Project and Task Cost Rate Overrides REST Endpoints

Project and Task Cost Rate Overrides
The Project and Task Cost Rate Overrides resource is used to view, create, update, or delete the cost rate overrides defined for a project.
Create a Cost Rate Override
Method: post
Path: /fscmRestApi/resources/11.13.18.05/projectandTaskCostRateOverrides
Delete a Cost Rate Override detail
Method: delete
Path: /fscmRestApi/resources/11.13.18.05/projectandTaskCostRateOverrides/{RateOverrideId}
Get a Cost Rate Override detail
Method: get
Path: /fscmRestApi/resources/11.13.18.05/projectandTaskCostRateOverrides/{RateOverrideId}
Get all Cost Rate Override details
Method: get
Path: /fscmRestApi/resources/11.13.18.05/projectandTaskCostRateOverrides
Update a Cost Rate Override detail
Method: patch
Path: /fscmRestApi/resources/11.13.18.05/projectandTaskCostRateOverrides/{RateOverrideId}