Get performance data for a resource

get

/fscmRestApi/resources/11.13.18.05/resourcePerformance/{resourcePerformanceUniqID}

Request

Path Parameters
  • This is the hash key of the attributes which make up the composite key--- ResourceId, ResourceBreakdownStructureId, ResourceBreakdownStructureVersionId, ProjectId, CalendarTypeCode and CurrencyTypeCode ---for the Resource Performance resource and used to uniquely identify an instance of Resource Performance. The client should not generate the hash key value. Instead, the client should query on the Resource Performance collection resource with a filter on the primary key values in order to navigate to a specific instance of Resource Performance.

    For example: resourcePerformance?q=ResourceId=<value1>;ResourceBreakdownStructureId=<value2>;ResourceBreakdownStructureVersionId=<value3>;ProjectId=<value4>;CalendarTypeCode=<value5>;CurrencyTypeCode=<value6>
Query Parameters
  • This parameter specifies dependencies which are fields that are set before and rolled back after generating the response. Generally they are used to preview the effects of an attribute change. The fields specified in this parameter are always set in the resource instance in question. When a child resource collection is requested and the parameter is set, the fields will be set in the parent resource instance before generating the resource collection payload. The value of this query parameter is a set of dependency fields. Example: dependency=ProductId=2

    Format: <attr1>=<val1>,<attr2>=<value2>
  • When this parameter is provided, the specified children are included in the resource payload (instead of just a link). The value of this query parameter is "all" or "". More than one child can be specified using comma as a separator. Example: ?expand=Employees,Localizations. Nested children can also be provided following the format "Child.NestedChild" (Example: ?expand=Employees.Managers). If a nested child is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?expand=Employees.Managers" is the same as "?expand=Employees,Employees.Managers" (which will expand Employees and Managers).
  • This parameter filters the resource fields. Only the specified fields are returned, which means that if no fields are specified, no fields are returned (useful to get only the links). If an indirect child resource is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?fields=Employees.Managers:Empname" is the same as "?fields=;Employees:;Employees.Managers:Empname" (which will only return the "Empname" field for Managers). the value of this query parameter is a list of resource fields. The attribute can be a direct (Example: Employees) or indirect (Example: Employees.Managers) child. It cannot be combined with expand query parameter. If both are provided, only fields will be considered.

    Format: ?fields=Attribute1,Attribute2

    Format for fields in child resource: ?fields=Accessor1:Attribute1,Attribute2
  • This parameter can be used to show only certain links while accessing a singular resource or a resource collection. The parameter value format is a comma-separated list of : <link_relation>

    Example:
    self,canonical
  • The resource item payload will be filtered in order to contain only data (no links section, for example).
Header Parameters
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.

There's no request body for this operation.

Back to Top

Response

Supported Media Types

Default Response

The following table describes the default response for this task.
Headers
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Body ()
Root Schema : resourcePerformance-item-response
Type: object
Show Source
  • Title: Business Unit
    Read Only: true
    Maximum Length: 240
    Name of the business unit for which you can view summarized data.
  • Title: Business Unit ID
    Read Only: true
    Identifier of the business unit for which you can view summarized data.
  • Title: Calendar ID
    Read Only: true
    Identifier of the calendar in which you can view summarized data.
  • Title: Calendar Type
    Read Only: true
    Maximum Length: 32
    Type of the calendar in which you can view summarized data. A list of accepted values - Accounting and Project accounting - is defined in the lookup type PJF_CALENDAR_TYPE.
  • Title: Calendar Type Code
    Read Only: true
    Maximum Length: 1
    Code of the calendar type in which you can view summarized data. A list of accepted values - G and P - is defined in the lookup type PJF_CALENDAR_TYPE.
  • Title: Currency
    Read Only: true
    Maximum Length: 15
    The three-letter ISO currency code.
  • Title: Currency Type
    Read Only: true
    Maximum Length: 11
    Type of the currency in which you can view summarized data. A list of accepted values - Project currency and Project ledger currency - is defined in the lookup type PJF_CURRENCY_TYPE.
  • Title: Currency Type Code
    Read Only: true
    Maximum Length: 11
    Code of the currency type in which you can view summarized data. A list of accepted values - P and F - is defined in the lookup type PJF_CURRENCY_TYPE.
  • Title: EAC Budget Burden Cost
    Read Only: true
    Estimated planned legitimate cost of doing business that supports raw cost for the project at the completion of the project.
  • Title: EAC Budget Cost
    Read Only: true
    Estimated planned cost for the project at the completion of the project.
  • Title: EAC Budget Effort
    Read Only: true
    Estimated planned effort for the project at the completion of the project, expressed in hours.
  • Title: EAC Budget Equipment Effort
    Read Only: true
    Estimated planned equipment effort for the project on completion of the project, expressed in hours.
  • Title: EAC Budget Labor Effort
    Read Only: true
    Estimated planned labor effort for the project on completion of the project, expressed in hours.
  • Title: EAC Budget Raw Cost
    Read Only: true
    Estimated planned cost for the project that is directly attributable to the work performed at the completion of the project.
  • Title: EAC Budget Revenue
    Read Only: true
    Estimated planned revenue for the project at the completion of the project.
  • Title: EAC Forecast Burden Cost
    Read Only: true
    Estimated forecast legitimate cost of doing business that supports raw cost for the project at the completion of the project.
  • Title: EAC Forecast Cost
    Read Only: true
    Estimated forecast cost for the project at the completion of the project.
  • Title: EAC Forecast Effort
    Read Only: true
    Estimated forecast effort for the project at the completion of the project, expressed in hours.
  • Title: EAC Forecast Equipment Effort
    Read Only: true
    Estimated forecast equipment effort for the project on completion of the project, expressed in hours.
  • Title: EAC Forecast Labor Effort
    Read Only: true
    Estimated forecast labor effort for the project on completion of the project, expressed in hours.
  • Title: EAC Forecast Raw Cost
    Read Only: true
    Estimated forecast cost for the project that is directly attributable to the work performed at the completion of the project.
  • Title: EAC Forecast Revenue
    Read Only: true
    Estimated forecast revenue for the project at the completion of the project.
  • Title: ITD Actual Burden Cost
    Read Only: true
    Actual legitimate cost of doing business that supports raw cost for the project from the start of the project to the current date.
  • Title: ITD Actual Cost
    Read Only: true
    Actual cost incurred for the project. This is the sum of actual raw cost and actual burden cost from the inception of the project to the current date.
  • Title: ITD Actual Effort
    Read Only: true
    Actual effort for the project from the inception of the project to the current date, expressed in hours.
  • Title: ITD Actual Equipment Effort
    Read Only: true
    Actual equipment effort for the project from the start of the project to the current date, expressed in hours.
  • Title: ITD Actual Labor Effort
    Read Only: true
    Actual labor effort for the project from the start of the project to the current date, expressed in hours.
  • Title: ITD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the project that is directly attributable to the work performed from the start of the project to the current date.
  • Title: ITD Budget Burden Cost
    Read Only: true
    Planned legitimate cost of doing business that supports raw cost for the project from the start of the project till the current date.
  • Title: ITD Budget Cost
    Read Only: true
    Planned cost for the project from the start of the project till the current date.
  • Title: ITD Budget Effort
    Read Only: true
    Planned effort for the project from the start of the project till the current date, expressed in hours.
  • Title: ITD Budget Equipment Effort
    Read Only: true
    Planned equipment effort for the project from the start of the project to the current date, expressed in hours.
  • Title: ITD Budget Labor Effort
    Read Only: true
    Planned labor effort for the project from the start of the project to the current date, expressed in hours.
  • Title: ITD Budget Raw Cost
    Read Only: true
    Planned cost for the project that is directly attributable to the work performed from the start of the project till the current date.
  • Title: ITD Budget Revenue
    Read Only: true
    Planned revenue for the project from the start of the project till the current date.
  • Title: ITD Committed Burden Cost
    Read Only: true
    Legitimate committed cost of doing business that supports raw cost for the project from the start of the project to the current date.
  • Title: ITD Committed Cost
    Read Only: true
    Sum of various project commitment costs from the start of the project to the current date.
  • Title: ITD Committed Raw Cost
    Read Only: true
    Cost committed for the project that is directly attributable to the work performed from the start of the project to the current date.
  • Title: ITD Other Committed Burden Cost
    Read Only: true
    Other legitimate committed cost of doing business that supports raw cost for the project from the start of the project till the current date.
  • Title: ITD Other Committed Cost
    Read Only: true
    Cost committed for the project through other commitments from the start of the project till the current date.
  • Title: ITD Other Committed Raw Cost
    Read Only: true
    Other cost committed for the project that is directly attributable to the work performed from the start of the project to the current date.
  • Title: ITD Forecast Burden Cost
    Read Only: true
    Forecasted legitimate cost of doing business that supports raw cost for the project from the start of the project till the current date.
  • Title: ITD Forecast Cost
    Read Only: true
    Forecasted cost for the project from the start of the project till the current date.
  • Title: ITD Forecast Effort
    Read Only: true
    Forecasted effort for the project from the start of the project to the current date, expressed in hours.
  • Title: ITD Forecast Equipment Effort
    Read Only: true
    Forecasted equipment effort for the project from the start of the project to the current date, expressed in hours.
  • Title: ITD Forecast Labor Effort
    Read Only: true
    Forecasted labor effort for the project from the start of the project to the current date, expressed in hours.
  • Title: ITD Forecast Raw Cost
    Read Only: true
    Forecasted cost for the project that is directly attributable to the work performed from the start of the project till the current date.
  • Title: ITD Forecast Revenue
    Read Only: true
    Forecasted revenue for the project from the start of the project till the current date.
  • Title: ITD Invoice Amount
    Read Only: true
    Monetary value of an invoice created for the contract from the start of the project to the current date.
  • Title: ITD Purchase Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through purchase orders that supports raw cost for the project from the start of the project to the current date.
  • Title: ITD Purchase Order Committed Cost
    Read Only: true
    Cost committed for the project through purchase orders from the start of the project till the current date.
  • Title: ITD Purchase Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through purchase orders that is directly attributable to the work performed from the start of the project till the current date.
  • Title: ITD Requisition Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through requisitions that supports raw cost for the project from the start of the project till the current date.
  • Title: ITD Requisition Committed Cost
    Read Only: true
    Cost committed for the project through requisitions from the inception of the project to the current date.
  • Title: ITD Requisition Committed Raw Cost
    Read Only: true
    Cost committed for the project through requisitions that is directly attributable to the work performed from the start of the project till the current date.
  • Title: ITD Revenue
    Read Only: true
    Amount of revenue recognized and summarized for the project from the start of the project till the current date.
  • Title: ITD Supplier Invoice Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through supplier invoices that supports raw cost for the project from the inception of the project to the current date.
  • Title: ITD Supplier Invoice Committed Cost
    Read Only: true
    Cost committed for the project through supplier invoices from the start of the project to the current date.
  • Title: ITD Supplier Invoice Committed Raw Cost
    Read Only: true
    Cost committed for the project through supplier invoices that is directly attributable to the work performed from the inception of the project to the current date.
  • Title: ITD Transfer Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through transfer orders that supports raw cost for the project from the start of the project to the current date.
  • Title: ITD Transfer Order Committed Cost
    Read Only: true
    Cost committed for the project through transfer orders from the start of the project to the current date.
  • Title: ITD Transfer Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through transfer orders that is directly attributable to the work performed from the start of the project to the current date.
  • Title: Level
    Read Only: true
    Position of an element in a hierarchy. For example, a resource element in a resource breakdown structure hierarchy.
  • Links
  • Title: Lowest Level Resource
    Read Only: true
    Maximum Length: 1
    Indicates whether the resource is the lowest level element in the resource hierarchy. Valid values are True and False. If True, the resource is the lowest level resource in the resource breakdown structure and if False, the resource is not the lowest level resource in the resource breakdown structure.
  • Title: Organization
    Read Only: true
    Maximum Length: 240
    Name of the organization for which you can view summarized data.
  • Title: Organization ID
    Read Only: true
    Identifier of the organization for which you can view summarized data.
  • Title: Outline Number
    Read Only: true
    Maximum Length: 240
    The number that represents the level where a resource appears in a resource breakdown structure.
  • Title: Parent Resource
    Read Only: true
    Maximum Length: 240
    Name of the resource which is at the immediate higher level of a resource in the resource hierarchy under which resources are separately tracked and managed.
  • Title: Parent Resource ID
    Read Only: true
    Identifier of the resource which is at the immediate higher level of the resource in the resource hierarchy under which resources are separately tracked and managed.
  • Title: Period End Date
    Read Only: true
    The date on which the accounting or project accounting period ends.
  • Title: Period Name
    Read Only: true
    Maximum Length: 100
    Period of the calendar for which you can view summarized data. Default value is the current reporting period.
  • Title: Period Start Date
    Read Only: true
    The date on which the accounting or project accounting period starts.
  • Title: Primary Reporting
    Read Only: true
    Maximum Length: 1
    Indicates whether the resource breakdown structure is primarily used in reporting. Valid values are True and False. If True, the resource breakdown structure is classified for primary reporting and if False, the resource breakdown structure is not classified for primary reporting.
  • Title: Project ID
    Read Only: true
    Identifier of the project for which you can view summarized data.
  • Title: Project Manager
    Read Only: true
    Maximum Length: 2000
    Name of the person who leads the project team and who has authority and responsibility for meeting project objectives.
  • Title: Project Manager ID
    Read Only: true
    Identifier of the person who leads the project team and who has the authority and responsibility for meeting the project objectives.
  • Title: Project Name
    Read Only: true
    Maximum Length: 240
    Name of the project for which you can view summarized data.
  • Title: Project Number
    Read Only: true
    Maximum Length: 25
    Number of the project for which you can view summarized data.
  • Title: Project Status
    Read Only: true
    Maximum Length: 80
    An implementation-defined classification of the status of a project. Typical project statuses are Active and Closed.
  • Title: Project Type
    Read Only: true
    Maximum Length: 240
    Implementation entity that defines basic project options for the project for which you can view summarized data.
  • Title: Project Number
    Read Only: true
    Identifier of the implementation entity that defines basic project options for the project for which you can view summarized data.
  • Title: Project Unit
    Read Only: true
    Maximum Length: 240
    Name of the project unit for which you can view summarized data.
  • Title: Project Unit ID
    Read Only: true
    Identifier of the project unit for which you can view summarized data.
  • Title: PTD Actual Burden Cost
    Read Only: true
    Actual legitimate cost of doing business that supports raw cost for the project from the start of the period to the current date.
  • Title: PTD Actual Cost
    Read Only: true
    Actual cost incurred for the project from the start of the period to the current date.
  • Title: PTD Actual Effort
    Read Only: true
    Actual effort for the project from the start of the period to the current date, expressed in hours.
  • Title: PTD Actual Equipment Effort
    Read Only: true
    Actual equipment effort for the project from the start of the period to the current date, expressed in hours.
  • Title: PTD Actual Labor Effort
    Read Only: true
    Actual labor effort for the project from the start of the period to the current date, expressed in hours.
  • Title: PTD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the project that is directly attributable to the work performed from the start of the period to the current date.
  • Title: PTD Budget Burden Cost
    Read Only: true
    Planned legitimate cost of doing business that supports raw cost for the project from the start of the period till the current date.
  • Title: PTD Budget Cost
    Read Only: true
    Planned cost for the project from the start of the period till the current date.
  • Title: PTD Budget Effort
    Read Only: true
    Planned effort for the project from the start of the period till the current date, expressed in hours.
  • Title: PTD Budget Equipment Effort
    Read Only: true
    Planned equipment effort for the project from the start of the period to the current date, expressed in hours.
  • Title: PTD Budget Labor Effort
    Read Only: true
    Planned labor effort for the project from the start of the period to the current date, expressed in hours.
  • Title: PTD Budget Raw Cost
    Read Only: true
    Planned cost for the project that is directly attributable to the work performed from the start of the period till the current date.
  • Title: PTD Budget Revenue
    Read Only: true
    Planned revenue for the project from the start of the period till the current date.
  • Title: PTD Committed Burden Cost
    Read Only: true
    Legitimate committed cost of doing business that supports raw cost for the project from the start of the period to the current date.
  • Title: PTD Committed Cost
    Read Only: true
    Cost committed for the project that is directly attributable to the work performed from the start of the period to the current date.
  • Title: PTD Committed Raw Cost
    Read Only: true
    Cost committed for the project that is directly attributable to the work performed from the start of the period to the current date.
  • Title: PTD Other Committed Burden Cost
    Read Only: true
    Other legitimate committed cost of doing business that supports raw cost for the project from the start of the period till the current date.
  • Title: PTD Other Committed Cost
    Read Only: true
    Cost committed for the project through other commitments from the start of the period till the current date.
  • Title: PTD Other Committed Raw Cost
    Read Only: true
    Other cost committed for the project that is directly attributable to the work performed from the start of the period till the current date.
  • Title: PTD Forecast Burden Cost
    Read Only: true
    Forecasted legitimate cost of doing business that supports raw cost for the project from the start of the period till the current date.
  • Title: PTD Forecast Cost
    Read Only: true
    Forecasted cost for the project from the start of the period till the current date.
  • Title: PTD Forecast Effort
    Read Only: true
    Forecasted effort for the project from the start of the period to the current date expressed in hours.
  • Title: PTD Forecast Equipment Effort
    Read Only: true
    Forecasted equipment effort for the project from the start of the period to the current date, expressed in hours.
  • Title: PTD Forecast Labor Effort
    Read Only: true
    Forecasted labor effort for the project from the start of the period to the current date, expressed in hours.
  • Title: PTD Forecast Raw Cost
    Read Only: true
    Forecasted cost for the project that is directly attributable to the work performed from the start of the period till the current date.
  • Title: PTD Forecast Revenue
    Read Only: true
    Forecasted revenue for the project from the start of the period till the current date.
  • Title: PTD Invoice Amount
    Read Only: true
    Monetary value of an invoice created for the contract from the start of the period to the current date.
  • Title: PTD Purchase Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through purchase orders that supports raw cost for the project from the start of the period till the current date.
  • Title: PTD Purchase Order Committed Cost
    Read Only: true
    Cost committed for the project through purchase orders from the start of the period till the current date.
  • Title: PTD Purchase Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through purchase orders that is directly attributable to the work performed from the start of the period till the current date.
  • Title: PTD Requisition Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through requisitions that supports raw cost for the project from the start of the period till the current date.
  • Title: PTD Requisition Committed Cost
    Read Only: true
    Cost committed for the project through requisitions from the start of the period to the current date.
  • Title: PTD Requisition Committed Raw Cost
    Read Only: true
    Cost committed for the project through requisitions that is directly attributable to the work performed from the start of the period to the current date.
  • Title: PTD Revenue
    Read Only: true
    Amount of revenue recognized and summarized for the project from the start of the period to the current date.
  • Title: PTD Supplier Invoice Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through supplier invoices that supports raw cost for the project from the start of the period to the current date.
  • Title: PTD Supplier Invoice Committed Cost
    Read Only: true
    Cost committed for the project through supplier invoices from the start of the period to the current date.
  • Title: PTD Supplier Invoice Committed Raw Cost
    Read Only: true
    Cost committed for the project through supplier invoices that is directly attributable to the work performed from the start of the period to the current date.
  • Title: PTD Transfer Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through transfer orders that supports raw cost for the project from the start of the period to the current date.
  • Title: PTD Transfer Order Committed Cost
    Read Only: true
    Cost committed for the project through transfer orders from the start of the period to the current date.
  • Title: PTD Transfer Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through transfer orders that is directly attributable to the work performed from the start of the period to the current date.
  • Title: QTD Actual Burden Cost
    Read Only: true
    Actual legitimate cost of doing business that supports raw cost for the project from the start of the quarter to the current date.
  • Title: QTD Actual Cost
    Read Only: true
    Actual cost incurred for the project from the start of the quarter to the current date.
  • Title: QTD Actual Effort
    Read Only: true
    Actual effort for the project from the start of the quarter to the current date, expressed in hours.
  • Title: QTD Actual Equipment Effort
    Read Only: true
    Actual equipment effort for the project from the start of the quarter to the current date, expressed in hours.
  • Title: QTD Actual Labor Effort
    Read Only: true
    Actual labor effort for the project from the start of the quarter to the current date, expressed in hours.
  • Title: QTD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the project that is directly attributable to the work performed from the start of the quarter to the current date.
  • Title: QTD Budget Burden Cost
    Read Only: true
    Planned legitimate cost of doing business that supports raw cost for the project from the start of the quarter till the current date.
  • Title: QTD Budget Cost
    Read Only: true
    Planned cost for the project from the start of the quarter till the current date.
  • Title: QTD Budget Effort
    Read Only: true
    Planned effort for the project from the start of the quarter till the current date, expressed in hours.
  • Title: ITD Actual Effort
    Read Only: true
    Planned equipment effort for the project from the start of the quarter to the current date, expressed in hours.
  • Title: QTD Budget Labor Effort
    Read Only: true
    Planned labor effort for the project from the start of the quarter to the current date, expressed in hours.
  • Title: QTD Budget Raw Cost
    Read Only: true
    Planned cost for the project that is directly attributable to the work performed from the start of the quarter till the current date.
  • Title: QTD Budget Revenue
    Read Only: true
    Planned revenue for the project from the start of the quarter till the current date.
  • Title: QTD Committed Burden Cost
    Read Only: true
    Legitimate committed cost of doing business that supports raw cost for the project from the start of the quarter to the current date.
  • Title: QTD Committed Cost
    Read Only: true
    Sum of various project commitment costs from the start of the quarter to the current date.
  • Title: QTD Committed Raw Cost
    Read Only: true
    Cost committed for the project that is directly attributable to the work performed from the start of the quarter to the current date.
  • Title: QTD Other Committed Burden Cost
    Read Only: true
    Other legitimate committed cost of doing business that supports raw cost for the project from the start of the quarter till the current date.
  • Title: QTD Other Committed Cost
    Read Only: true
    Cost committed for the project through other commitments from the start of the quarter till the current date.
  • Title: QTD Other Committed Raw Cost
    Read Only: true
    Other cost committed for the project that is directly attributable to the work performed from the start of the quarter till the current date.
  • Title: QTD Forecast Burden Cost
    Read Only: true
    Forecasted legitimate cost of doing business that supports raw cost for the project from the start of the quarter to the current date.
  • Title: QTD Forecast Cost
    Read Only: true
    Forecasted cost for the project from the start of the quarter till the current date.
  • Title: QTD Forecast Effort
    Read Only: true
    Forecasted effort for the project from the start of the quarter the current date expressed in hours.
  • Title: QTD Forecast Equipment Effort
    Read Only: true
    Forecasted equipment effort for the project from the start of the quarter to the current date, expressed in hours.
  • Title: QTD Forecast Labor Effort
    Read Only: true
    Forecasted labor effort for the project from the start of the quarter to the current date, expressed in hours.
  • Title: QTD Forecast Raw Cost
    Read Only: true
    Forecasted cost for the project that is directly attributable to the work performed from the start of the quarter to the current date.
  • Title: QTD Forecast Revenue
    Read Only: true
    Forecasted revenue for the project from the start of the quarter till the current date.
  • Title: QTD Invoice Amount
    Read Only: true
    Monetary value of an invoice created for the contract from the start of the quarter to the current date.
  • Title: QTD Purchase Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through purchase orders that supports raw cost for the project from the start of the quarter till the current date.
  • Title: QTD Purchase Order Committed Cost
    Read Only: true
    Cost committed for the project through purchase orders from the start of the quarter till the current date.
  • Title: QTD Purchase Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through purchase orders that is directly attributable to the work performed from the start of the quarter till the current date.
  • Title: QTD Requisition Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through requisitions that supports raw cost for the project from the start of the quarter till the current date.
  • Title: QTD Requisition Committed Cost
    Read Only: true
    Cost committed for the project through requisitions from the start of the quarter to the current date.
  • Title: QTD Requisition Committed Raw Cost
    Read Only: true
    Cost committed for the project through requisitions that is directly attributable to the work performed from the start of the quarter to the current date.
  • Title: QTD Revenue
    Read Only: true
    Amount of revenue recognized and summarized for the project from the start of the quarter to the current date.
  • Title: QTD Supplier Invoice Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through supplier invoices that supports raw cost for the project from the start of the quarter to the current date.
  • Title: QTD Supplier Invoice Committed Cost
    Read Only: true
    Cost committed for the project through supplier invoices from the start of the quarter to the current date.
  • Title: QTD Supplier Invoice Committed Raw Cost
    Read Only: true
    Cost committed for the project through supplier invoices that is directly attributable to the work performed from the start of the quarter to the current date.
  • Title: QTD Transfer Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through transfer orders that supports raw cost for the project from the start of the quarter to the current date.
  • Title: QTD Transfer Order Committed Cost
    Read Only: true
    Cost committed for the project through transfer orders from the start of the quarter to the current date.
  • Title: QTD Transfer Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through transfer orders that is directly attributable to the work performed from the start of the quarter to the current date.
  • Title: Resource Breakdown Structure
    Read Only: true
    Maximum Length: 240
    Name of the structure that provides a method for viewing summarized data for a project by resource, resource type, and other resource groupings. The resource breakdown structure consists of one or more hierarchies of resource elements.
  • Title: Resource Breakdown Structure ID
    Read Only: true
    Identifier of the structure that provides a method for viewing summarized data for a project by resource, resource type, and other resource groupings. The resource breakdown structure consists of one or more hierarchies of resource elements.
  • Title: Resource Breakdown Structure Version
    Read Only: true
    Version of the resource breakdown structure that is attached to the project for which you can view summarized data.
  • Title: Resource Breakdown Structure Version ID
    Read Only: true
    Identifier of the version of the resource breakdown structure that is attached to the project for which you can view summarized data.
  • Title: Resource Class
    Read Only: true
    Maximum Length: 240
    A grouping of resource types. Resource classes are predefined and include Labor, Equipment, Material Items, and Financial Elements.
  • Title: Resource Class
    Read Only: true
    Maximum Length: 30
    The code representing a group of resource types. Resource classes are predefined groups of resource types and include people, equipment, material items, and financial elements.
  • Title: Resource Format
    Read Only: true
    Maximum Length: 240
    A valid combination of resource types.
  • Title: Resource ID
    Read Only: true
    Identifier of the resource for which you can view summarized data.
  • Title: Resource
    Read Only: true
    Maximum Length: 240
    Name of the resource for which you can view summarized data.
  • Title: Summarization Status
    For Resource Performance resource: Indicates whether data is summarized for a resource in the context of the project. For Periodic Resource Performance resource: N/A.
  • Title: YTD Actual Burden Cost
    Read Only: true
    Actual legitimate cost of doing business that supports raw cost for the project from the start of the year to the current date.
  • Title: YTD Actual Cost
    Read Only: true
    Actual cost incurred for the project from the start of the year to the current date.
  • Title: YTD Actual Effort
    Read Only: true
    Actual effort for the project from the start of the year to the current date, expressed in hours.
  • Title: YTD Actual Equipment Effort
    Read Only: true
    Actual equipment effort for the project from the start of the year to the current date, expressed in hours.
  • Title: YTD Actual Labor Effort
    Read Only: true
    Actual labor effort for the project from the start of the year to the current date, expressed in hours.
  • Title: YTD Actual Raw Cost
    Read Only: true
    Actual cost incurred for the project that is directly attributable to the work performed from the start of the year to the current date.
  • Title: YTD Budget Burden Cost
    Read Only: true
    Planned legitimate cost of doing business that supports raw cost for the project from the start of the year till the current date.
  • Title: YTD Budget Cost
    Read Only: true
    Planned cost for the project from the start of the year till the current date.
  • Title: YTD Budget Effort
    Read Only: true
    Planned effort for the project from the start of the year till the current date, expressed in hours.
  • Title: YTD Budget Equipment Effort
    Read Only: true
    Planned equipment effort for the project from the start of the year to the current date, expressed in hours.
  • Title: YTD Budget Labor Effort
    Read Only: true
    Planned labor effort for the project from the start of the year to the current date, expressed in hours.
  • Title: YTD Budget Raw Cost
    Read Only: true
    Planned cost for the project that is directly attributable to the work performed from the start of the year till the current date.
  • Title: YTD Budget Revenue
    Read Only: true
    Planned revenue for the project from the start of the year till the current date.
  • Title: YTD Committed Burden Cost
    Read Only: true
    Legitimate committed cost of doing business that supports raw cost for the project from the start of the year to the current date.
  • Title: YTD Committed Cost
    Read Only: true
    Sum of various project commitment costs from the start of the year to the current date.
  • Title: YTD Committed Raw Cost
    Read Only: true
    Cost committed for the project that is directly attributable to the work performed from the start of the year to the current date.
  • Title: YTD Other Committed Burden Cost
    Read Only: true
    Other legitimate committed cost of doing business that supports raw cost for the project from the start of the year till the current date.
  • Title: YTD Other Committed Cost
    Read Only: true
    Cost committed for the project through other commitments from the start of the year till the current date.
  • Title: YTD Other Committed Raw Cost
    Read Only: true
    Other cost committed for the project that is directly attributable to the work performed from the start of the year till the current date.
  • Title: YTD Forecast Burden Cost
    Read Only: true
    Forecasted legitimate cost of doing business that supports raw cost for the project from the start of the year till the current date.
  • Title: YTD Forecast Cost
    Read Only: true
    Forecasted cost for the project from the start of the year till the current date.
  • Title: YTD Forecast Effort
    Read Only: true
    Forecasted effort for the project from the start of the year till the current date expressed in hours.
  • Title: YTD Forecast Equipment Effort
    Read Only: true
    Forecasted equipment effort for the project from the start of the year to the current date, expressed in hours.
  • Title: YTD Forecast Labor Effort
    Read Only: true
    Forecasted labor effort for the project from the start of the year to the current date, expressed in hours.
  • Title: YTD Forecast Raw Cost
    Read Only: true
    Forecasted cost for the project that is directly attributable to the work performed from the start of the year to the current date.
  • Title: YTD Forecast Revenue
    Read Only: true
    Forecasted revenue for the project from the start of the year till the current date.
  • Title: YTD Invoice Amount
    Read Only: true
    Monetary value of an invoice created for the contract from the start of the year to the current date.
  • Title: YTD Purchase Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through purchase orders that supports raw cost for the project from the start of the year till the current date.
  • Title: YTD Purchase Order Committed Cost
    Read Only: true
    Cost committed for the project through purchase orders from the start of the year till the current date.
  • Title: YTD Purchase Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through purchase orders that is directly attributable to the work performed from the start of the year to the current date.
  • Title: YTD Requisition Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through requisitions that supports raw cost for the project from the start of the year till the current date.
  • Title: YTD Requisition Committed Cost
    Read Only: true
    Cost committed for the project through requisitions from the start of the year to the current date.
  • Title: YTD Requisition Committed Raw Cost
    Read Only: true
    Cost committed for the project through requisitions that is directly attributable to the work performed from the start of the year till the current date.
  • Title: YTD Revenue
    Read Only: true
    Amount of revenue recognized and summarized for the project from the start of the year to the current date.
  • Title: YTD Supplier Invoice Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through supplier invoices that supports raw cost for the project from the start of the year to the current date.
  • Title: YTD Supplier Invoice Committed Cost
    Read Only: true
    Cost committed for the project through supplier invoices from the start of the year to the current date.
  • Title: YTD Supplier Invoice Committed Raw Cost
    Read Only: true
    Cost committed for the project through supplier invoices that is directly attributable to the work performed from the start of the year to the current date.
  • Title: YTD Transfer Order Committed Burden Cost
    Read Only: true
    Legitimate cost of doing business committed through transfer orders that supports raw cost for the project from the start of the year to the current date.
  • Title: YTD Transfer Order Committed Cost
    Read Only: true
    Cost committed for the project through transfer orders from the start of the year to the current date.
  • Title: YTD Transfer Order Committed Raw Cost
    Read Only: true
    Cost committed for the project through transfer orders that is directly attributable to the work performed from the start of the year to the current date.
Back to Top

Examples

The following example shows how to get performance data for a resource by submitting a GET request on the REST resource using cURL.

curl --user ppm_cloud_user https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/resourcePerformance/00060000000EACED0005770800005AF3112A40B00000000EACED0005770800005AF3112A40AE0000000EACED0005770800005AF3112A40AF0000000EACED00057708000110F07A6D068100000001470000000146

Response Body Example

The following shows an example of the response body in JSON format.

{
"ResourceId": 100000011534512,
"ResourceName": "Cable Services PRBS",
"ParentResource": null,
"ParentResourceId": null,
"ResourceBreakdownStructure": "Cable Services PRBS",
"ResourceBreakdownStructureId": 100000011534510,
"ResourceBreakdownStructureVersion": 1,
"ResourceBreakdownStructureVersionId": 100000011534511,
"PrimaryReportingFlag": "true",
"Level": 1,
"OutlineNumber": "0",
"LowestLevelResourceFlag": "false",
"ResourceFormat": null,
"ResourceClass": null,
"ResourceClassCode": null,
"BusinessUnit": "Vision Operations",
"BusinessUnitId": 204,
"Organization": "Vision Operations",
"OrganizationId": 204,
"ProjectType": "Cable Service Line (VO)",
"ProjectTypeId": 100000011534693,
"ProjectManager": "Abraham Mason",
"ProjectManagerId": 100010032550827,
"ProjectName": "SeleniumProject229",
"ProjectNumber": "SeleniumProject229",
"ProjectId": 300100008871553,
"ProjectStatus": "Approved",
"ProjectUnit": "Project Operations",
"ProjectUnitId": 100010023900163,
"CalendarType": "Accounting",
"CalendarTypeCode": "G",
"CalendarId": 100000021131006,
"CurrencyType": "Project ledger currency",
"CurrencyTypeCode": "F",
"Currency": "USD",
"PeriodName": "Sep-18",
"SummarizationStatus": "Last summarized on: {2018-09-05}",
"ITDActualCost": 27073.13,
"PTDActualCost": 0,
"QTDActualCost": 0,
"YTDActualCost": 0,
"ITDActualRawCost": 19610,
"PTDActualRawCost": 0,
"QTDActualRawCost": 0,
"YTDActualRawCost": 0,
"ITDActualBurdenCost": 7463.13,
"PTDActualBurdenCost": 0,
"QTDActualBurdenCost": 0,
"YTDActualBurdenCost": 0,
"ITDActualEffort": 4420,
"ITDActualLaborEffort": 12,
"ITDActualEquipmentEffort": 8,
"PTDActualEffort": 0,
"PTDActualLaborEffort": 0,
"PTDActualEquipmentEffort": 0,
"QTDActualEffort": 0,
"QTDActualLaborEffort": 0,
"QTDActualEquipmentEffort": 0,
"YTDActualEffort": 0,
"YTDActualLaborEffort": 0,
"YTDActualEquipmentEffort": 0,
"ITDCommittedCost": 0,
"PTDCommittedCost": 0,
"QTDCommittedCost": 0,
"YTDCommittedCost": 0,
"ITDCommittedRawCost": 0,
"PTDCommittedRawCost": 0,
"QTDCommittedRawCost": 0,
"YTDCommittedRawCost": 0,
"ITDCommittedBurdenCost": 0,
"PTDCommittedBurdenCost": 0,
"QTDCommittedBurdenCost": 0,
"YTDCommittedBurdenCost": 0,
"ITDSupplierInvoiceCommittedCost": 0,
"PTDSupplierInvoiceCommittedCost": 0,
"QTDSupplierInvoiceCommittedCost": 0,
"YTDSupplierInvoiceCommittedCost": 0,
"ITDSupplierInvoiceCommittedRawCost": 0,
"PTDSupplierInvoiceCommittedRawCost": 0,
"QTDSupplierInvoiceCommittedRawCost": 0,
"YTDSupplierInvoiceCommittedRawCost": 0,
"ITDSupplierInvoiceCommittedBurdenCost": 0,
"PTDSupplierInvoiceCommittedBurdenCost": 0,
"QTDSupplierInvoiceCommittedBurdenCost": 0,
"YTDSupplierInvoiceCommittedBurdenCost": 0,
"ITDRequisitionCommittedCost": 0,
"PTDRequisitionCommittedCost": 0,
"QTDRequisitionCommittedCost": 0,
"YTDRequisitionCommittedCost": 0,
"ITDRequisitionCommittedRawCost": 0,
"PTDRequisitionCommittedRawCost": 0,
"QTDRequisitionCommittedRawCost": 0,
"YTDRequisitionCommittedRawCost": 0,
"ITDRequisitionCommittedBurdenCost": 0,
"PTDRequisitionCommittedBurdenCost": 0,
"QTDRequisitionCommittedBurdenCost": 0,
"YTDRequisitionCommittedBurdenCost": 0,
"ITDPurchaseOrderCommittedCost": 0,
"PTDPurchaseOrderCommittedCost": 0,
"QTDPurchaseOrderCommittedCost": 0,
"YTDPurchaseOrderCommittedCost": 0,
"ITDPurchaseOrderCommittedRawCost": 0,
"PTDPurchaseOrderCommittedRawCost": 0,
"QTDPurchaseOrderCommittedRawCost": 0,
"YTDPurchaseOrderCommittedRawCost": 0,
"ITDPurchaseOrderCommittedBurdenCost": 0,
"PTDPurchaseOrderCommittedBurdenCost": 0,
"QTDPurchaseOrderCommittedBurdenCost": 0,
"YTDPurchaseOrderCommittedBurdenCost": 0,
"ITDExternalCommittedCost": 0,
"PTDExternalCommittedCost": 0,
"QTDExternalCommittedCost": 0,
"YTDExternalCommittedCost": 0,
"ITDExternalCommittedRawCost": 0,
"PTDExternalCommittedRawCost": 0,
"QTDExternalCommittedRawCost": 0,
"YTDExternalCommittedRawCost": 0,
"ITDExternalCommittedBurdenCost": 0,
"PTDExternalCommittedBurdenCost": 0,
"QTDExternalCommittedBurdenCost": 0,
"YTDExternalCommittedBurdenCost": 0,
"ITDBudgetCost": 67598.44,
"PTDBudgetCost": 0,
"QTDBudgetCost": 0,
"YTDBudgetCost": 0,
"EACBudgetCost": 67598.44,
"ITDBudgetRawCost": 48009,
"PTDBudgetRawCost": 0,
"QTDBudgetRawCost": 0,
"YTDBudgetRawCost": 0,
"EACBudgetRawCost": 48009,
"ITDBudgetBurdenCost": 19589.44,
"PTDBudgetBurdenCost": 0,
"QTDBudgetBurdenCost": 0,
"YTDBudgetBurdenCost": 0,
"EACBudgetBurdenCost": 19589.44,
"ITDBudgetRevenue": 0,
"PTDBudgetRevenue": 0,
"QTDBudgetRevenue": 0,
"YTDBudgetRevenue": 0,
"EACBudgetRevenue": 0,
"ITDBudgetEffort": 4237,
"ITDBudgetLaborEffort": 697,
"ITDBudgetEquipmentEffort": 40,
"PTDBudgetEffort": 0,
"PTDBudgetLaborEffort": 0,
"PTDBudgetEquipmentEffort": 0,
"QTDBudgetEffort": 0,
"QTDBudgetLaborEffort": 0,
"QTDBudgetEquipmentEffort": 0,
"YTDBudgetEffort": 0,
"YTDBudgetLaborEffort": 0,
"YTDBudgetEquipmentEffort": 0,
"EACBudgetEffort": 4237,
"EACBudgetLaborEffort": 697,
"EACBudgetEquipmentEffort": 40,
"ITDForecastCost": 0,
"PTDForecastCost": 0,
"QTDForecastCost": 0,
"YTDForecastCost": 0,
"EACForecastCost": 0,
"ITDForecastRawCost": 0,
"PTDForecastRawCost": 0,
"QTDForecastRawCost": 0,
"YTDForecastRawCost": 0,
"EACForecastRawCost": 0,
"ITDForecastBurdenCost": 0,
"PTDForecastBurdenCost": 0,
"QTDForecastBurdenCost": 0,
"YTDForecastBurdenCost": 0,
"EACForecastBurdenCost": 0,
"ITDForecastRevenue": 0,
"PTDForecastRevenue": 0,
"QTDForecastRevenue": 0,
"YTDForecastRevenue": 0,
"EACForecastRevenue": 0,
"ITDForecastEffort": 0,
"ITDForecastLaborEffort": 0,
"ITDForecastEquipmentEffort": 0,
"PTDForecastEffort": 0,
"PTDForecastLaborEffort": 0,
"PTDForecastEquipmentEffort": 0,
"QTDForecastEffort": 0,
"QTDForecastLaborEffort": 0,
"QTDForecastEquipmentEffort": 0,
"YTDForecastEffort": 0,
"YTDForecastLaborEffort": 0,
"YTDForecastEquipmentEffort": 0,
"EACForecastEffort": 0,
"EACForecastLaborEffort": 0,
"EACForecastEquipmentEffort": 0,
"ITDRevenue": 0,
"PTDRevenue": 0,
"QTDRevenue": 0,
"YTDRevenue": 0,
"ITDInvoiceAmount": 0,
"PTDInvoiceAmount": 0,
"QTDInvoiceAmount": 0,
"YTDInvoiceAmount": 0
}