Import Assignment Labor Schedules

Creates assignment level labor schedules for the labor schedule information provided in the associated Labor Distribution open interface table.

Details

  • Object owner: PRC: Project Costing: Project Setup Labor Distributions

  • UCM account: prj/projectCosting/import

File Links

File Link
XLSM template ImportAssignmentLaborSchedules.xlsm
Control files

Job and Table Links

Name Link
Scheduled process

Load Interface File for Import

Tables