetary performance measures. A list of accepted values is available from the Program User Preferences API.
  • Title: Description
    Read Only: true
    Maximum Length: 2000
    The description of the program or project.
  • Read Only: true
    The total at completion for the burdened cost from the current baseline budget.
  • Read Only: true
    The total at completion for the labor effort from the current baseline budget.
  • Read Only: true
    The estimate-at-completion value for the revenue from the current baseline budget.
  • Read Only: true
    The estimate-at-completion for the current baseline budget margin minus the original baseline budget margin.
  • Read Only: true
    The estimate-at-completion for the current baseline budget revenue minus the original baseline budget revenue.
  • Read Only: true
    The estimate-at-completion for the current approved forecast burdened cost minus the previously approved forecast burdened cost.
  • Read Only: true
    The estimate-at-completion for the current approved forecast labor effort minus the previously approved forecast labor effort.
  • Read Only: true
    The estimate-at-completion for the current approved forecast margin minus the previously approved forecast margin.
  • Read Only: true
    The estimate-at-completion for the current approved forecast revenue minus the previously approved forecast revenue.
  • Read Only: true
    The estimate-at-completion for the labor cost from the current approved forecast.
  • Read Only: true
    The estimate-at-completion for the labor effort from the current approved forecast.
  • Read Only: true
    The estimated percentage at completion for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    The total-at-completion value for the current approved forecast revenue minus the current approved forecast cost.
  • Read Only: true
    The estimate-at-completion value of the revenue from the current approved forecast.
  • Read Only: true
    The planned value multiplied by the project completion percentage.
  • Read Only: true
    The earned value minus the actual cost.
  • Read Only: true
    The earned value minus the planned value.
  • Read Only: true
    The estimate-to-complete for the current approved forecast burdened cost minus the actual burdened cost.
  • Read Only: true
    The estimate-to-complete for the current approved forecast labor effort minus the actual labor effort.
  • Title: Finish Date
    Read Only: true
    The date when the program or project is completed.
  • Read Only: true
    The base 64 encoded image.
  • Read Only: true
    The unique identifier of the image for a program.
  • Read Only: true
    Maximum Length: 240
    The name of the image.
  • Read Only: true
    Maximum Length: 1
    Indicates whether the performance measure values are returned. If false, then only the program definition values are returned such as the project and program name, program strategy, and program region. The default value is false. If true, and when used as one of the variables for a finder, the performance measure values are returned.
  • Read Only: true
    The inception-to-date actual burdened cost plus the committed cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost plus the committed cost.
  • Read Only: true
    The inception-to-date actual burdened cost that's eligible to capitalize against an asset.
  • Read Only: true
    The inception-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost that's eligible for capitalization against an asset.
  • Read Only: true
    The inception-to-date actual cost including raw and burden cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual cost, including raw and burden cost.
  • Read Only: true
    The inception-to-date value of the actual raw labor cost and actual burden labor cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to create the trend of the inception-to-date value of actual raw labor cost and actual burden labor cost.
  • Read Only: true
    The inception-to-date actual billable labor effort plus the actual nonbillable labor effort.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual billable labor effort plus the actual nonbillable labor effort.
  • Read Only: true
    The inception-to-date actual revenue minus the actual burdened cost.
  • Read Only: true
    The inception-to-date percentage for the actual margin divided by the actual revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual margin divided by the actual revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual revenue minus the actual burdened cost.
  • Read Only: true
    The inception-to-date actual burdened cost that isn't eligible for billing.
  • Read Only: true
    The inception-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost that isn't eligible for billing.
  • Read Only: true
    The inception-to-date actual labor effort that isn't eligible for billing.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual labor effort that isn't eligible for billing.
  • Read Only: true
    The inception-to-date percentage for the actual cost to date divided by the current baseline budget burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual cost-to-date divided by the current baseline budget burdened cost.
  • Read Only: true
    The inception-to-date percentage for the actual labor effort divided by the current baseline budget labor effort.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual labor effort divided by the current baseline budget labor effort.
  • Read Only: true
    The inception-to-date burdened cost from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date burdened cost from the current baseline budget.
  • Read Only: true
    The inception-to-date labor cost from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date labor cost from the current baseline budget.
  • Read Only: true
    The inception-to-date labor effort from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date labor effort from the current baseline budget.
  • Read Only: true
    The inception-to-date current baseline budget revenue minus the current baseline budget burdened cost.
  • Read Only: true
    The inception-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to create the trend of the inception-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the current baseline budget burdened cost.
  • Read Only: true
    The inception-to-date revenue from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date revenue from the current baseline budget.
  • Read Only: true
    The inception-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.
  • Read Only: true
    The inception-to-date current baseline budget cost minus the actual burdened cost.
  • Read Only: true
    The inception-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget cost minus the actual burdened cost.
  • Read Only: true
    The inception-to-date days from the start date.
  • Read Only: true
    The inception-to-date burdened cost from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date burdened cost from the current approved forecast.
  • Read Only: true
    The inception-to-date current baseline budget cost minus the current approved forecast cost.
  • Read Only: true
    The inception-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget cost minus the current approved forecast cost.
  • Read Only: true
    The inception-to-date labor cost from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date labor cost from the current approved forecast.
  • Read Only: true
    The inception-to-date labor effort from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date labor effort from the current approved forecast.
  • Read Only: true
    The inception-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    The inception-to-date current approved forecast revenue minus the current approved forecast burdened cost.
  • Read Only: true
    The inception-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current approved forecast revenue minus the current approved forecast burdened cost.
  • Read Only: true
    The inception-to-date current baseline budget margin minus the current approved forecast margin.
  • Read Only: true
    The inception-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin minus the current approved forecast margin.
  • Read Only: true
    The inception-to-date revenue from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date revenue from the current approved forecast.
  • Read Only: true
    The inception-to-date current baseline budget revenue minus the current approved forecast revenue.
  • Read Only: true
    The inception-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the current approved forecast revenue.
  • Read Only: true
    The inception-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    The inception-to-date current baseline budget margin percentage minus the actual margin percentage.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin percentage minus the actual margin percentage.
  • Read Only: true
    The inception-to-date current baseline budget margin minus the actual margin.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin minus the actual margin.
  • Read Only: true
    The inception-to-date actual amount recognized as revenue on a contract.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date actual amount recognized as revenue on a contract.
  • Read Only: true
    The inception-to-date current baseline budget revenue minus the actual revenue.
  • Read Only: true
    The inception-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the actual revenue.
  • Read Only: true
    The date when the performance measures values were last refreshed.
  • Read Only: true
    The date when the record was last updated.
  • Read Only: true
    Maximum Length: 64
    The user who last updated the record.
  • Title: Line of Business Code
    Read Only: true
    Maximum Length: 30
    The code that represents the line of business name for the set of products and services that are managed by the program. Examples for line of business names are Product development and All lines of business. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_BUSINESS. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    Maximum Length: 80
    The line of business name for the set of products and services that are managed by the program. Examples for line of business names are Product development and All lines of business. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_BUSINESS. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Links
  • Title: Object ID
    Read Only: true
    The unique identifier of the program or project.
  • Read Only: true
    Maximum Length: 400
    The objective of the program.
  • Title: Name
    Read Only: true
    Maximum Length: 240
    The name of the program or project.
  • Read Only: true
    Maximum Length: 1
    Indicates whether notes are associated with the program or project. If true, then notes are associated. If false, then notes aren't associated.
  • Title: Number
    Read Only: true
    Maximum Length: 25
    The unique number of the program or project.
  • Title: Object Parent ID
    Read Only: true
    The unique identifier of the parent object in the program hierarchy structure. The parent of a project is the program. The parent of a program is another program. A program without a parent is the root node in the hierarchy structure.
  • Title: Object Type
    Read Only: true
    Maximum Length: 7
    Indicates whether the record is for a program or a project. Valid values are PROGRAM and PROJECT.
  • Read Only: true
    Maximum Length: 240
    The unique identifier of the display preference.
  • Read Only: true
    The unique identifier of the person who's assigned as the program owner or the primary project manager.
  • Read Only: true
    Maximum Length: 240
    The name of the person who's assigned as the program owner or the primary project manager.
  • Title: Owning Organization ID
    Read Only: true
    The unique identifier of the owning organization.
  • Read Only: true
    Maximum Length: 240
    The name of the owning organization. Review and update organizations classified as owning organizations using the Setup and Maintenance work area and the Manage Project Organization Classifications task.
  • Title: Parent Program Number
    Read Only: true
    Maximum Length: 25
    The unique number of the parent program. A program without a parent is the root node in the hierarchy structure.
  • Read Only: true
    The avatar image for a person.
  • Read Only: true
    The unique identifier of the avatar image for a person.
  • Read Only: true
    The planned cost for the financial project plan or project budget.
  • Read Only: true
    Maximum Length: 15
    Display name of the period that precedes the current one, used to compare a performance measure value against its current and previous values.
  • Read Only: true
    Start date of the period that precedes the current one, used to compare a performance measure value against the current and previous value.
  • Title: Priority Code
    Read Only: true
    Maximum Length: 30
    The code that represents the priority for the program. Examples for priority are High, Medium, and Low. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_PRIORITY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    Maximum Length: 80
    The priority for the program. Examples for priority are High, Medium, and Low. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_PRIORITY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    Maximum Length: 15
    Display name of the period prior to the previous period, which is used to compare a performance measure value against the corresponding current and previous values.
  • Read Only: true
    Start date of the period prior to the previous period, which is used to compare a performance measure value against the corresponding current and previous values.
  • Title: Budget
    Read Only: true
    The budgeted amount allotted to the program.
  • Read Only: true
    Maximum Length: 15
    The currency of the budgeted amount allotted to the program.
  • ProgramDFF
  • Read Only: true
    Indicates the level of the program in the hierarchy structure. The level zero is the root node.
  • Read Only: true
    The physical percent complete for the project. If it doesn't exist, then it's calculated using the program enterprise setting for the percent complete method.
  • Title: Project Association ID
    Read Only: true
    The unique identifier of the project assignment to a program.
  • Read Only: true
    The period-to-date actual burdened cost plus the committed cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual burdened cost plus the committed cost.
  • Read Only: true
    The period-to-date actual burdened cost that's eligible to capitalize against an asset.
  • Read Only: true
    The period-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual burdened cost that's eligible to be capitalized against an asset.
  • Read Only: true
    The period-to-date actual cost including raw and burden cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual cost, including raw and burden cost.
  • Read Only: true
    The period-to-date value of the actual raw labor cost and actual burden labor cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to create the trend of the period-to-date value of the actual raw labor cost and actual burden labor cost.
  • Read Only: true
    The period-to-date actual billable labor effort plus the actual nonbillable labor effort.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual billable labor effort plus the actual nonbillable labor effort.
  • Read Only: true
    The period-to-date actual revenue minus the actual burdened cost.
  • Read Only: true
    The period-to-date percentage for the actual margin divided by the actual revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the actual margin divided by the actual revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual revenue minus the actual burdened cost.
  • Read Only: true
    The period-to-date actual burdened cost that isn't eligible for billing.
  • Read Only: true
    The period-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the actual nonbillable cost divided by the actual burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual burdened cost that isn't eligible for billing.
  • Read Only: true
    The period-to-date actual labor effort that isn't eligible for billing.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual labor effort that isn't eligible for billing.
  • Read Only: true
    The period-to-date burdened cost from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date burdened cost from the current baseline budget.
  • Read Only: true
    The period-to-date labor cost from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date labor cost from the current baseline budget.
  • Read Only: true
    The period-to-date labor effort from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date labor effort from the current baseline budget.
  • Read Only: true
    The period-to-date current baseline budget revenue minus the current baseline budget burdened cost.
  • Read Only: true
    The period-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to create the trend of the period-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the current baseline budget burdened cost.
  • Read Only: true
    The period-to-date revenue from the current baseline budget.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date revenue from the current baseline budget.
  • Read Only: true
    The period-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.
  • Read Only: true
    The period-to-date current baseline budget cost minus the actual burdened cost .
  • Read Only: true
    The period-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget cost minus the actual burdened cost.
  • Read Only: true
    The period-to-date burdened cost from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date burdened cost from the current approved forecast.
  • Read Only: true
    The period-to-date current baseline budget cost minus the current approved forecast cost.
  • Read Only: true
    The period-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget cost minus the current approved forecast cost.
  • Read Only: true
    The period-to-date labor cost from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date labor cost from the current approved forecast.
  • Read Only: true
    The period-to-date labor effort from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date labor effort from the current approved forecast.
  • Read Only: true
    The period-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    The period-to-date current approved forecast revenue minus the current approved forecast burdened cost.
  • Read Only: true
    The period-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current approved forecast revenue minus the current approved forecast burdened cost.
  • Read Only: true
    The period-to-date current baseline budget margin minus the current approved forecast margin.
  • Read Only: true
    The period-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin minus the current approved forecast margin.
  • Read Only: true
    The period-to-date revenue from the current approved forecast.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date revenue from the current approved forecast.
  • Read Only: true
    The period-to-date current baseline budget revenue minus the current approved forecast revenue.
  • Read Only: true
    The period-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the current approved forecast revenue.
  • Read Only: true
    The period-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    The period-to-date current baseline budget margin percentage minus the actual margin percentage.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin percentage minus the actual margin percentage.
  • Read Only: true
    The period-to-date current baseline budget margin minus the actual margin.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin minus the actual margin.
  • Read Only: true
    The period-to-date actual amount recognized as revenue on a contract.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date actual amount recognized as revenue on a contract.
  • Read Only: true
    The period-to-date current baseline budget revenue minus the actual revenue.
  • Read Only: true
    The period-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
  • Read Only: true
    Maximum Length: 255
    Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the actual revenue.
  • Title: Public access
    Read Only: true
    Maximum Length: 1
    Indicates whether the program hierarchy can be viewed by all. If true, then programs in the hierarchy can be viewed by all. If false, then only the persons assigned as stakeholders directly or inherited from a parent or grandparent program can view their programs. The value is defined for the root node of the hierarchy. The default value is false.
  • Title: Region Code
    Read Only: true
    Maximum Length: 30
    The code that represents the geographic or divisional region that's covered by the program. Examples for region names are North America and All regions. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_REGION. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    Maximum Length: 80
    The geographic or divisional region that's covered by the program. Examples for region names are North America and All regions. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_REGION. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    The earned value divided by the planned value.
  • Title: Start Date
    Read Only: true
    The date on which the program or project starts.
  • Read Only: true
    Maximum Length: 80
    The system status for the object. Values are Draft, Submitted, Active, Pending close, and Close. The list of values is defined in the lookup type PJF_PROJECT_SYSTEM_STATUS. Review status values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Title: Strategy Code
    Read Only: true
    Maximum Length: 30
    The code that represents the strategic plan of actions and policies that are targeted by the program. An example for strategy is Innovation. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_STRATEGY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    Maximum Length: 80
    The strategic plan of actions and policies that are targeted by the program. An example strategy is Innovation. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_STRATEGY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
  • Read Only: true
    Maximum Length: 30
    The code that represents the system status. Values are DRAFT, SUBMITTED, ACTIVE, PENDING_CLOSE, and CLOSED. Review status values using the Setup and Maintenance work area and the Manage Project Statuses task.
  • Title: Tree Structure ID
    Read Only: true
    The unique identifier of the program hierarchy structure.
  • Read Only: true
    Unpaid invoice amount.
  • Read Only: true
    Maximum Length: 30
    The code that represents the access type for the assignee. The assignee with owner access can edit and delete the program. An assignee with contributor access can edit the program. An assignee with viewer access can view the program and receive stakeholder communications. The person who creates the program is the default owner. Only one direct assignment can have owner access at a given time. Valid values are OWNER, EDIT, and VIEW. The default value is VIEW.
  • Read Only: true
    Maximum Length: 80
    The access granted to the user for the program.
  • Read Only: true
    The percentage complete for the actual work plan effort divided by the scheduled work plan effort.
  • Read Only: true
    The planned effort for a work plan.
  • Read Only: true
    The year-to-date actual burdened cost plus the committed cost.
  • Read Only: true
    The year-to-date actual burdened cost that's eligible to capitalize against an asset.
  • Read Only: true
    The year-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
  • Read Only: true
    The year-to-date actual cost including raw and burden cost.
  • Read Only: true
    The year-to-date value of the actual raw labor cost and actual burden labor cost.
  • Read Only: true
    The year-to-date actual billable labor effort plus the actual nonbillable labor effort.
  • Read Only: true
    The year-to-date actual revenue minus the actual burdened cost.
  • Read Only: true
    The year-to-date percentage for the actual margin divided by the actual revenue.
  • Read Only: true
    The year-to-date actual burdened cost that isn't eligible for billing.
  • Read Only: true
    The year-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
  • Read Only: true
    The year-to-date actual labor effort that isn't eligible for billing.
  • Read Only: true
    The year-to-date burdened cost from the current baseline budget.
  • Read Only: true
    The year-to-date labor cost from the current baseline budget.
  • Read Only: true
    The year-to-date labor effort from the current baseline budget.
  • Read Only: true
    The year-to-date current baseline budget revenue minus the current baseline budget burdened cost.
  • Read Only: true
    The year-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
  • Read Only: true
    The year-to-date revenue from the current baseline budget.
  • Read Only: true
    The year-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.
  • Read Only: true
    The year-to-date current baseline budget cost minus the actual burdened cost.
  • Read Only: true
    The year-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
  • Read Only: true
    The year-to-date burdened cost from the current approved forecast.
  • Read Only: true
    The year-to-date current baseline budget cost minus the current approved forecast cost.
  • Read Only: true
    The year-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
  • Read Only: true
    The year-to-date labor cost from the current approved forecast.
  • Read Only: true
    The year-to-date labor effort from the current approved forecast.
  • Read Only: true
    The year-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    The year-to-date current approved forecast revenue minus the current approved forecast burdened cost.
  • Read Only: true
    The year-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
  • Read Only: true
    The year-to-date current baseline budget margin minus the current approved forecast margin.
  • Read Only: true
    The year-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
  • Read Only: true
    The year-to-date revenue from the current approved forecast.
  • Read Only: true
    The year-to-date current baseline budget revenue minus the current approved forecast revenue.
  • Read Only: true
    The year-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
  • Read Only: true
    The year-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
  • Read Only: true
    The year-to-date current baseline budget margin percentage minus the actual margin percentage.
  • Read Only: true
    The year-to-date current baseline budget margin minus the actual margin.
  • Read Only: true
    The year-to-date actual amount recognized as revenue on a contract.
  • Read Only: true
    The year-to-date current baseline budget revenue minus the actual revenue.
  • Read Only: true
    The year-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
Nested Schema : ProgramDFF
Type: array
Show Source
Nested Schema : projectProgramInsights-ProgramDFF-item-response
Type: object
Show Source
Back to Top