Create a project forecast version
/fscmRestApi/resources/11.13.18.05/projectForecasts
Request
-
Metadata-Context:
If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
-
REST-Framework-Version:
The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
-
Upsert-Mode:
Contains one of the following values: true or false. If true, the server performs an Upsert operation instead of a Create operation. During an Upsert operation, the server attempts to find an existing resource that matches the payload. If a match is found, the server updates the existing resource instead of creating a new one. If not found or false (default), the server performs a Create operation. Note that the Upsert operation isn't supported for date-effective REST resources.
- application/json
object
-
AdjustmentPercentage: number
Title:
Adjustment Percentage
Percentage by which to adjust the forecast version amounts when copying amounts from another source. -
AdministrativeCode: string
Title:
Administrative Code
Identifies the action that an administrator can perform on the forecast version based on specific requirements. Not to be used in typical implementations. -
Attachments: array
Project Forecast Attachments
Title:
Project Forecast Attachments
The attachments resource is used to view, create, update and delete attachments for project forecasts. -
DeferFinancialPlanCreation: string
Title:
Defer Financial Plan Creation
Default Value:Y
Indicates that the forecast version will be created in a deferred mode. The default value is Y. A value of Y means that the forecast version will be created in a deferred mode by the Process Financial Plan Versions process. A value of N means that the forecast version will be created in real time and will be included in the response of the POST operation. -
FinancialPlanType: string
Title:
Financial Plan Type
Maximum Length:240
Name of the financial plan type used to create the forecast version. -
ForecastCreationMethod: string
Title:
Forecast Creation Method
Determines whether the forecast version is generated from another plan or copied from another forecast version. A list of valid values - Copy from another source and Generate from another source - is defined in the lookup type PJO_FORECAST_CREATION_METHOD. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Creation Method Code but not both while creating a forecast version. -
ForecastCreationMethodCode: string
Title:
Forecast Creation Method Code
Determines whether the forecast version is generated from another plan or copied from another forecast version. A list of valid values - COPY and GENERATE - is defined in the lookup type PJO_FORECAST_CREATION_METHOD. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Creation Method but not both while creating a forecast version. -
ForecastGenerationSource: string
Title:
Forecast Generation Source
Determines whether the forecast version is generated from an existing forecast version based on a financial plan type or from the project plan. A list of valid values - Financial plan type and Project plan type - is defined in the lookup type PJO_PLAN_TYPE_CODE. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Generation Source Code but not both while creating a forecast version. -
ForecastGenerationSourceCode: string
Title:
Forecast Generation Source Code
Determines whether the forecast version is generated from an existing forecast version based on a financial plan type or from the project plan. A list of valid values - FINANCIAL_PLAN and PROJECT_PLAN - is defined in the lookup type PJO_PLAN_TYPE_CODE. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Generation Source but not both while creating a forecast version. -
LockedFlag: boolean
Title:
Locked
Indicates if the project forecast version is locked. A value of true means that the forecast version is locked and can't be edited. A value of false means that the forecast version is not locked and can be edited. The default value while creating a project forecast version is false. -
PlanningAmounts: string
Title:
Planning Amounts
Maximum Length:30
Indicates whether a forecast version includes cost amounts, revenue amounts, or both. A list of valid values - Cost, Revenue, and Cost and revenue - is defined in the lookup type PJO_PLANNED_FOR_CODE. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Generation Source but not both while creating a forecast version. -
PlanningOptions: array
Planning Options
Title:
Planning Options
The Planning Options resource is used to view the planning options configured for the project forecast version. -
PlanningResources: array
Planning Resources
Title:
Planning Resources
The Planning Resources resource is used to view project forecast resource assignments. -
PlanVersionDescription: string
Title:
Plan Version Description
Maximum Length:2000
Description of the forecast version. -
PlanVersionId: integer
(int64)
Title:
Forecast Version ID
Identifier of the forecast version. -
PlanVersionName(required): string
Title:
Plan Version Name
Maximum Length:225
Name of the forecast version. -
PlanVersionStatus: string
Title:
Plan Version Status
The status of the forecast version. A list of valid values is defined in the lookup type PJO_PLAN_STATUS. -
ProjectId(required): integer
(int64)
Title:
Project ID
Identifier of the project for which the forecast version is created. You must enter a value for only one from among this attribute, Project Number, and Project Name but not for all three or a combination of them while creating a forecast version. -
ProjectName(required): string
Title:
Project Name
Maximum Length:240
Name of the project for which the forecast version is created. You must enter a value for only one from among this attribute, Project ID, and Project Number but not for all three or a combination of them while creating a forecast version. -
ProjectNumber(required): string
Title:
Project Number
Maximum Length:25
Number of the project for which the forecast version is created. You must enter a value for only one from among this attribute, Project ID, and Project Name but not for all three or a combination of them while creating a forecast version. -
ProjectResourcesStatus: string
Title:
Project Resources Status
Status of the project resources to be used for generation. Valid values are: All and Confirmed. -
SourcePlanType: string
Title:
Source Plan Type
Indicates the financial plan type or the project plan from which the forecast version is created. If the forecast generation source is entered as Project plan type, then this attribute is defaulted as project plan by the application. If the forecast generation source is entered as Financial plan type, then you must enter a value for this attribute. -
SourcePlanVersionId: integer
Title:
Source Plan Version ID
Identifier of the version of the project plan, budget, or forecast used as the source for creating the forecast version. -
SourcePlanVersionName: string
Title:
Source Plan Version Name
The name of the version of the project plan, budget, or forecast used as the source for creating the forecast version. -
SourcePlanVersionNumber: integer
Title:
Source Plan Version Number
The number of the version of the project plan, budget, or forecast used as the source for creating the forecast version. -
SourcePlanVersionStatus: string
Title:
Source Plan Version Status
The status of the source plan version from which the forecast version is created. A list of valid values is defined in the lookup type PJO_PLAN_STATUS. -
VersionErrors: array
Errors
Title:
Errors
The Errors resource is used to view the errors in project forecasts.
array
Project Forecast Attachments
array
Planning Options
array
Planning Resources
array
Errors
object
-
AsyncTrackerId: string
Title:
Asynchronous Upload Tracker Id
Attribute provided for the exclusive use by the Attachment UI components to assist in uploading files. -
AttachedDocumentId: integer
(int64)
Title:
Attached Document Id
The unique identifier of the attached document. -
CategoryName: string
Title:
Category
Maximum Length:30
The category of the attachment. - ContentRepositoryFileShared: boolean
-
DatatypeCode: string
Title:
Type
Maximum Length:30
Default Value:FILE
A value that indicates the data type. -
Description: string
Title:
Description
Maximum Length:255
The description of the attachment. -
DmDocumentId: string
Maximum Length:
255
The document ID from which the attachment is created. -
DmFolderPath: string
Title:
Dm Folder Path
Maximum Length:1000
The folder path from which the attachment is created. -
DmVersionNumber: string
Maximum Length:
255
The document version number from which the attachment is created. -
DownloadInfo: string
Title:
DownloadInfo
JSON object represented as a string containing information used to programmatically retrieve a file attachment. -
ErrorStatusCode: string
Title:
Error Status Code
The error code, if any, for the attachment. -
ErrorStatusMessage: string
Title:
Error Status Message
The error message, if any, for the attachment. -
ExpirationDate: string
(date-time)
Title:
Expiration Date
The expiration date of the contents in the attachment. -
FileContents: string
(byte)
Title:
File Contents
The contents of the attachment. -
FileName: string
Title:
File Name
Maximum Length:2048
The file name of the attachment. -
FileUrl: string
Title:
File Url
The URI of the file. -
PostProcessingAction: string
Title:
PostProcessingAction
The name of the action that can be performed after an attachment is uploaded. -
Title: string
Title:
Title
The title of the attachment. -
UploadedFileContentType: string
Title:
Uploaded File Content Type
The content type of the attachment. -
UploadedFileLength: integer
Title:
File Size
The size of the attachment file. -
UploadedFileName: string
Title:
Uploaded File Name
The name to assign to a new attachment file. -
UploadedText: string
Title:
Uploaded Text
The text content for a new text attachment. -
Uri: string
Title:
Uri
Maximum Length:4000
The URI of a Topology Manager type attachment. -
Url: string
Title:
Url
Maximum Length:4000
The URL of a web page type attachment.
object
-
ActualAmountsThroughPeriod: string
Title:
Actual Amounts Through Period
Maximum Length:255
The period (current, prior, or last closed) through which actual amounts are used when generating forecast amounts. -
AllowNegativeETCCalculationFlag: boolean
Title:
Allow Negative ETC Calculation
Indicates whether negative estimate-to-complete quantity can be calculated in progress. If the check box isn't enabled, and the calculated value is negative, then the estimate-to-complete quantity is set to zero. -
AmountScale: string
Title:
Amount Scale
Maximum Length:255
The scale on which amounts are displayed on the user interface. For example, if you select to view amounts in 1000s, the $100,000,000 amount is displayed as 100,000. -
AmountTypes: array
Amount Types
Title:
Amount Types
The Amount Type resource is used to select the cost and revenue items to include in a financial plan type. -
AssignTaskResourceInSingleCurrencyFlag: boolean
Title:
Assign Resource in Single Currency for a Task
Indicates whether a forecast line is enabled for assigning resources in a single currency for a task. -
AssociateProjectCostsOrRevenueToSummaryTasksFlag: boolean
Title:
Associate project costs or revenue to summary tasks
Maximum Length:255
Indicates whether the incurred costs or revenue for resources are associated on the task hierarchy at the level planned. -
BillRateDerivationDate: string
(date-time)
Title:
Bill Rate Derivation Date
The date that is used as the basis for deriving rates for calculating revenue amounts. -
BillRateDerivationDateType: string
Title:
Bill Rate Derivation Date Type
Maximum Length:255
The date type, for example, the system date or a fixed date that is used as the basis for deriving rates for calculating revenue amounts. -
BurdenScheduleCostOptions: string
Title:
Burden Schedule
Maximum Length:255
A set of burden multipliers that is maintained for use across projects. Also referred to as a standard burden schedule. -
CalendarType: string
Title:
Calendar Type
Maximum Length:255
The type of calendar, such as accounting calendar or project accounting calendar, used for entering and displaying periodic financial information. -
CarryForwardUnusedAmountsFromPastPeriodsFlag: boolean
Title:
Carry Forward Unused Amounts from Past Periods
Indicates whether unused forecast amounts can be carried over from the current or closed periods to the next open period. -
CostDateTypeForConversionInPC: string
Title:
Project Currency Conversion: Cost Date Type
Maximum Length:255
Date type that is used as a cost conversion attribute for project currency. -
CostDateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Cost Date Type
Maximum Length:255
Date type that is used as a cost conversion attribute for project ledger currency. -
CostFixedDateForConversionInPC: string
(date-time)
Title:
Project Currency Conversion: Cost Fixed Date
Date that's used as a cost conversion attribute for project currency. -
CostFixedDateForConversionInPLC: string
(date-time)
Title:
Project Ledger Currency Conversion: Cost Fixed Date
Date that's used as a cost conversion attribute for project ledger currency. -
CostRateDerivationDate: string
(date-time)
Title:
Cost Rate Derivation Date
The date that is used as the basis for deriving rates for calculating cost amounts. -
CostRateDerivationDateType: string
Title:
Cost Rate Derivation Date Type
Maximum Length:255
The date type, for example, the system date or a fixed date that is used as the basis for deriving rates for calculating cost amounts. -
CostRateTypeForConversionInPC: string
Title:
Project Currency Conversion: Cost Rate Type
Maximum Length:255
Cost rate type that is used as a cost conversion attribute for project currency. -
CostRateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Cost Rate Type
Maximum Length:255
Cost rate type that is used as a cost conversion attribute for project ledger currency. -
CurrencyType: string
Title:
Currency Type
Maximum Length:255
Indicates whether the project currency or the project ledger currency is used for displaying amounts when reviewing forecast amounts. -
CurrentPlanningPeriod: string
Title:
Current Planning Period
Maximum Length:15
Current planning period that drives the display of the periodic information. It can be the project accounting period or accounting period depending on the selected calendar type. This value is not applicable when the calendar type is set to NONE. -
DateTypeForCostConversion: string
Title:
Date Type for Cost Conversion
Maximum Length:255
Date type that is used as a cost conversion attribute for planning currencies. -
ETCGenerationSource: string
Title:
ETC Generation Source
Maximum Length:255
Specifies whether the estimate-to-complete source for generating a forecast version is the financial project plan, another financial plan, or project resources. -
ExportOptions: array
Export Options
Title:
Export Options
The Export Option resource is used to select the planning options attributes to export. -
FixedDateForCostConversion: string
(date-time)
Title:
Fixed Date for Cost Conversion
The date that is used to derive rates for calculating planned costs for planning currencies. -
FixedDateForRevenueConversion: string
(date-time)
Title:
Fixed Date for Revenue Conversion
The date that is used to derive rates for calculating planned revenue for planning currencies. -
ForecastETCMethod: string
Title:
Forecast ETC Method
Maximum Length:255
Method used to calculate estimate-to-complete values in project forecast. -
JobCostOptions: string
Title:
Job Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for jobs. -
JobRevenueOptions: string
Title:
Job Revenue Options
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for jobs. -
MaintainManualSpreadOnDateChanges: string
Title:
Maintain manual spread on date changes
Maximum Length:1
Indicates whether the periodic planning is retained in the plan version on plan line date modifications. A value of Y indicates that the attribute is selected. A value of N means that the attribute is not selected. -
MultipleTransactionCurrencies: string
Title:
Multiple Transaction Currencies
Maximum Length:255
Indicates that the plan can use multiple transaction currencies. A value of Y indicates that the attribute is selected. A value of N means that the attribute is not selected. -
NonlaborResourceCostOptions: string
Title:
Nonlabor Resource
Maximum Length:255
Rate schedule used for the calculation of cost amounts for non-labor resources. -
NonlaborResourceRevenueOptions: string
Title:
Nonlabor Resource
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for non-labor resources. -
OpenCommitments: string
Title:
Open Commitments
Maximum Length:1
Indicates whether project costs from commitments are included when generating budgets or forecasts. -
PeriodProfile: string
Title:
Period Profile
Maximum Length:255
Defines how time periods are grouped and displayed when editing forecast versions. -
PersonCostOptions: string
Title:
Person Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for named persons. -
PersonRevenueOptions: string
Title:
Person Revenue Options
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for named persons. -
PlanningCurrencies: array
Planning Currencies
Title:
Planning Currencies
The Planning Currency resource is used to view, create, update, and delete project and planning currencies. -
PlanningLevel: string
Title:
Planning Level
Maximum Length:255
Level of the forecast at which amounts can be entered. -
PlanningOptionId: integer
(int64)
Identifier of the summary level planning option in the project forecast version.
-
PlanningOptionsDFF: array
Planning Options Descriptive Flexfields
Title:
Planning Options Descriptive Flexfields
The Planning Options Descriptive Flexfields resource is used to capture, view, and update additional information for planning options in project forecast versions. -
PlanningResourceBreakdownStructure: string
Title:
Planning Resource Breakdown Structure
Maximum Length:255
Planning resource breakdown structure associated with the project. -
ProjectRoleCostOptions: string
Title:
Project Role Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for project role. -
ProjectRoleRevenueOptions: string
Title:
Project Role Revenue Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for project role. -
RateDerivationDate: string
(date-time)
Title:
Rate Derivation Date
The date that's used as the basis for deriving rates for calculating amounts on a None time phased forecast version. -
RateDerivationDateType: string
Title:
Rate Derivation Date Type
Maximum Length:255
The date type, for example, the system date or a fixed date that's used as the basis for deriving rates for calculating amounts on a None time phased forecast version. -
RateTypeForCostConversion: string
Title:
Rate Type for Cost Conversion
Maximum Length:255
Cost rate type that is used as a cost conversion attribute for planning currencies. -
ReportCost: string
Title:
Report Cost
Maximum Length:255
Determines the cost amount types that are used to calculate and report margins on forecasts. -
ResourceClassCostOptions: string
Title:
Resource Class Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for resource classes. This is used for cost calculation when rates are unavailable in rate schedules for named persons, jobs, or non-labor resources. -
ResourceClassRevenueOptions: string
Title:
Resource Class Revenue Options
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for resource classes. This is used for revenue calculation when rates are unavailable in rate schedules for named persons, jobs, or non-labor resources. -
RetainManuallyAddedForecastLinesFlag: boolean
Title:
Retain manually added forecast lines
Indicates whether manually added plans lines are retained when the forecast version is regenerated. -
RetainOverrideRatesFromSourceFlag: boolean
Indicates whether user specified cost and revenue rates from the source must be retained when generating the target budget or forecast version.
-
RetainSpreadFromSourceFlag: boolean
Title:
Retain Spread from Source
Indicates whether the periodic planning from the source is retained in the generated forecast version. -
RevenueDateTypeForConversionInPC: string
Title:
Project Currency Conversion: Revenue Date Type
Maximum Length:255
Date type that is used as a revenue conversion attribute for project currency. -
RevenueDateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Revenue Date Type
Maximum Length:255
Date type that is used as a revenue conversion attribute for project ledger currency. -
RevenueFixedDateForConversionInPC: string
(date-time)
Title:
Project Currency Conversion: Revenue Fixed Date
Date that's used as a revenue conversion attribute for project currency. -
RevenueFixedDateForConversionInPLC: string
(date-time)
Title:
Project Ledger Currency Conversion: Revenue Fixed Date
Date that's used as a revenue conversion attribute for project ledger currency. -
RevenueGenerationMethod: string
Title:
Revenue Generation Method
Maximum Length:255
Determines whether forecast revenue is calculated based on quantity and rates, event amounts, or the spread ratio specified for tasks. -
RevenueRateTypeForConversionInPC: string
Title:
Project Currency Conversion: Revenue Rate Type
Maximum Length:255
Revenue rate type that is used as a revenue conversion attribute for project currency. -
RevenueRateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Revenue Rate Type
Maximum Length:255
Revenue rate type that is used as a revenue conversion attribute for project ledger currency. -
UsePlanningRatesFlag: boolean
Title:
Use Planning Rates
Enables utilization of planning rates for resources and resource classes when calculating forecast amounts. -
UseSameConversionAttributeForAllCurrencyConversionsFlag: boolean
Title:
Use Same Conversion Attribute for All Currency Conversions
Indicates whether you can use the same currency conversion attribute for all currencies.
array
Amount Types
array
Export Options
array
Planning Currencies
array
Planning Options Descriptive Flexfields
object
-
AmountTypeId: integer
(int64)
Title:
Amount Type ID
Identifier of the project forecast version amount types. -
BillRateFlag: boolean
Title:
Bill rate
Indicates whether the revenue rate is editable. -
BurdenedCostFlag: boolean
Title:
Burdened Cost
Indicates whether the burdened cost amounts for a forecast version are editable. -
BurdenedCostRateFlag: boolean
Title:
Burdened Cost Rate
Indicates whether the burdened cost rate is editable. -
QuantityFlag: boolean
Title:
Quantity
Maximum Length:255
Indicates whether the quantity is editable on a budget or forecast version. -
RawCostFlag: boolean
Title:
Raw Cost
Indicates whether the raw cost amounts for a forecast version are editable. -
RawCostRateFlag: boolean
Title:
Raw Cost Rate
Indicates whether the raw cost rate is editable. -
RevenueFlag: boolean
Title:
Revenue
Indicates whether the revenue for a forecast version is editable.
object
-
ActualBurdenedCostAmounts: string
Title:
Burdened Cost: Actual Amounts
Maximum Length:1
Actual burdened cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualBurdenedCostInPC: string
Title:
Burdened Cost in Project Currency: Actual Amounts
Maximum Length:1
Actual burdened costs incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualBurdenedCostInPLC: string
Title:
Burdened Cost in Project Ledger Currency: Actual Amounts
Maximum Length:1
Actual burdened costs incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualMargin: string
Title:
Margin: Actual Amounts
Maximum Length:1
Difference between actual project-related costs and actual revenue amounts. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualMarginInPC: string
Title:
Margin in Project Currency: Actual Amounts
Maximum Length:1
Difference between actual project-related costs and actual revenue amounts calculated using project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualMarginInPLC: string
Title:
Margin in Project Ledger Currency: Actual Amounts
Maximum Length:1
Difference between actual project-related costs and actual revenue amounts calculated using project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualQuantity: string
Title:
Quantity: Actual Amounts
Maximum Length:1
Actual quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRawCostAmounts: string
Title:
Raw Cost: Actual Amounts
Maximum Length:1
Actual cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRawCostInPC: string
Title:
Raw Cost in Project Currency: Actual Amounts
Maximum Length:1
Actual cost amounts incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRawCostInPLC: string
Title:
Raw Cost in Project Ledger Currency: Actual Amounts
Maximum Length:1
Actual cost amounts incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRevenueAmounts: string
Title:
Revenue: Actual Amounts
Maximum Length:1
Actual revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRevenueInPC: string
Title:
Revenue in Project Currency: Actual Amounts
Maximum Length:1
Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRevenueInPLC: string
Title:
Revenue in Project Ledger Currency: Actual Amounts
Maximum Length:1
Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostEffectiveMultiplier: string
Title:
Burdened Cost: Effective Multiplier
Maximum Length:1
Multiplier used to calculate the burdened costs. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostInvoiceCommitments: string
Title:
Burdened Cost Commitments: Supplier Invoices
Maximum Length:1
Costs for supplier invoices billed against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostInvoiceCommitmentsInPC: string
Title:
Burdened Cost Commitments in Project Currency: Supplier Invoices
Maximum Length:1
Burdened costs for supplier invoices billed against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostInvoiceCommitmentsInPLC: string
Title:
Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
Maximum Length:1
Burdened costs for supplier invoices billed against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPOCommitments: string
Title:
Burdened Cost Commitments: Purchase Orders
Maximum Length:1
Burdened costs for purchase orders against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPOCommitmentsInPC: string
Title:
Burdened Cost Commitments in Project Currency: Purchase Orders
Maximum Length:1
Burdened costs for purchase orders against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPOCommitmentsInPLC: string
Title:
Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
Maximum Length:1
Burdened costs for purchase orders against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPRCommitments: string
Title:
Burdened Cost Commitments: Requisitions
Maximum Length:1
Burdened costs for outstanding purchase requisitions against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPRCommitmentsInPC: string
Title:
Burdened Cost Commitments in Project Currency: Requisitions
Maximum Length:1
Burdened costs for outstanding purchase requisitions against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPRInCommitmentsPLC: string
Title:
Burdened Cost Commitments in Project Ledger Currency: Requisitions
Maximum Length:1
Burdened costs for outstanding purchase requisitions against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostStandardMultiplier: string
Title:
Burdened Cost: Standard Multiplier
Maximum Length:1
Standard multiplier derived from the burden schedule for calculating burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostStandardRate: string
Title:
Burdened Cost: Standard Rate
Maximum Length:1
Standard rate derived from the rate schedule for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
DisplayCommitmentsFlag: boolean
Title:
Display Commitments
Indicates whether to display the external commitments present in the budget or forecast plan lines. -
DisplayRatesAndAmountsInMultipleTransactionCurrenciesFlag: boolean
Title:
Display currency conversion attributes and amounts in multiple transaction currencies
Indicates whether to display the currency conversion attributes and amounts in multiple transaction currencies if the plan type allows planning in multiple transaction currencies. -
EACBurdenedCost: string
Title:
Burdened Cost: EAC
Maximum Length:1
Estimate of burdened cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACBurdenedCostInPC: string
Title:
Burdened Cost in Project Currency: EAC
Maximum Length:1
Estimate of burdened costs incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACBurdenedCostInPLC: string
Title:
Burdened Cost in Project Ledger Currency: EAC
Maximum Length:1
Estimate of burdened costs incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMargin: string
Title:
Margin: EAC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMarginInPC: string
Title:
Margin in Project Currency: EAC
Maximum Length:1
Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMarginInPLC: string
Title:
Margin in Project Ledger Currency: EAC
Maximum Length:1
Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMarginPercentage: string
Title:
Margin Percentage: EAC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACQuantity: string
Title:
Quantity: EAC
Maximum Length:1
Estimate-at-completion quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRawCost: string
Title:
Raw Cost: EAC
Maximum Length:1
Estimate of cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRawCostInPC: string
Title:
Raw Cost in Project Currency: EAC
Maximum Length:1
Estimate of cost amounts incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRawCostInPLC: string
Title:
Raw Cost in Project Ledger Currency: EAC
Maximum Length:1
Estimate of cost amounts incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRevenue: string
Title:
Revenue: EAC
Maximum Length:201
Estimate-at-completion revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRevenueInPC: string
Title:
Revenue in Project Currency: EAC
Maximum Length:1
Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRevenueInPLC: string
Title:
Revenue in Project Ledger Currency: EAC
Maximum Length:1
Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EffectiveBurdenedCostRate: string
Title:
Burdened Cost: Effective Rate
Maximum Length:1
User entered rate for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EffectiveRawCostRate: string
Title:
Raw Cost: Effective Rate
Maximum Length:1
User entered rate for calculating the raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EffectiveRevenueRate: string
Title:
Effective Revenue Rate
Maximum Length:1
User entered rate for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCBurdenedCost: string
Title:
Burdened Cost: ETC
Maximum Length:1
Estimate of burdened cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCBurdenedCostInPC: string
Title:
Burdened Cost in Project Currency: ETC
Maximum Length:1
Estimate of burdened costs to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCBurdenedCostInPLC: string
Title:
Burdened Cost in Project Ledger Currency: ETC
Maximum Length:1
Estimate of burdened costs to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMargin: string
Title:
Margin: ETC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMarginInPC: string
Title:
Margin in Project Currency: ETC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMarginInPLC: string
Maximum Length:
1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMarginPercentage: string
Title:
Margin Percentage: ETC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCQuantity: string
Title:
Quantity: ETC
Maximum Length:1
Estimate-to-complete quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRawCost: string
Title:
Raw Cost: ETC
Maximum Length:1
Estimate of cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRawCostInPC: string
Title:
Raw Cost in Project Currency: ETC
Maximum Length:1
Estimate of cost amounts to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRawCostInPLC: string
Title:
Raw Cost in Project Ledger Currency: ETC
Maximum Length:1
Estimate of cost amounts to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRevenue: string
Title:
ETC Revenue
Maximum Length:1
Estimate-to-complete revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRevenueInPC: string
Title:
Revenue in Project Currency: ETC
Maximum Length:1
Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRevenueInPLC: string
Title:
Revenue in Project Ledger Currency: ETC
Maximum Length:1
Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ExportOptionId: integer
Title:
Export Options ID
Identifier of the project forecast version export options. -
FromDate: string
Title:
From Date
Maximum Length:1
From date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionCostDate: string
Title:
Project Currency Conversion: Cost Date
Maximum Length:1
Date that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionCostDateType: string
Title:
Project Currency Conversion: Cost Date Type
Maximum Length:1
Date type that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionCostRate: string
Title:
Project Currency Conversion: Cost Rate
Maximum Length:1
Cost rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionCostRateType: string
Title:
Project Currency Conversion: Cost Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueDate: string
Title:
Project Currency Conversion: Revenue Date
Maximum Length:1
Date that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueDateType: string
Title:
Project Currency Conversion: Revenue Date Type
Maximum Length:1
Date type that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueRate: string
Title:
Project Currency Conversion: Revenue Rate
Maximum Length:1
Revenue rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueRateType: string
Title:
Project Currency Conversion: Revenue Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostDate: string
Title:
Project Ledger Currency Conversion: Cost Date
Maximum Length:1
Date that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostDateType: string
Title:
Project Ledger Currency Conversion: Cost Date Type
Maximum Length:1
Date type that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostRate: string
Title:
Project Ledger Currency Conversion: Cost Rate
Maximum Length:1
Cost rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostRateType: string
Title:
Project Ledger Currency Conversion: Cost Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueDate: string
Title:
Project Ledger Currency Conversion: Revenue Date
Maximum Length:1
Date that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueDateType: string
Title:
Project Ledger Currency Conversion: Revenue Date Type
Maximum Length:1
Date type that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueRate: string
Title:
Project Ledger Currency Conversion: Revenue Rate
Maximum Length:1
Revenue rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueRateType: string
Title:
Project Ledger Currency Conversion: Revenue Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
QuantityInvoiceCommitments: string
Title:
Quantity Commitments: Supplier Invoices
Maximum Length:1
Planned quantity of supplier invoice commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
QuantityPOCommitments: string
Title:
Quantity Commitments: Purchase Orders
Maximum Length:1
Planned quantity of purchase order commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
QuantityPRCommitments: string
Title:
Quantity Commitments: Requisitions
Maximum Length:1
Planned quantity of purchase requisition commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostInvoiceCommitments: string
Title:
Raw Cost Commitments: Supplier Invoices
Maximum Length:1
Costs from supplier invoices that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostInvoiceCommitmentsInPC: string
Title:
Raw Cost Commitments in Project Currency: Supplier Invoices
Maximum Length:1
Costs from supplier invoices that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostInvoiceCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
Maximum Length:1
Costs from supplier invoices that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPOCommitments: string
Title:
Raw Cost Commitments: Purchase Orders
Maximum Length:1
Purchase order costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPOCommitmentsInPC: string
Title:
Raw Cost Commitments in Project Currency: Purchase Orders
Maximum Length:1
Purchase order costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPOCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Ledger Currency: Purchase Orders
Maximum Length:1
Purchase order costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPRCommitments: string
Title:
Raw Cost Commitments: Requisitions
Maximum Length:1
Purchase requisition costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPRCommitmentsInPC: string
Title:
Raw Cost Commitments in Project Currency: Requisitions
Maximum Length:1
Purchase requisition costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPRCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Ledger Currency: Requisitions
Maximum Length:1
Purchase requisition costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
StandardRawCostRate: string
Title:
Raw Cost: Standard Rate
Maximum Length:1
Rate derived from the rate schedule for calculating raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
StandardRevenueRate: string
Title:
Revenue: Standard Rate
Maximum Length:1
Rate derived from the rate schedule for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ToDate: string
Title:
To Date
Maximum Length:1
End date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalBurdenedCostCommitments: string
Title:
Burdened Cost: Total Commitments
Maximum Length:1
Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalBurdenedCostCommitmentsInPC: string
Title:
Burdened Cost in Project Currency: Total Commitments
Maximum Length:1
Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalBurdenedCostCommitmentsInPLC: string
Title:
Burdened Cost in Project Ledger Currency: Total Commitments
Maximum Length:1
Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalQuantityCommitments: string
Title:
Quantity: Total Commitments
Maximum Length:1
Total commitments quantity required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalRawCostCommitments: string
Title:
Raw Cost: Total Commitments
Maximum Length:1
Total commitments incurred by the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalRawCostCommitmentsInPC: string
Title:
Raw Cost in Project Currency: Total Commitments
Maximum Length:1
Total commitments incurred by the project in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalRawCostCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Currency: Total Commitments
Maximum Length:1
Total commitments incurred by the project in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
UnitOfMeasure: string
Title:
Unit of Measure
Maximum Length:1
Unit of measure for a resource. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
object
-
PlanningCurrencyCode: string
Title:
Planning Currency Code
Maximum Length:15
Currency code for the planning currency. -
PlanningCurrencyId: integer
(int64)
Title:
Planning Currency ID
Identifier of the planning currency.
object
-
__FLEX_Context: string
Title:
Context Segment
Maximum Length:30
Code that identifies the context for the segments of the planning options flexfields. -
__FLEX_Context_DisplayValue: string
Title:
Context Segment
Name of the context for the segments of the planning options flexfields. -
PlanningOptionId: integer
(int64)
Identifier of the summary level planning option in the project forecast version.
object
-
MaintainManualSpreadOnDateChanges: string
Default Value:
N
Indicates whether the periodic planning is retained in the plan version on plan line date modifications. -
PlanningAmounts: array
Planning Amounts
Title:
Planning Amounts
The Planning Amounts resource is used to view project forecast resource assignment summary amounts. -
PlanningElementId: integer
(int64)
Title:
Planning Element ID
Identifier of the planning resources of the forecast version. -
PlanningEndDate: string
(date-time)
Title:
Planning Dates: To Date
The date that is planned on the financial plan for a resource to begin their assignment on a project task. -
PlanningStartDate: string
(date-time)
Title:
Planning Dates: From Date
The date that is planned on the financial plan for a resource to finish their assignment on a project task. -
RbsElementId(required): integer
(int64)
Title:
Planning Resource
Identifier of the resource breakdown structure element used to create the financial plan resource assignment. -
ResourceName: string
Title:
Resource
Maximum Length:240
Name or alias of the resource included in the planning resource breakdown structure that is used to create the financial plan resource assignment. -
TaskId(required): integer
(int64)
Title:
Task
Identifier of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment. -
TaskName: string
Title:
Task Name
Maximum Length:255
Name of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task ID, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment. -
TaskNumber: string
Title:
Task Number
Maximum Length:100
Number of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task ID but not for all three or a combination of them while creating a financial plan resource assignment.
array
Planning Amounts
object
-
Currency(required): string
Maximum Length:
15
Code that identifies the planning currency on the forecast version resource assignment. -
EACBurdenedCost: number
Title:
Burdened Cost
Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACQuantity: number
Title:
Quantity: EAC
Measure of the effort planned for in the forecast version resource assignment. -
EACRawCost: number
Title:
Raw Cost
Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed. -
EACRevenue: number
Title:
Revenue: EAC
Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task. -
EffectiveETCBurdenedCostRate: number
Title:
Burdened Cost: Effective Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. -
EffectiveETCRawCostRate: number
Title:
Effective ETC Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. -
EffectiveETCRevenueRate: number
Title:
Revenue: Effective Rate
Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue. -
ManualSpreadFlag: boolean
Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. -
PlanLineId: integer
(int64)
Title:
Plan Line ID
Identifier of the summary level planning amounts for a resource assignment in the forecast version. -
PlanLinesDFF: array
Plan Lines Descriptive Flexfields
Title:
Plan Lines Descriptive Flexfields
The Plan Lines Descriptive Flexfields resource is used to capture and view additional information for planning amounts in project forecasts. -
PlanningAmountDetails: array
Planning Amount Details
Title:
Planning Amount Details
The Planning Amount Details resource is used to view project forecast resource assignment periodic amounts.
array
Plan Lines Descriptive Flexfields
array
Planning Amount Details
object
-
__FLEX_Context: string
Title:
Context Segment
Maximum Length:30
Code that identifies the context for the segments of the plan lines flexfields. -
__FLEX_Context_DisplayValue: string
Title:
Context Segment
Name of the context for the segments of the plan lines flexfields. -
PlanLineId: integer
(int64)
Identifier of the summary level planning amounts for a plan line in the project forecast.
object
-
EACBurdenedCost: number
Title:
Burdened Cost: EAC
Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACQuantity: number
Title:
Quantity: EAC
Measure of the effort planned for in the forecast version resource assignment. -
EACRawCost: number
Title:
Raw Cost: EAC
Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed. -
EACRevenue: number
Title:
Revenue
Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task. -
EffectiveETCBurdenedCostRate: number
Title:
Burdened Cost: Effective Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. -
EffectiveETCRawCostRate: number
Title:
Raw Cost: Effective Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. -
EffectiveETCRevenueRate: number
Title:
Effective Revenue Rate
Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue. -
ManualSpreadFlag: boolean
Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. -
PeriodName: string
Title:
Period
Maximum Length:30
Period for which the periodic forecast amount is entered. -
PlanLineDetailId: integer
(int64)
Identifier of the periodic level planning amounts for a resource assignment in the forecast version.
Response
- application/json
Default Response
-
Metadata-Context:
If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
-
REST-Framework-Version:
The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
object
-
ActualBurdenedCostInProjectCurrency: number
Title:
Actual Burdened Cost in Project Currency
Read Only:true
The actual burdened cost incurred by the project in the project currency. -
ActualRawCostInProjectCurrency: number
Title:
Actual Raw Cost in Project Currency
Read Only:true
The actual raw cost incurred by the project in the project currency. -
ActualRevenueInProjectCurrency: number
Title:
Actual Revenue in Project Currency
Read Only:true
The actual revenue generated by the project in the project currency. -
AdjustmentPercentage: number
Title:
Adjustment Percentage
Percentage by which to adjust the forecast version amounts when copying amounts from another source. -
AdministrativeCode: string
Title:
Administrative Code
Identifies the action that an administrator can perform on the forecast version based on specific requirements. Not to be used in typical implementations. -
Attachments: array
Project Forecast Attachments
Title:
Project Forecast Attachments
The attachments resource is used to view, create, update and delete attachments for project forecasts. -
BurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency
Read Only:true
The estimated burdened cost for the project at the completion of the project in the project currency. -
BurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency
Read Only:true
The estimated burdened cost for the project at the completion of the project in the project ledger currency. -
CurrentBaselineBudgetMarginVariance: number
Title:
Current Baseline Budget Margin Variance
Read Only:true
Variance between the margins of the forecast version and the current baseline budget version. -
CurrentBaselineBudgetMarginVariancePercentage: number
Title:
Current Baseline Budget Margin Variance Percentage
Read Only:true
Variance between the margins of the forecast version and the current baseline budget version, expressed as a percentage. -
CurrentForecastMarginVariance: number
Title:
Current Forecast Margin Variance
Read Only:true
Variance between the margins of the forecast version and the current forecast version. -
CurrentForecastMarginVariancePercentage: number
Title:
Current Forecast Margin Variance Percentage
Read Only:true
Variance between the margins of the forecast version and the current forecast version, expressed as a percentage. -
DeferFinancialPlanCreation: string
Title:
Defer Financial Plan Creation
Default Value:Y
Indicates that the forecast version will be created in a deferred mode. The default value is Y. A value of Y means that the forecast version will be created in a deferred mode by the Process Financial Plan Versions process. A value of N means that the forecast version will be created in real time and will be included in the response of the POST operation. -
EACEquipmentEffort: number
Title:
EAC Equipment Effort
Read Only:true
Estimated equipment effort for the project at the completion of the project. EAC equipment effort includes both billable and nonbillable estimated equipment effort at the completion of the project. -
EACLaborEffort: number
Title:
EAC Labor Effort
Read Only:true
Estimated labor effort for the project at the completion of the project. EAC labor effort includes both billable and nonbillable estimated labor effort at the completion of the project. -
ETCBurdenedCostInProjectCurrency: number
Title:
ETC Burdened Cost in Project Currency
Read Only:true
The estimated burdened cost required to complete the project in the project currency. -
ETCRawCostInProjectCurrency: number
Title:
ETC Raw Cost in Project Currency
Read Only:true
The estimated raw cost required to complete the project in the project currency. -
ETCStartDate: string
(date)
Title:
ETC Start Date
Read Only:true
Date when the estimate to complete is intended to begin as planned on the forecast line. -
FinancialPlanType: string
Title:
Financial Plan Type
Maximum Length:240
Name of the financial plan type used to create the forecast version. -
ForecastCreationMethod: string
Title:
Forecast Creation Method
Determines whether the forecast version is generated from another plan or copied from another forecast version. A list of valid values - Copy from another source and Generate from another source - is defined in the lookup type PJO_FORECAST_CREATION_METHOD. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Creation Method Code but not both while creating a forecast version. -
ForecastCreationMethodCode: string
Title:
Forecast Creation Method Code
Determines whether the forecast version is generated from another plan or copied from another forecast version. A list of valid values - COPY and GENERATE - is defined in the lookup type PJO_FORECAST_CREATION_METHOD. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Creation Method but not both while creating a forecast version. -
ForecastGenerationSource: string
Title:
Forecast Generation Source
Determines whether the forecast version is generated from an existing forecast version based on a financial plan type or from the project plan. A list of valid values - Financial plan type and Project plan type - is defined in the lookup type PJO_PLAN_TYPE_CODE. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Generation Source Code but not both while creating a forecast version. -
ForecastGenerationSourceCode: string
Title:
Forecast Generation Source Code
Determines whether the forecast version is generated from an existing forecast version based on a financial plan type or from the project plan. A list of valid values - FINANCIAL_PLAN and PROJECT_PLAN - is defined in the lookup type PJO_PLAN_TYPE_CODE. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Generation Source but not both while creating a forecast version. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
LockedBy: string
Title:
Locked By
Read Only:true
Maximum Length:255
Name of the user who has locked the project forecast version. -
LockedFlag: boolean
Title:
Locked
Indicates if the project forecast version is locked. A value of true means that the forecast version is locked and can't be edited. A value of false means that the forecast version is not locked and can be edited. The default value while creating a project forecast version is false. -
Margin: number
Title:
Margin
Read Only:true
The difference between project-related costs and revenue amounts. -
MarginPercentage: number
Title:
Margin Percentage
Read Only:true
The difference between project-related costs and revenue amounts, expressed as a percentage. -
OriginalBaselineBudgetMarginVariance: number
Title:
Original Baseline Budget Margin Variance
Read Only:true
Variance between the margins of the forecast version and the original baseline budget version. -
OriginalBaselineBudgetMarginVariancePercentage: number
Title:
Original Baseline Budget Margin Variance Percentage
Read Only:true
Variance between the margins of the forecast version and the original baseline budget version, expressed as a percentage. -
PlanningAmounts: string
Title:
Planning Amounts
Maximum Length:30
Indicates whether a forecast version includes cost amounts, revenue amounts, or both. A list of valid values - Cost, Revenue, and Cost and revenue - is defined in the lookup type PJO_PLANNED_FOR_CODE. There is no default value while creating a forecast version. You must enter either this attribute or Forecast Generation Source but not both while creating a forecast version. -
PlanningOptionId: integer
(int64)
Title:
Planning Option ID
Read Only:true
Identifier of the summary level planning option in the project forecast. -
PlanningOptions: array
Planning Options
Title:
Planning Options
The Planning Options resource is used to view the planning options configured for the project forecast version. -
PlanningResources: array
Planning Resources
Title:
Planning Resources
The Planning Resources resource is used to view project forecast resource assignments. -
PlanVersionDescription: string
Title:
Plan Version Description
Maximum Length:2000
Description of the forecast version. -
PlanVersionId: integer
(int64)
Title:
Forecast Version ID
Identifier of the forecast version. -
PlanVersionName: string
Title:
Plan Version Name
Maximum Length:225
Name of the forecast version. -
PlanVersionNumber: integer
(int64)
Title:
Plan Version Number
Read Only:true
The number of the version of the forecast. -
PlanVersionStatus: string
Title:
Plan Version Status
The status of the forecast version. A list of valid values is defined in the lookup type PJO_PLAN_STATUS. -
PreviousForecastMarginVariance: number
Title:
Previous Forecast Margin Variance
Read Only:true
Variance between the margins of the forecast version and the previous forecast version. -
PreviousForecastMarginVariancePercentage: number
Title:
Previous Forecast Margin Variance Percentage
Read Only:true
Variance between the margins of the forecast version and the previous forecast version, expressed as a percentage. -
ProjectId: integer
(int64)
Title:
Project ID
Identifier of the project for which the forecast version is created. You must enter a value for only one from among this attribute, Project Number, and Project Name but not for all three or a combination of them while creating a forecast version. -
ProjectName: string
Title:
Project Name
Maximum Length:240
Name of the project for which the forecast version is created. You must enter a value for only one from among this attribute, Project ID, and Project Number but not for all three or a combination of them while creating a forecast version. -
ProjectNumber: string
Title:
Project Number
Maximum Length:25
Number of the project for which the forecast version is created. You must enter a value for only one from among this attribute, Project ID, and Project Name but not for all three or a combination of them while creating a forecast version. -
ProjectResourcesStatus: string
Title:
Project Resources Status
Status of the project resources to be used for generation. Valid values are: All and Confirmed. -
RawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency
Read Only:true
The estimated raw cost for the project at the completion of the project in the project currency. -
RawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency
Read Only:true
The estimated raw cost for the project at the completion of the project in the project ledger currency. -
RbsVersionId: integer
(int64)
Title:
Resource Breakdown Structure Version ID
Read Only:true
Identifier of the resource breakdown structure that is attached to the project for which you can view summarized data. -
RevenueInProjectCurrency: number
Title:
Revenue in Project Currency
Read Only:true
The estimated revenue for the project at the completion of the project in the project currency. -
RevenueInProjectLedgerCurrency: number
Title:
Revenue in Project Ledger Currency
Read Only:true
The estimated revenue for the project at the completion of the project in the project ledger currency. -
SourcePlanType: string
Title:
Source Plan Type
Indicates the financial plan type or the project plan from which the forecast version is created. If the forecast generation source is entered as Project plan type, then this attribute is defaulted as project plan by the application. If the forecast generation source is entered as Financial plan type, then you must enter a value for this attribute. -
SourcePlanVersionId: integer
Title:
Source Plan Version ID
Identifier of the version of the project plan, budget, or forecast used as the source for creating the forecast version. -
SourcePlanVersionName: string
Title:
Source Plan Version Name
The name of the version of the project plan, budget, or forecast used as the source for creating the forecast version. -
SourcePlanVersionNumber: integer
Title:
Source Plan Version Number
The number of the version of the project plan, budget, or forecast used as the source for creating the forecast version. -
SourcePlanVersionStatus: string
Title:
Source Plan Version Status
The status of the source plan version from which the forecast version is created. A list of valid values is defined in the lookup type PJO_PLAN_STATUS. -
TotalCommitmentsInProjectCurrency: number
Title:
Total Commitments in Project Currency
Read Only:true
The total commitments incurred by the project in the project currency. -
VersionErrors: array
Errors
Title:
Errors
The Errors resource is used to view the errors in project forecasts.
array
Project Forecast Attachments
array
Links
array
Planning Options
array
Planning Resources
array
Errors
object
-
AsyncTrackerId: string
Title:
Asynchronous Upload Tracker Id
Attribute provided for the exclusive use by the Attachment UI components to assist in uploading files. -
AttachedDocumentId: integer
(int64)
Title:
Attached Document Id
The unique identifier of the attached document. -
CategoryName: string
Title:
Category
Maximum Length:30
The category of the attachment. - ContentRepositoryFileShared: boolean
-
CreatedBy: string
Title:
Created By
Read Only:true
Maximum Length:255
The user who created the record. -
CreatedByUserName: string
Title:
Created By User Name
Read Only:true
The user name who created the record. -
CreationDate: string
(date-time)
Title:
Creation Date
Read Only:true
The date when the record was created. -
DatatypeCode: string
Title:
Type
Maximum Length:30
Default Value:FILE
A value that indicates the data type. -
Description: string
Title:
Description
Maximum Length:255
The description of the attachment. -
DmDocumentId: string
Maximum Length:
255
The document ID from which the attachment is created. -
DmFolderPath: string
Title:
Dm Folder Path
Maximum Length:1000
The folder path from which the attachment is created. -
DmVersionNumber: string
Maximum Length:
255
The document version number from which the attachment is created. -
DownloadInfo: string
Title:
DownloadInfo
JSON object represented as a string containing information used to programmatically retrieve a file attachment. -
ErrorStatusCode: string
Title:
Error Status Code
The error code, if any, for the attachment. -
ErrorStatusMessage: string
Title:
Error Status Message
The error message, if any, for the attachment. -
ExpirationDate: string
(date-time)
Title:
Expiration Date
The expiration date of the contents in the attachment. -
FileContents: string
(byte)
Title:
File Contents
The contents of the attachment. -
FileName: string
Title:
File Name
Maximum Length:2048
The file name of the attachment. -
FileUrl: string
Title:
File Url
The URI of the file. -
FileWebImage: string
(byte)
Title:
File Web Image
Read Only:true
The base64 encoded image of the file displayed in .png format if the source is a convertible image. -
LastUpdateDate: string
(date-time)
Title:
Last Update Date
Read Only:true
The date when the record was last updated. -
LastUpdatedBy: string
Title:
Last Updated By
Read Only:true
Maximum Length:255
The user who last updated the record. -
LastUpdatedByUserName: string
Title:
Last Updated By User
Read Only:true
The user name who last updated the record. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
PostProcessingAction: string
Title:
PostProcessingAction
The name of the action that can be performed after an attachment is uploaded. -
Title: string
Title:
Title
The title of the attachment. -
UploadedFileContentType: string
Title:
Uploaded File Content Type
The content type of the attachment. -
UploadedFileLength: integer
Title:
File Size
The size of the attachment file. -
UploadedFileName: string
Title:
Uploaded File Name
The name to assign to a new attachment file. -
UploadedText: string
Title:
Uploaded Text
The text content for a new text attachment. -
Uri: string
Title:
Uri
Maximum Length:4000
The URI of a Topology Manager type attachment. -
Url: string
Title:
Url
Maximum Length:4000
The URL of a web page type attachment. -
UserName: string
Title:
User Name
Read Only:true
Maximum Length:255
The login credentials of the user who created the attachment.
array
Links
object
-
href: string
Title:
hyperlink reference
The URI to the related resource. -
kind: string
Title:
kind
Allowed Values:[ "collection", "item", "describe", "other" ]
The kind of the related resource. -
name: string
Title:
name
The name of the link to the related resource. -
properties: object
properties
-
rel: string
Title:
relation
Allowed Values:[ "self", "lov", "parent", "canonical", "child", "enclosure", "action", "custom" ]
The name of the relation to the resource instance. Example: self.
object
-
changeIndicator: string
Change indicator or the ETag value of the resource instance.
object
-
ActualAmountsThroughPeriod: string
Title:
Actual Amounts Through Period
Maximum Length:255
The period (current, prior, or last closed) through which actual amounts are used when generating forecast amounts. -
AllowNegativeETCCalculationFlag: boolean
Title:
Allow Negative ETC Calculation
Indicates whether negative estimate-to-complete quantity can be calculated in progress. If the check box isn't enabled, and the calculated value is negative, then the estimate-to-complete quantity is set to zero. -
AmountScale: string
Title:
Amount Scale
Maximum Length:255
The scale on which amounts are displayed on the user interface. For example, if you select to view amounts in 1000s, the $100,000,000 amount is displayed as 100,000. -
AmountTypes: array
Amount Types
Title:
Amount Types
The Amount Type resource is used to select the cost and revenue items to include in a financial plan type. -
AssignTaskResourceInSingleCurrencyFlag: boolean
Title:
Assign Resource in Single Currency for a Task
Indicates whether a forecast line is enabled for assigning resources in a single currency for a task. -
AssociateProjectCostsOrRevenueToSummaryTasksFlag: boolean
Title:
Associate project costs or revenue to summary tasks
Maximum Length:255
Indicates whether the incurred costs or revenue for resources are associated on the task hierarchy at the level planned. -
BillRateDerivationDate: string
(date-time)
Title:
Bill Rate Derivation Date
The date that is used as the basis for deriving rates for calculating revenue amounts. -
BillRateDerivationDateType: string
Title:
Bill Rate Derivation Date Type
Maximum Length:255
The date type, for example, the system date or a fixed date that is used as the basis for deriving rates for calculating revenue amounts. -
BurdenScheduleCostOptions: string
Title:
Burden Schedule
Maximum Length:255
A set of burden multipliers that is maintained for use across projects. Also referred to as a standard burden schedule. -
CalendarType: string
Title:
Calendar Type
Maximum Length:255
The type of calendar, such as accounting calendar or project accounting calendar, used for entering and displaying periodic financial information. -
CarryForwardUnusedAmountsFromPastPeriodsFlag: boolean
Title:
Carry Forward Unused Amounts from Past Periods
Indicates whether unused forecast amounts can be carried over from the current or closed periods to the next open period. -
CostDateTypeForConversionInPC: string
Title:
Project Currency Conversion: Cost Date Type
Maximum Length:255
Date type that is used as a cost conversion attribute for project currency. -
CostDateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Cost Date Type
Maximum Length:255
Date type that is used as a cost conversion attribute for project ledger currency. -
CostFixedDateForConversionInPC: string
(date-time)
Title:
Project Currency Conversion: Cost Fixed Date
Date that's used as a cost conversion attribute for project currency. -
CostFixedDateForConversionInPLC: string
(date-time)
Title:
Project Ledger Currency Conversion: Cost Fixed Date
Date that's used as a cost conversion attribute for project ledger currency. -
CostRateDerivationDate: string
(date-time)
Title:
Cost Rate Derivation Date
The date that is used as the basis for deriving rates for calculating cost amounts. -
CostRateDerivationDateType: string
Title:
Cost Rate Derivation Date Type
Maximum Length:255
The date type, for example, the system date or a fixed date that is used as the basis for deriving rates for calculating cost amounts. -
CostRateTypeForConversionInPC: string
Title:
Project Currency Conversion: Cost Rate Type
Maximum Length:255
Cost rate type that is used as a cost conversion attribute for project currency. -
CostRateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Cost Rate Type
Maximum Length:255
Cost rate type that is used as a cost conversion attribute for project ledger currency. -
CurrencyType: string
Title:
Currency Type
Maximum Length:255
Indicates whether the project currency or the project ledger currency is used for displaying amounts when reviewing forecast amounts. -
CurrentPlanningPeriod: string
Title:
Current Planning Period
Maximum Length:15
Current planning period that drives the display of the periodic information. It can be the project accounting period or accounting period depending on the selected calendar type. This value is not applicable when the calendar type is set to NONE. -
DateTypeForCostConversion: string
Title:
Date Type for Cost Conversion
Maximum Length:255
Date type that is used as a cost conversion attribute for planning currencies. -
DateTypeForRevenueConversion: string
Title:
Date Type for Revenue Conversion
Read Only:true
Maximum Length:255
Date type that is used as a revenue conversion attribute for planning currencies. -
DefaultReportingOption: string
Title:
Default Reporting Option
Read Only:true
Maximum Length:255
Indicates whether cost or revenue quantity is used for reporting quantity when planning for cost and revenue in a separate forecast version. By default, it is set to Cost when planning amounts are cost only or cost and revenue together. When the planning amounts are revenue only, it is set to Revenue. -
DesignateAsPrimaryCostForecastFlag: boolean
Title:
Designate as Primary Cost Forecast
Read Only:true
Indicates whether the financial plan type is the primary cost forecast. -
DesignateAsPrimaryRevenueForecastFlag: boolean
Title:
Designate as Primary Revenue Forecast
Read Only:true
Indicates whether the financial plan type is the primary revenue forecast. -
ETCGenerationSource: string
Title:
ETC Generation Source
Maximum Length:255
Specifies whether the estimate-to-complete source for generating a forecast version is the financial project plan, another financial plan, or project resources. -
ExportOptions: array
Export Options
Title:
Export Options
The Export Option resource is used to select the planning options attributes to export. -
FixedDateForCostConversion: string
(date-time)
Title:
Fixed Date for Cost Conversion
The date that is used to derive rates for calculating planned costs for planning currencies. -
FixedDateForRevenueConversion: string
(date-time)
Title:
Fixed Date for Revenue Conversion
The date that is used to derive rates for calculating planned revenue for planning currencies. -
ForecastETCMethod: string
Title:
Forecast ETC Method
Maximum Length:255
Method used to calculate estimate-to-complete values in project forecast. -
JobCostOptions: string
Title:
Job Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for jobs. -
JobRevenueOptions: string
Title:
Job Revenue Options
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for jobs. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
MaintainManualSpreadOnDateChanges: string
Title:
Maintain manual spread on date changes
Maximum Length:1
Indicates whether the periodic planning is retained in the plan version on plan line date modifications. A value of Y indicates that the attribute is selected. A value of N means that the attribute is not selected. -
MultipleTransactionCurrencies: string
Title:
Multiple Transaction Currencies
Maximum Length:255
Indicates that the plan can use multiple transaction currencies. A value of Y indicates that the attribute is selected. A value of N means that the attribute is not selected. -
NonlaborResourceCostOptions: string
Title:
Nonlabor Resource
Maximum Length:255
Rate schedule used for the calculation of cost amounts for non-labor resources. -
NonlaborResourceRevenueOptions: string
Title:
Nonlabor Resource
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for non-labor resources. -
OpenCommitments: string
Title:
Open Commitments
Maximum Length:1
Indicates whether project costs from commitments are included when generating budgets or forecasts. -
PeriodProfile: string
Title:
Period Profile
Maximum Length:255
Defines how time periods are grouped and displayed when editing forecast versions. -
PersonCostOptions: string
Title:
Person Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for named persons. -
PersonRevenueOptions: string
Title:
Person Revenue Options
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for named persons. -
PlanningCurrencies: array
Planning Currencies
Title:
Planning Currencies
The Planning Currency resource is used to view, create, update, and delete project and planning currencies. -
PlanningLevel: string
Title:
Planning Level
Maximum Length:255
Level of the forecast at which amounts can be entered. -
PlanningOptionId: integer
(int64)
Identifier of the summary level planning option in the project forecast version.
-
PlanningOptionsDFF: array
Planning Options Descriptive Flexfields
Title:
Planning Options Descriptive Flexfields
The Planning Options Descriptive Flexfields resource is used to capture, view, and update additional information for planning options in project forecast versions. -
PlanningResourceBreakdownStructure: string
Title:
Planning Resource Breakdown Structure
Maximum Length:255
Planning resource breakdown structure associated with the project. -
ProjectCurrency: string
Title:
Project Currency
Read Only:true
Maximum Length:15
Currency for the project. -
ProjectLedgerCurrency: string
Title:
Project Ledger Currency
Read Only:true
Maximum Length:15
Project ledger currency for the project. -
ProjectRoleCostOptions: string
Title:
Project Role Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for project role. -
ProjectRoleRevenueOptions: string
Title:
Project Role Revenue Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for project role. -
RateDerivationDate: string
(date-time)
Title:
Rate Derivation Date
The date that's used as the basis for deriving rates for calculating amounts on a None time phased forecast version. -
RateDerivationDateType: string
Title:
Rate Derivation Date Type
Maximum Length:255
The date type, for example, the system date or a fixed date that's used as the basis for deriving rates for calculating amounts on a None time phased forecast version. -
RateTypeForCostConversion: string
Title:
Rate Type for Cost Conversion
Maximum Length:255
Cost rate type that is used as a cost conversion attribute for planning currencies. -
RateTypeForRevenueConversion: string
Title:
Rate Type for Revenue Conversion
Read Only:true
Maximum Length:255
Revenue rate type that is used as a revenue conversion attribute for planning currencies. -
ReportCost: string
Title:
Report Cost
Maximum Length:255
Determines the cost amount types that are used to calculate and report margins on forecasts. -
ResourceClassCostOptions: string
Title:
Resource Class Cost Options
Maximum Length:255
Rate schedule used for the calculation of cost amounts for resource classes. This is used for cost calculation when rates are unavailable in rate schedules for named persons, jobs, or non-labor resources. -
ResourceClassRevenueOptions: string
Title:
Resource Class Revenue Options
Maximum Length:255
Rate schedule used for the calculation of revenue amounts for resource classes. This is used for revenue calculation when rates are unavailable in rate schedules for named persons, jobs, or non-labor resources. -
RetainManuallyAddedForecastLinesFlag: boolean
Title:
Retain manually added forecast lines
Indicates whether manually added plans lines are retained when the forecast version is regenerated. -
RetainOverrideRatesFromSourceFlag: boolean
Indicates whether user specified cost and revenue rates from the source must be retained when generating the target budget or forecast version.
-
RetainSpreadFromSourceFlag: boolean
Title:
Retain Spread from Source
Indicates whether the periodic planning from the source is retained in the generated forecast version. -
RevenueDateTypeForConversionInPC: string
Title:
Project Currency Conversion: Revenue Date Type
Maximum Length:255
Date type that is used as a revenue conversion attribute for project currency. -
RevenueDateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Revenue Date Type
Maximum Length:255
Date type that is used as a revenue conversion attribute for project ledger currency. -
RevenueFixedDateForConversionInPC: string
(date-time)
Title:
Project Currency Conversion: Revenue Fixed Date
Date that's used as a revenue conversion attribute for project currency. -
RevenueFixedDateForConversionInPLC: string
(date-time)
Title:
Project Ledger Currency Conversion: Revenue Fixed Date
Date that's used as a revenue conversion attribute for project ledger currency. -
RevenueGenerationMethod: string
Title:
Revenue Generation Method
Maximum Length:255
Determines whether forecast revenue is calculated based on quantity and rates, event amounts, or the spread ratio specified for tasks. -
RevenueRateTypeForConversionInPC: string
Title:
Project Currency Conversion: Revenue Rate Type
Maximum Length:255
Revenue rate type that is used as a revenue conversion attribute for project currency. -
RevenueRateTypeForConversionInPLC: string
Title:
Project Ledger Currency Conversion: Revenue Rate Type
Maximum Length:255
Revenue rate type that is used as a revenue conversion attribute for project ledger currency. -
UsePlanningRatesFlag: boolean
Title:
Use Planning Rates
Enables utilization of planning rates for resources and resource classes when calculating forecast amounts. -
UseSameConversionAttributeForAllCurrencyConversionsFlag: boolean
Title:
Use Same Conversion Attribute for All Currency Conversions
Indicates whether you can use the same currency conversion attribute for all currencies.
array
Amount Types
array
Export Options
array
Links
array
Planning Currencies
array
Planning Options Descriptive Flexfields
object
-
AmountTypeId: integer
(int64)
Title:
Amount Type ID
Identifier of the project forecast version amount types. -
BillRateFlag: boolean
Title:
Bill rate
Indicates whether the revenue rate is editable. -
BurdenedCostFlag: boolean
Title:
Burdened Cost
Indicates whether the burdened cost amounts for a forecast version are editable. -
BurdenedCostRateFlag: boolean
Title:
Burdened Cost Rate
Indicates whether the burdened cost rate is editable. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
QuantityFlag: boolean
Title:
Quantity
Maximum Length:255
Indicates whether the quantity is editable on a budget or forecast version. -
RawCostFlag: boolean
Title:
Raw Cost
Indicates whether the raw cost amounts for a forecast version are editable. -
RawCostRateFlag: boolean
Title:
Raw Cost Rate
Indicates whether the raw cost rate is editable. -
RevenueFlag: boolean
Title:
Revenue
Indicates whether the revenue for a forecast version is editable.
array
Links
object
-
ActualBurdenedCostAmounts: string
Title:
Burdened Cost: Actual Amounts
Maximum Length:1
Actual burdened cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualBurdenedCostInPC: string
Title:
Burdened Cost in Project Currency: Actual Amounts
Maximum Length:1
Actual burdened costs incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualBurdenedCostInPLC: string
Title:
Burdened Cost in Project Ledger Currency: Actual Amounts
Maximum Length:1
Actual burdened costs incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualMargin: string
Title:
Margin: Actual Amounts
Maximum Length:1
Difference between actual project-related costs and actual revenue amounts. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualMarginInPC: string
Title:
Margin in Project Currency: Actual Amounts
Maximum Length:1
Difference between actual project-related costs and actual revenue amounts calculated using project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualMarginInPLC: string
Title:
Margin in Project Ledger Currency: Actual Amounts
Maximum Length:1
Difference between actual project-related costs and actual revenue amounts calculated using project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualQuantity: string
Title:
Quantity: Actual Amounts
Maximum Length:1
Actual quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRawCostAmounts: string
Title:
Raw Cost: Actual Amounts
Maximum Length:1
Actual cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRawCostInPC: string
Title:
Raw Cost in Project Currency: Actual Amounts
Maximum Length:1
Actual cost amounts incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRawCostInPLC: string
Title:
Raw Cost in Project Ledger Currency: Actual Amounts
Maximum Length:1
Actual cost amounts incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRevenueAmounts: string
Title:
Revenue: Actual Amounts
Maximum Length:1
Actual revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRevenueInPC: string
Title:
Revenue in Project Currency: Actual Amounts
Maximum Length:1
Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ActualRevenueInPLC: string
Title:
Revenue in Project Ledger Currency: Actual Amounts
Maximum Length:1
Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostEffectiveMultiplier: string
Title:
Burdened Cost: Effective Multiplier
Maximum Length:1
Multiplier used to calculate the burdened costs. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostInvoiceCommitments: string
Title:
Burdened Cost Commitments: Supplier Invoices
Maximum Length:1
Costs for supplier invoices billed against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostInvoiceCommitmentsInPC: string
Title:
Burdened Cost Commitments in Project Currency: Supplier Invoices
Maximum Length:1
Burdened costs for supplier invoices billed against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostInvoiceCommitmentsInPLC: string
Title:
Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
Maximum Length:1
Burdened costs for supplier invoices billed against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPOCommitments: string
Title:
Burdened Cost Commitments: Purchase Orders
Maximum Length:1
Burdened costs for purchase orders against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPOCommitmentsInPC: string
Title:
Burdened Cost Commitments in Project Currency: Purchase Orders
Maximum Length:1
Burdened costs for purchase orders against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPOCommitmentsInPLC: string
Title:
Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
Maximum Length:1
Burdened costs for purchase orders against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPRCommitments: string
Title:
Burdened Cost Commitments: Requisitions
Maximum Length:1
Burdened costs for outstanding purchase requisitions against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPRCommitmentsInPC: string
Title:
Burdened Cost Commitments in Project Currency: Requisitions
Maximum Length:1
Burdened costs for outstanding purchase requisitions against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostPRInCommitmentsPLC: string
Title:
Burdened Cost Commitments in Project Ledger Currency: Requisitions
Maximum Length:1
Burdened costs for outstanding purchase requisitions against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostStandardMultiplier: string
Title:
Burdened Cost: Standard Multiplier
Maximum Length:1
Standard multiplier derived from the burden schedule for calculating burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
BurdenedCostStandardRate: string
Title:
Burdened Cost: Standard Rate
Maximum Length:1
Standard rate derived from the rate schedule for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
DisplayCommitmentsFlag: boolean
Title:
Display Commitments
Indicates whether to display the external commitments present in the budget or forecast plan lines. -
DisplayRatesAndAmountsInMultipleTransactionCurrenciesFlag: boolean
Title:
Display currency conversion attributes and amounts in multiple transaction currencies
Indicates whether to display the currency conversion attributes and amounts in multiple transaction currencies if the plan type allows planning in multiple transaction currencies. -
EACBurdenedCost: string
Title:
Burdened Cost: EAC
Maximum Length:1
Estimate of burdened cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACBurdenedCostInPC: string
Title:
Burdened Cost in Project Currency: EAC
Maximum Length:1
Estimate of burdened costs incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACBurdenedCostInPLC: string
Title:
Burdened Cost in Project Ledger Currency: EAC
Maximum Length:1
Estimate of burdened costs incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMargin: string
Title:
Margin: EAC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMarginInPC: string
Title:
Margin in Project Currency: EAC
Maximum Length:1
Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMarginInPLC: string
Title:
Margin in Project Ledger Currency: EAC
Maximum Length:1
Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACMarginPercentage: string
Title:
Margin Percentage: EAC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACQuantity: string
Title:
Quantity: EAC
Maximum Length:1
Estimate-at-completion quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRawCost: string
Title:
Raw Cost: EAC
Maximum Length:1
Estimate of cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRawCostInPC: string
Title:
Raw Cost in Project Currency: EAC
Maximum Length:1
Estimate of cost amounts incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRawCostInPLC: string
Title:
Raw Cost in Project Ledger Currency: EAC
Maximum Length:1
Estimate of cost amounts incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRevenue: string
Title:
Revenue: EAC
Maximum Length:201
Estimate-at-completion revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRevenueInPC: string
Title:
Revenue in Project Currency: EAC
Maximum Length:1
Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EACRevenueInPLC: string
Title:
Revenue in Project Ledger Currency: EAC
Maximum Length:1
Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EffectiveBurdenedCostRate: string
Title:
Burdened Cost: Effective Rate
Maximum Length:1
User entered rate for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EffectiveRawCostRate: string
Title:
Raw Cost: Effective Rate
Maximum Length:1
User entered rate for calculating the raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
EffectiveRevenueRate: string
Title:
Effective Revenue Rate
Maximum Length:1
User entered rate for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCBurdenedCost: string
Title:
Burdened Cost: ETC
Maximum Length:1
Estimate of burdened cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCBurdenedCostInPC: string
Title:
Burdened Cost in Project Currency: ETC
Maximum Length:1
Estimate of burdened costs to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCBurdenedCostInPLC: string
Title:
Burdened Cost in Project Ledger Currency: ETC
Maximum Length:1
Estimate of burdened costs to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMargin: string
Title:
Margin: ETC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMarginInPC: string
Title:
Margin in Project Currency: ETC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMarginInPLC: string
Maximum Length:
1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCMarginPercentage: string
Title:
Margin Percentage: ETC
Maximum Length:1
Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCQuantity: string
Title:
Quantity: ETC
Maximum Length:1
Estimate-to-complete quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRawCost: string
Title:
Raw Cost: ETC
Maximum Length:1
Estimate of cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRawCostInPC: string
Title:
Raw Cost in Project Currency: ETC
Maximum Length:1
Estimate of cost amounts to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRawCostInPLC: string
Title:
Raw Cost in Project Ledger Currency: ETC
Maximum Length:1
Estimate of cost amounts to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRevenue: string
Title:
ETC Revenue
Maximum Length:1
Estimate-to-complete revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRevenueInPC: string
Title:
Revenue in Project Currency: ETC
Maximum Length:1
Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ETCRevenueInPLC: string
Title:
Revenue in Project Ledger Currency: ETC
Maximum Length:1
Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ExportOptionId: integer
Title:
Export Options ID
Identifier of the project forecast version export options. -
FromDate: string
Title:
From Date
Maximum Length:1
From date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
PlanningCurrency: string
Title:
Planning Currency
Read Only:true
Maximum Length:1
Currency used for planning in the forecast line. This value is always set to true and the attribute is exported. -
PlanningResource: string
Title:
Planning Resource
Read Only:true
Maximum Length:1
Resource used for financial planning in the forecast line. This value is always set to true and the attribute is exported. -
ProjectCurrencyConversionCostDate: string
Title:
Project Currency Conversion: Cost Date
Maximum Length:1
Date that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionCostDateType: string
Title:
Project Currency Conversion: Cost Date Type
Maximum Length:1
Date type that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionCostRate: string
Title:
Project Currency Conversion: Cost Rate
Maximum Length:1
Cost rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionCostRateType: string
Title:
Project Currency Conversion: Cost Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueDate: string
Title:
Project Currency Conversion: Revenue Date
Maximum Length:1
Date that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueDateType: string
Title:
Project Currency Conversion: Revenue Date Type
Maximum Length:1
Date type that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueRate: string
Title:
Project Currency Conversion: Revenue Rate
Maximum Length:1
Revenue rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectCurrencyConversionRevenueRateType: string
Title:
Project Currency Conversion: Revenue Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostDate: string
Title:
Project Ledger Currency Conversion: Cost Date
Maximum Length:1
Date that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostDateType: string
Title:
Project Ledger Currency Conversion: Cost Date Type
Maximum Length:1
Date type that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostRate: string
Title:
Project Ledger Currency Conversion: Cost Rate
Maximum Length:1
Cost rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionCostRateType: string
Title:
Project Ledger Currency Conversion: Cost Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueDate: string
Title:
Project Ledger Currency Conversion: Revenue Date
Maximum Length:1
Date that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueDateType: string
Title:
Project Ledger Currency Conversion: Revenue Date Type
Maximum Length:1
Date type that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueRate: string
Title:
Project Ledger Currency Conversion: Revenue Rate
Maximum Length:1
Revenue rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ProjectLedgerCurrencyConversionRevenueRateType: string
Title:
Project Ledger Currency Conversion: Revenue Rate Type
Maximum Length:1
The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
QuantityInvoiceCommitments: string
Title:
Quantity Commitments: Supplier Invoices
Maximum Length:1
Planned quantity of supplier invoice commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
QuantityPOCommitments: string
Title:
Quantity Commitments: Purchase Orders
Maximum Length:1
Planned quantity of purchase order commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
QuantityPRCommitments: string
Title:
Quantity Commitments: Requisitions
Maximum Length:1
Planned quantity of purchase requisition commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostInvoiceCommitments: string
Title:
Raw Cost Commitments: Supplier Invoices
Maximum Length:1
Costs from supplier invoices that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostInvoiceCommitmentsInPC: string
Title:
Raw Cost Commitments in Project Currency: Supplier Invoices
Maximum Length:1
Costs from supplier invoices that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostInvoiceCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
Maximum Length:1
Costs from supplier invoices that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPOCommitments: string
Title:
Raw Cost Commitments: Purchase Orders
Maximum Length:1
Purchase order costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPOCommitmentsInPC: string
Title:
Raw Cost Commitments in Project Currency: Purchase Orders
Maximum Length:1
Purchase order costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPOCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Ledger Currency: Purchase Orders
Maximum Length:1
Purchase order costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPRCommitments: string
Title:
Raw Cost Commitments: Requisitions
Maximum Length:1
Purchase requisition costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPRCommitmentsInPC: string
Title:
Raw Cost Commitments in Project Currency: Requisitions
Maximum Length:1
Purchase requisition costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
RawCostPRCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Ledger Currency: Requisitions
Maximum Length:1
Purchase requisition costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
ResourceClass: string
Title:
Resource Class
Read Only:true
Maximum Length:1
Resource class associated with the forecast line. This value is always set to true and the attribute is exported. -
SpreadCurve: string
Title:
Spread Curve
Read Only:true
Maximum Length:1
Spread curve associated with the forecast line. This value is always set to true and the attribute is exported. -
StandardRawCostRate: string
Title:
Raw Cost: Standard Rate
Maximum Length:1
Rate derived from the rate schedule for calculating raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
StandardRevenueRate: string
Title:
Revenue: Standard Rate
Maximum Length:1
Rate derived from the rate schedule for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TaskName: string
Title:
Task Name
Read Only:true
Maximum Length:1
Name assigned to a task. This value is always set to true and the attribute is exported. -
TaskNumber: string
Title:
Task Number
Read Only:true
Maximum Length:1
Number of the task. This value is always set to true and the attribute is exported. -
ToDate: string
Title:
To Date
Maximum Length:1
End date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalBurdenedCostCommitments: string
Title:
Burdened Cost: Total Commitments
Maximum Length:1
Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalBurdenedCostCommitmentsInPC: string
Title:
Burdened Cost in Project Currency: Total Commitments
Maximum Length:1
Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalBurdenedCostCommitmentsInPLC: string
Title:
Burdened Cost in Project Ledger Currency: Total Commitments
Maximum Length:1
Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalQuantityCommitments: string
Title:
Quantity: Total Commitments
Maximum Length:1
Total commitments quantity required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalRawCostCommitments: string
Title:
Raw Cost: Total Commitments
Maximum Length:1
Total commitments incurred by the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalRawCostCommitmentsInPC: string
Title:
Raw Cost in Project Currency: Total Commitments
Maximum Length:1
Total commitments incurred by the project in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
TotalRawCostCommitmentsInPLC: string
Title:
Raw Cost Commitments in Project Currency: Total Commitments
Maximum Length:1
Total commitments incurred by the project in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. -
UnitOfMeasure: string
Title:
Unit of Measure
Maximum Length:1
Unit of measure for a resource. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
array
Links
object
-
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
PlanningCurrencyCode: string
Title:
Planning Currency Code
Maximum Length:15
Currency code for the planning currency. -
PlanningCurrencyId: integer
(int64)
Title:
Planning Currency ID
Identifier of the planning currency.
array
Links
object
-
__FLEX_Context: string
Title:
Context Segment
Maximum Length:30
Code that identifies the context for the segments of the planning options flexfields. -
__FLEX_Context_DisplayValue: string
Title:
Context Segment
Name of the context for the segments of the planning options flexfields. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
PlanningOptionId: integer
(int64)
Identifier of the summary level planning option in the project forecast version.
array
Links
object
-
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
MaintainManualSpreadOnDateChanges: string
Default Value:
N
Indicates whether the periodic planning is retained in the plan version on plan line date modifications. -
PlanningAmounts: array
Planning Amounts
Title:
Planning Amounts
The Planning Amounts resource is used to view project forecast resource assignment summary amounts. -
PlanningElementId: integer
(int64)
Title:
Planning Element ID
Identifier of the planning resources of the forecast version. -
PlanningEndDate: string
(date-time)
Title:
Planning Dates: To Date
The date that is planned on the financial plan for a resource to begin their assignment on a project task. -
PlanningStartDate: string
(date-time)
Title:
Planning Dates: From Date
The date that is planned on the financial plan for a resource to finish their assignment on a project task. -
RbsElementId: integer
(int64)
Title:
Planning Resource
Identifier of the resource breakdown structure element used to create the financial plan resource assignment. -
ResourceClass: string
Title:
Resource Class
Read Only:true
Maximum Length:240
Grouping of predefined resource types to which the resource in the financial plan resource assignment belongs. A list of valid values are Labor, Equipment, Material Items, and Financial Resources. -
ResourceName: string
Title:
Resource
Maximum Length:240
Name or alias of the resource included in the planning resource breakdown structure that is used to create the financial plan resource assignment. -
TaskId: integer
(int64)
Title:
Task
Identifier of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment. -
TaskName: string
Title:
Task Name
Maximum Length:255
Name of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task ID, and Task Number but not for all three or a combination of them while creating a financial plan resource assignment. -
TaskNumber: string
Title:
Task Number
Maximum Length:100
Number of the task for which a financial plan resource assignment is created. You must enter a value for only one from among this attribute, Task Name, and Task ID but not for all three or a combination of them while creating a financial plan resource assignment. -
UnitOfMeasure: string
Title:
Unit of Measure
Read Only:true
Unit of work that measures the quantity of effort for which the resource is planned for on the financial plan resource assignment.
array
Links
array
Planning Amounts
object
-
ActualBurdenedCost: number
Title:
Actual Burdened Cost
Read Only:true
Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in planning currency from the start of the project till the current date. -
ActualBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project currency from the start of the project till the current date. -
ActualBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project ledger currency from the start of the project till the current date. -
ActualBurdenedCostRate: number
Title:
Burdened Cost Rate
Read Only:true
Actual burdened cost rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs. -
ActualQuantity: number
Title:
Actual Quantity
Read Only:true
Actual effort for the forecast version resource assignment from the start of the project till the current date. -
ActualRawCost: number
Title:
Actual Raw Cost
Read Only:true
Actual cost incurred for the period in the forecast version resource assignment in planning currency that is directly attributable to the work performed from the start of the project till the current date. -
ActualRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment in project currency that is directly attributable to the work performed from the start of the project till the current date. -
ActualRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed from the start of the project till the current date. -
ActualRawCostRate: number
Read Only:
true
Rate that is used to calculate the actual cost for the forecast version resource assignment that is directly attributable to the work performed. -
ActualRevenue: number
Title:
Revenue: Actual Amount
Read Only:true
Amount of revenue recognized for the forecast version resource assignment in planning currency from the inception of the project to date. -
ActualRevenueInProjectCurrency: number
Title:
Revenue in Project Currency: Actual Amounts
Read Only:true
Amount of revenue recognized for the forecast version resource assignment in project currency from the inception of the project to date. -
ActualRevenueInProjectLedgerCurrency: number
Title:
Revenue in Project Ledger Currency: Actual Amount
Read Only:true
Amount of revenue recognized for the forecast version resource assignment in project ledger currency from the inception of the project to date. -
ActualRevenueRate: number
Title:
Actual Rate
Read Only:true
Rate that is used to calculate the actual revenue for the forecast version resource assignment. -
Currency: string
Maximum Length:
15
Code that identifies the planning currency on the forecast version resource assignment. -
EACBurdenedCost: number
Title:
Burdened Cost
Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: EAC
Read Only:true
Estimated cost in project currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: EAC
Read Only:true
Estimated cost in project ledger currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACBurdenedCostRate: number
Title:
Burdened Cost: Total Burdened Cost Rate
Read Only:true
Rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs. -
EACQuantity: number
Title:
Quantity: EAC
Measure of the effort planned for in the forecast version resource assignment. -
EACRawCost: number
Title:
Raw Cost
Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed. -
EACRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: EAC
Read Only:true
Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed. -
EACRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: EAC
Read Only:true
Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed. -
EACRawCostRate: number
Title:
Raw Cost: Total Raw Cost Rate
Read Only:true
Rate that is used to calculate the estimated cost at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed. -
EACRevenue: number
Title:
Revenue: EAC
Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task. -
EACRevenueInProjectCurrency: number
Title:
Revenue in Project Currency: EAC
Read Only:true
Estimated revenue amount in project currency recognized for the forecast version resource assignment at the completion of the task. -
EACRevenueInProjectLedgerCurrency: number
Title:
Revenue in Project Ledger Currency: EAC
Read Only:true
Estimated revenue amount in project ledger currency recognized for the forecast version resource assignment at the completion of the task. -
EACRevenueRate: number
Title:
Effective Rate
Read Only:true
Rate that is used to calculate the estimated revenue at the completion of the task for the forecast version resource assignment. -
EffectiveETCBurdenedCostRate: number
Title:
Burdened Cost: Effective Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. -
EffectiveETCRawCostRate: number
Title:
Effective ETC Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. -
EffectiveETCRevenueRate: number
Title:
Revenue: Effective Rate
Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue. -
ETCBurdenedCost: number
Title:
ETC Burdened Cost
Read Only:true
Estimated remaining cost in planning currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment. -
ETCBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: ETC
Read Only:true
Estimated remaining cost in project currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment. -
ETCBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: ETC
Read Only:true
Estimated remaining cost in project ledger currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment. -
ETCQuantity: number
Title:
Quantity: ETC
Read Only:true
Estimated remaining effort by the forecast version resource assignment for completion. -
ETCRawCost: number
Title:
ETC Raw Cost
Read Only:true
Estimated remaining cost in planning currency required for completion of the task in the period by the forecast version resource assignment that is directly attributable to the work performed. -
ETCRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: ETC
Read Only:true
Estimated remaining cost in project currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed. -
ETCRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: ETC
Read Only:true
Estimated remaining cost in project ledger currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed. -
ETCRevenue: number
Title:
Revenue: ETC
Read Only:true
Estimated remaining revenue amount in planning currency to be recognized for the forecast version resource assignment. -
ETCRevenueInProjectCurrency: number
Title:
Revenue in Project Currency: ETC
Read Only:true
Estimated remaining revenue amount in project currency to be recognized for the forecast version resource assignment. -
ETCRevenueInProjectLedgerCurrency: number
Title:
Revenue in Project Ledger Currency: ETC
Read Only:true
Estimated remaining revenue amount in project ledger currency to be recognized for the forecast version resource assignment. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
ManualSpreadFlag: boolean
Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. -
PlanLineId: integer
(int64)
Title:
Plan Line ID
Identifier of the summary level planning amounts for a resource assignment in the forecast version. -
PlanLinesDFF: array
Plan Lines Descriptive Flexfields
Title:
Plan Lines Descriptive Flexfields
The Plan Lines Descriptive Flexfields resource is used to capture and view additional information for planning amounts in project forecasts. -
PlanningAmountDetails: array
Planning Amount Details
Title:
Planning Amount Details
The Planning Amount Details resource is used to view project forecast resource assignment periodic amounts. -
PurchaseOrderCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in planning currency that includes both raw and burden costs. -
PurchaseOrderCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project currency that includes both raw and burden costs. -
PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that includes both raw and burden costs. -
PurchaseOrderCommittedQuantity: number
Title:
Quantity Commitments: Purchase Orders
Read Only:true
Effort for the forecast version resource assignment committed through purchase orders. -
PurchaseOrderCommittedRawCost: number
Title:
Raw Cost Commitments: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in planning currency that is directly attributable to the work performed. -
PurchaseOrderCommittedRawCostInProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project currency that is directly attributable to the work performed. -
PurchaseOrderCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that is directly attributable to the work performed. -
RequisitionCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in planning currency that includes both raw and burden costs. -
RequisitionCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project currency that includes both raw and burden costs. -
RequisitionCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project ledger currency that includes both raw and burden costs. -
RequisitionCommittedQuantity: number
Title:
Requisitions
Read Only:true
Effort for the forecast version resource assignment committed through requisitions. -
RequisitionCommittedRawCost: number
Title:
Raw Cost Commitments: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in planning currency that is directly attributable to the work performed. -
RequisitionCommittedRawCostInProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project currency that is directly attributable to the work performed. -
RequisitionCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project ledger currency that is directly attributable to the work performed. -
StandardETCBurdenedCostRate: number
Title:
Standard Burdened Cost Rate
Read Only:true
Average rate derived from the rate schedule for calculating the planned burdened cost for the forecast version resource assignment. -
StandardETCRawCostRate: number
Title:
Standard ETC Rate
Read Only:true
Rate derived from the rate schedule for calculating the planned raw cost for the forecast version resource assignment. -
StandardETCRevenueRate: number
Title:
Revenue: Standard Rate
Read Only:true
Rate derived from the rate schedule for calculating the planned revenue for the forecast version resource assignment. -
SupplierInvoiceCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in planning currency that includes both raw and burden costs. -
SupplierInvoiceCommittedBurdenedCostinProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project currency that includes both raw and burden costs. -
SupplierInvoiceCommittedBurdenedCostinProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that includes both raw and burden costs. -
SupplierInvoiceCommittedQuantity: number
Title:
Quantity Commitments: Supplier Invoices
Read Only:true
Effort for the forecast version resource assignment committed through supplier invoices. -
SupplierInvoiceCommittedRawCost: number
Title:
Raw Cost Commitments: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in planning currency that is directly attributable to the work performed. -
SupplierInvoiceCommittedRawCostinProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project currency that is directly attributable to the work performed. -
SupplierInvoiceCommittedRawCostinProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that is directly attributable to the work performed. -
TotalCommittedBurdenedCost: number
Title:
Burdened Cost: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in planning currency that includes both raw and burden costs. -
TotalCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project currency that includes both raw and burden costs. -
TotalCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project ledger currency that includes both raw and burden costs. -
TotalCommittedQuantity: number
Title:
Quantity: Total Commitments
Read Only:true
Committed effort for the forecast version resource assignment. -
TotalCommittedRawCost: number
Title:
Raw Cost: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in planning currency that is directly attributable to the work performed. -
TotalCommittedRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project currency that is directly attributable to the work performed. -
TotalCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed. -
TransferOrderCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in planning currency that includes both raw and burden costs. -
TransferOrderCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project currency that includes both raw and burden costs. -
TransferOrderCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that includes both raw and burden costs. -
TransferOrderCommittedQuantity: number
Title:
Quantity Commitments: Transfer Orders
Read Only:true
Effort for the forecast version resource assignment committed through transfer orders. -
TransferOrderCommittedRawCost: number
Title:
Raw Cost Commitments: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in planning currency that is directly attributable to the work performed. -
TransferOrderCommittedRawCostInProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project currency that is directly attributable to the work performed. -
TransferOrderCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that is directly attributable to the work performed.
array
Links
array
Plan Lines Descriptive Flexfields
array
Planning Amount Details
object
-
__FLEX_Context: string
Title:
Context Segment
Maximum Length:30
Code that identifies the context for the segments of the plan lines flexfields. -
__FLEX_Context_DisplayValue: string
Title:
Context Segment
Name of the context for the segments of the plan lines flexfields. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
PlanLineId: integer
(int64)
Identifier of the summary level planning amounts for a plan line in the project forecast.
array
Links
object
-
ActualBurdenedCost: number
Title:
Burdened Cost: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in planning currency from the start of the project till the current date. -
ActualBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project currency from the start of the project till the current date. -
ActualBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment, including raw and burden costs, in project ledger currency from the start of the project till the current date. -
ActualBurdenedCostRate: number
Title:
Burdened Cost Rate
Read Only:true
Actual burdened cost rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs. -
ActualQuantity: number
Title:
Quantity: Actual Amount
Read Only:true
Actual effort for the forecast version resource assignment from the start of the project till the current date. -
ActualRawCost: number
Title:
Raw Cost: Actual Amount
Read Only:true
Actual cost incurred for the period in the forecast version resource assignment in planning currency that is directly attributable to the work performed from the start of the project till the current date. -
ActualRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment in project currency that is directly attributable to the work performed from the start of the project till the current date. -
ActualRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: Actual Amounts
Read Only:true
Actual cost incurred for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed from the start of the project till the current date. -
ActualRawCostRate: number
Title:
EAC Actual Raw Cost Rate
Read Only:true
Rate that is used to calculate the actual cost for the forecast version resource assignment that is directly attributable to the work performed. -
ActualRevenue: number
Title:
Revenue: Actual Amount
Read Only:true
Amount of revenue recognized for the forecast version resource assignment in planning currency from the inception of the project to date. -
ActualRevenueInProjectCurrency: number
Title:
Revenue in Project Currency: Actual Amounts
Read Only:true
Amount of revenue recognized for the forecast version resource assignment in project currency from the inception of the project to date. -
ActualRevenueInProjectLedgerCurrency: number
Title:
Revenue in Project Ledger Currency: Actual Amounts
Read Only:true
Amount of revenue recognized for the forecast version resource assignment in project ledger currency from the inception of the project to date. -
ActualRevenueRate: number
Title:
Revenue Rate: Actual Amount
Read Only:true
Rate that is used to calculate the actual revenue for the forecast version resource assignment. -
EACBurdenedCost: number
Title:
Burdened Cost: EAC
Estimated cost in planning currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: EAC
Read Only:true
Estimated cost in project currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: EAC
Read Only:true
Estimated cost in project ledger currency, including raw and burden costs, at the completion of the task for the forecast version resource assignment. -
EACBurdenedCostRate: number
Title:
Burdened Cost: Total Burdened Cost Rate
Read Only:true
Rate that is used to calculate the actual cost for the forecast version resource assignment that includes both raw and burden costs. -
EACQuantity: number
Title:
Quantity: EAC
Measure of the effort planned for in the forecast version resource assignment. -
EACRawCost: number
Title:
Raw Cost: EAC
Estimated cost in planning currency at the completion of the task in the period for the forecast version resource assignment that is directly attributable to the work performed. -
EACRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: EAC
Read Only:true
Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed. -
EACRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: EAC
Read Only:true
Estimated cost in project ledger currency at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed. -
EACRawCostRate: number
Title:
Raw Cost: Total Raw Cost Rate
Read Only:true
Rate that is used to calculate the estimated cost at the completion of the task for the forecast version resource assignment that is directly attributable to the work performed. -
EACRevenue: number
Title:
Revenue
Estimated revenue amount in planning currency recognized for the forecast version resource assignment at the completion of the task. -
EACRevenueInProjectCurrency: number
Title:
Revenue in Project Ledger Currency: EAC
Read Only:true
Estimated revenue amount in project currency recognized for the forecast version resource assignment at the completion of the task. -
EACRevenueInProjectLedgerCurrency: number
Title:
Revenue in Project Ledger Currency: EAC
Read Only:true
Estimated revenue amount in project ledger currency recognized for the forecast version resource assignment at the completion of the task. -
EACRevenueRate: number
Title:
Revenue Rate
Read Only:true
Rate that is used to calculate the estimated revenue at the completion of the task for the forecast version resource assignment. -
EffectiveETCBurdenedCostRate: number
Title:
Burdened Cost: Effective Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. -
EffectiveETCRawCostRate: number
Title:
Raw Cost: Effective Rate
Cost rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. -
EffectiveETCRevenueRate: number
Title:
Effective Revenue Rate
Revenue rate that is used to calculate amounts for a forecast version resource assignment. Quantity multiplied by the effective revenue rate gives the revenue. -
ETCBurdenedCost: number
Title:
Burdened Cost: ETC
Read Only:true
Estimated remaining cost in planning currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment. -
ETCBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: ETC
Read Only:true
Estimated remaining cost in project currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment. -
ETCBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: ETC
Read Only:true
Estimated remaining cost in project ledger currency, including raw and burden costs, required for completion of the task by the forecast version resource assignment. -
ETCQuantity: number
Title:
Quantity: ETC
Read Only:true
Estimated remaining effort by the forecast version resource assignment for completion. -
ETCRawCost: number
Title:
Raw Cost: ETC
Read Only:true
Estimated remaining cost in planning currency required for completion of the task in the period by the forecast version resource assignment that is directly attributable to the work performed. -
ETCRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: ETC
Read Only:true
Estimated remaining cost in project currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed. -
ETCRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: ETC
Read Only:true
Estimated remaining cost in project ledger currency required for completion of the task by the forecast version resource assignment that is directly attributable to the work performed. -
ETCRevenue: number
Title:
Revenue: ETC
Read Only:true
Estimated remaining revenue amount in planning currency to be recognized for the forecast version resource assignment. -
ETCRevenueInProjectCurrency: number
Title:
Previous Forecast Revenue in Project Currency: ETC
Read Only:true
Estimated remaining revenue amount in project currency to be recognized for the forecast version resource assignment. -
ETCRevenueInProjectLedgerCurrency: number
Title:
Revenue in Project Ledger Currency: ETC
Read Only:true
Estimated remaining revenue amount in project ledger currency to be recognized for the forecast version resource assignment. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
ManualSpreadFlag: boolean
Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. -
PeriodName: string
Title:
Period
Maximum Length:30
Period for which the periodic forecast amount is entered. -
PlanLineDetailId: integer
(int64)
Identifier of the periodic level planning amounts for a resource assignment in the forecast version.
-
PurchaseOrderCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in planning currency that includes both raw and burden costs. -
PurchaseOrderCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project currency that includes both raw and burden costs. -
PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that includes both raw and burden costs. -
PurchaseOrderCommittedQuantity: number
Title:
Quantity Commitments: Purchase Orders
Read Only:true
Effort for the forecast version resource assignment committed through purchase orders. -
PurchaseOrderCommittedRawCost: number
Title:
Raw Cost Commitments: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in planning currency that is directly attributable to the work performed. -
PurchaseOrderCommittedRawCostInProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project currency that is directly attributable to the work performed. -
PurchaseOrderCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Purchase Orders
Read Only:true
Cost for the forecast version resource assignment committed through purchase orders in project ledger currency that is directly attributable to the work performed. -
RequisitionCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in planning currency that includes both raw and burden costs. -
RequisitionCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project currency that includes both raw and burden costs. -
RequisitionCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project ledger currency that includes both raw and burden costs. -
RequisitionCommittedQuantity: number
Title:
Quantity Commitments: Requisitions
Read Only:true
Effort for the forecast version resource assignment committed through requisitions. -
RequisitionCommittedRawCost: number
Title:
Raw Cost Commitments: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in planning currency that is directly attributable to the work performed. -
RequisitionCommittedRawCostInProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project currency that is directly attributable to the work performed. -
RequisitionCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Requisitions
Read Only:true
Cost for the forecast version resource assignment committed through requisitions in project ledger currency that is directly attributable to the work performed. -
StandardETCBurdenedCostRate: number
Title:
Burdened Cost: Standard Rate
Read Only:true
Average rate derived from the rate schedule for calculating the planned burdened cost for the forecast version resource assignment. -
StandardETCRawCostRate: number
Title:
Raw Cost: Standard Rate
Read Only:true
Rate derived from the rate schedule for calculating the planned raw cost for the forecast version resource assignment. -
StandardETCRevenueRate: number
Title:
Standard Revenue Rate
Read Only:true
Rate derived from the rate schedule for calculating the planned revenue for the forecast version resource assignment. -
SupplierInvoiceCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in planning currency that includes both raw and burden costs. -
SupplierInvoiceCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project currency that includes both raw and burden costs. -
SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that includes both raw and burden costs. -
SupplierInvoiceCommittedQuantity: number
Title:
Quantity Commitments: Supplier Invoices
Read Only:true
Effort for the forecast version resource assignment committed through supplier invoices. -
SupplierInvoiceCommittedRawCost: number
Title:
Raw Cost Commitments: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in planning currency that is directly attributable to the work performed. -
SupplierInvoiceCommittedRawCostInProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project currency that is directly attributable to the work performed. -
SupplierInvoiceCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Supplier Invoices
Read Only:true
Cost for the forecast version resource assignment committed through supplier invoices in project ledger currency that is directly attributable to the work performed. -
TotalCommittedBurdenedCost: number
Title:
Burdened Cost: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in planning currency that includes both raw and burden costs. -
TotalCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost in Project Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project currency that includes both raw and burden costs. -
TotalCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost in Project Ledger Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project ledger currency that includes both raw and burden costs. -
TotalCommittedQuantity: number
Title:
Quantity: Total Commitments
Read Only:true
Committed effort for the forecast version resource assignment. -
TotalCommittedRawCost: number
Title:
Raw Cost: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in planning currency that is directly attributable to the work performed. -
TotalCommittedRawCostInProjectCurrency: number
Title:
Raw Cost in Project Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project currency that is directly attributable to the work performed. -
TotalCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost in Project Ledger Currency: Total Commitments
Read Only:true
Total committed cost for the forecast version resource assignment in project ledger currency that is directly attributable to the work performed. -
TransferOrderCommittedBurdenedCost: number
Title:
Burdened Cost Commitments: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in planning currency that includes both raw and burden costs. -
TransferOrderCommittedBurdenedCostInProjectCurrency: number
Title:
Burdened Cost Commitments in Project Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project currency that includes both raw and burden costs. -
TransferOrderCommittedBurdenedCostInProjectLedgerCurrency: number
Title:
Burdened Cost Commitments in Project Ledger Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that includes both raw and burden costs. -
TransferOrderCommittedQuantity: number
Title:
Quantity Commitments: Transfer Orders
Read Only:true
Effort for the forecast version resource assignment committed through transfer orders. -
TransferOrderCommittedRawCost: number
Title:
Raw Cost Commitments: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in planning currency that is directly attributable to the work performed. -
TransferOrderCommittedRawCostInProjectCurrency: number
Title:
Raw Cost Commitments in Project Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project currency that is directly attributable to the work performed. -
TransferOrderCommittedRawCostInProjectLedgerCurrency: number
Title:
Raw Cost Commitments in Project Ledger Currency: Transfer Orders
Read Only:true
Cost for the forecast version resource assignment committed through transfer orders in project ledger currency that is directly attributable to the work performed.
array
Links
object
-
ErrorType: string
Title:
Rejection Type
Read Only:true
Maximum Length:30
Specifies whether a warning or error. -
links: array
Links
Title:
Links
The link relations associated with the resource instance. -
MessageCause: string
Title:
Cause
Read Only:true
Maximum Length:4000
Explanation for the reason of an error or warning message. -
MessageName: string
Title:
Message Name
Read Only:true
Maximum Length:30
Message code for the issue encountered. -
MessageText: string
Title:
Message Text
Read Only:true
Maximum Length:240
Error or warning that occurs or information that informs users, to know what action to take or to understand what is happening. -
MessageUserAction: string
Title:
Action
Read Only:true
Maximum Length:4000
States the response that end users must perform to continue and complete their tasks in response to an error or warning message. -
MessageUserDetails: string
Title:
Additional Details
Read Only:true
Maximum Length:4000
More detailed explanation of message text that states why the message occurred. -
PeriodName: string
Title:
Period
Read Only:true
Maximum Length:30
Period for which the periodic forecast amount is entered. -
PlanVersionId: number
Title:
Plan Version
Read Only:true
Identifier of the project forecast version. -
ResourceName: string
Title:
Resource
Read Only:true
Maximum Length:240
The name of the resource used to create the forecast line. -
TaskName: string
Title:
Task Name
Read Only:true
Maximum Length:255
Name of the task which is used to create a forecast line. -
TaskNumber: string
Title:
Task Number
Read Only:true
Maximum Length:100
Number of the task which is used to create a forecast line. -
TransactionCurrencyCode: string
Title:
Currency
Read Only:true
Maximum Length:15
Currency code for the forecast lines.
array
Links
- Attachments
-
Parameters:
- PlanVersionId:
$request.path.PlanVersionId
The attachments resource is used to view, create, update and delete attachments for project forecasts. - PlanVersionId:
- PlanningOptions
-
Operation: /fscmRestApi/resources/11.13.18.05/projectForecasts/{PlanVersionId}/child/PlanningOptionsParameters:
- PlanVersionId:
$request.path.PlanVersionId
The Planning Options resource is used to view the planning options configured for the project forecast version. - PlanVersionId:
- PlanningResources
-
Operation: /fscmRestApi/resources/11.13.18.05/projectForecasts/{PlanVersionId}/child/PlanningResourcesParameters:
- PlanVersionId:
$request.path.PlanVersionId
The Planning Resources resource is used to view project forecast resource assignments. - PlanVersionId:
- VersionErrors
-
Parameters:
- PlanVersionId:
$request.path.PlanVersionId
The Errors resource is used to view the errors in project forecasts. - PlanVersionId:
- adjust
-
Parameters:
- PlanVersionId:
$request.path.PlanVersionId
Adjusts the project forecast version using the adjustment parameters. - PlanVersionId:
- refreshActualAmounts
-
Operation: /fscmRestApi/resources/11.13.18.05/projectForecasts/{PlanVersionId}/action/refreshActualAmountsParameters:
- PlanVersionId:
$request.path.PlanVersionId
Refresh actual amounts for project forecast version. Performs a refresh for the entire forecast version if you don???t specify the refreshActualAmountsFrom and refreshActualAmountsTo dates. If you specify these dates, the actual amounts that are incurred outside these dates aren???t considered for the forecast version. - PlanVersionId:
- refreshRates
-
Parameters:
- PlanVersionId:
$request.path.PlanVersionId
Refresh rates for the project forecast version. - PlanVersionId:
Examples
Example 1
The following example shows how to create project forecast versions using a batch operation.
curl --user ppm_cloud_user -X POST -H "Content-Type: application/vnd.oracle.adf.batch+json" -d @example_request_payload.json "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05" -H 'cache-control: no-cache'
Example 1 Request Body
The following shows an example of the request body in JSON format.
{ "parts":[ { "id":"part1", "path":"/projectForecasts", "operation":"create", "payload":{ "FinancialPlanType":"Non Primary Forecast", "PlanVersionName":"Current Working 1", "PlanVersionStatus":"Current Working", "ProjectName": "DEV_PJO_CDRM_R13MBV_CONLY", "ForecastCreationMethod":"GENERATE", "ForecastGenerationSource":"PROJECT_PLAN", "SourcePlanVersionStatus": "Current Working" } }, { "id":"part2", "path":"/projectForecasts", "operation":"create", "payload":{ "FinancialPlanType":"Non Primary Forecast", "PlanVersionName":"Current Working 1", "PlanVersionStatus":"Current Working", "ProjectName": "DEV_PJO_CDRM_R13MBV_CRSAME", "ForecastCreationMethod":"GENERATE", "ForecastGenerationSource":"PROJECT_PLAN", "SourcePlanVersionStatus": "Current Working" } }, { "id":"part3", "path":"/projectForecasts", "operation":"create", "payload":{ "FinancialPlanType":"Non Primary Forecast", "PlanVersionName":"Current Working 1", "PlanVersionStatus":"Current Working", "ProjectName": "DEV_PJO_CDRM_R13MBV_RONLY", "ForecastCreationMethod":"GENERATE", "ForecastGenerationSource":"PROJECT_PLAN", "SourcePlanVersionStatus": "Current Working" } } ] }
Example 1 Response Body
The following shows an example of the response body in JSON format.
{ "parts": [ { "id": "part1", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts", "operation": "create", "payload": { "PlanVersionId": 300100185594142, "PlanVersionNumber": 1, "PlanVersionName": "Current Working 1", "PlanVersionDescription": null, "PlanVersionStatus": "Processing", "ForecastCreationMethod": null, "ForecastCreationMethodCode": null, "ForecastGenerationSource": null, "ForecastGenerationSourceCode": null, "SourcePlanVersionId": null, "SourcePlanType": null, "SourcePlanVersionNumber": null, "SourcePlanVersionName": null, "SourcePlanVersionStatus": null, "ProjectId": 300100084467383, "ProjectNumber": "DEV_PJO_CDRM_R13MBV_CONLY", "ProjectName": "DEV_PJO_CDRM_R13MBV_CONLY", "FinancialPlanType": "Non Primary Forecast", "DeferFinancialPlanCreation": null, "AdministrativeCode": null, "LockedFlag": "false", "LockedBy": null, "PlanningAmounts": "COST_AND_REV_TOGETHER", "AdjustmentPercentage": null, "RawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": null, "RevenueInProjectCurrency": null, "ActualRawCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ActualRevenueInProjectCurrency": null, "TotalCommitmentsInProjectCurrency": null, "ETCStartDate": null, "ETCRawCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": null, "RevenueInProjectLedgerCurrency": null, "EACLaborEffort": null, "EACEquipmentEffort": null, "CurrentBaselineBudgetMarginVariance": 0, "CurrentBaselineBudgetMarginVariancePercentage": 0, "OriginalBaselineBudgetMarginVariance": 0, "OriginalBaselineBudgetMarginVariancePercentage": 0, "CurrentForecastMarginVariance": 0, "CurrentForecastMarginVariancePercentage": 0, "PreviousForecastMarginVariance": 0, "PreviousForecastMarginVariancePercentage": 0, "Margin": null, "MarginPercentage": null, "PlanningOptionId": 300100185594145, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142", "name": "projectForecasts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142/lov/ProjectLOVVO", "name": "ProjectLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142/lov/ForecastCreationMethodLOVVO", "name": "ForecastCreationMethodLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142/lov/FinancialPlanTypesLOVVO", "name": "FinancialPlanTypesLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142/lov/ForecastGenerationSourceLOVVO", "name": "ForecastGenerationSourceLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142/child/PlanningOptions", "name": "PlanningOptions", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142/child/PlanningResources", "name": "PlanningResources", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594142/child/VersionErrors", "name": "VersionErrors", "kind": "collection" } ], } }, { "id": "part2", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts", "operation": "create", "payload": { "PlanVersionId": 300100185594143, "PlanVersionNumber": 1, "PlanVersionName": "Current Working 1", "PlanVersionDescription": null, "PlanVersionStatus": "Processing", "ForecastCreationMethod": null, "ForecastCreationMethodCode": null, "ForecastGenerationSource": null, "ForecastGenerationSourceCode": null, "SourcePlanVersionId": null, "SourcePlanType": null, "SourcePlanVersionNumber": null, "SourcePlanVersionName": null, "SourcePlanVersionStatus": null, "ProjectId": 300100084467409, "ProjectNumber": "DEV_PJO_CDRM_R13MBV_CRSAM", "ProjectName": "DEV_PJO_CDRM_R13MBV_CRSAME", "FinancialPlanType": "Non Primary Forecast", "DeferFinancialPlanCreation": null, "AdministrativeCode": null, "LockedFlag": "false", "LockedBy": null, "PlanningAmounts": "COST_AND_REV_TOGETHER", "AdjustmentPercentage": null, "RawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": null, "RevenueInProjectCurrency": null, "ActualRawCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ActualRevenueInProjectCurrency": null, "TotalCommitmentsInProjectCurrency": null, "ETCStartDate": null, "ETCRawCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": null, "RevenueInProjectLedgerCurrency": null, "EACLaborEffort": null, "EACEquipmentEffort": null, "CurrentBaselineBudgetMarginVariance": 0, "CurrentBaselineBudgetMarginVariancePercentage": 0, "OriginalBaselineBudgetMarginVariance": 0, "OriginalBaselineBudgetMarginVariancePercentage": 0, "CurrentForecastMarginVariance": 0, "CurrentForecastMarginVariancePercentage": 0, "PreviousForecastMarginVariance": 0, "PreviousForecastMarginVariancePercentage": 0, "Margin": null, "MarginPercentage": null, "PlanningOptionId": 300100185594152, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143", "name": "projectForecasts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143/lov/ProjectLOVVO", "name": "ProjectLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143/lov/ForecastCreationMethodLOVVO", "name": "ForecastCreationMethodLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143/lov/FinancialPlanTypesLOVVO", "name": "FinancialPlanTypesLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143/lov/ForecastGenerationSourceLOVVO", "name": "ForecastGenerationSourceLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143/child/PlanningOptions", "name": "PlanningOptions", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143/child/PlanningResources", "name": "PlanningResources", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594143/child/VersionErrors", "name": "VersionErrors", "kind": "collection" } ], } }, { "id": "part3", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts", "operation": "create", "payload": { "PlanVersionId": 300100185594144, "PlanVersionNumber": 1, "PlanVersionName": "Current Working 1", "PlanVersionDescription": null, "PlanVersionStatus": "Processing", "ForecastCreationMethod": null, "ForecastCreationMethodCode": null, "ForecastGenerationSource": null, "ForecastGenerationSourceCode": null, "SourcePlanVersionId": null, "SourcePlanType": null, "SourcePlanVersionNumber": null, "SourcePlanVersionName": null, "SourcePlanVersionStatus": null, "ProjectId": 300100084467461, "ProjectNumber": "DEV_PJO_CDRM_R13MBV_RONLY", "ProjectName": "DEV_PJO_CDRM_R13MBV_RONLY", "FinancialPlanType": "Non Primary Forecast", "DeferFinancialPlanCreation": null, "AdministrativeCode": null, "LockedFlag": "false", "LockedBy": null, "PlanningAmounts": "COST_AND_REV_TOGETHER", "AdjustmentPercentage": null, "RawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": null, "RevenueInProjectCurrency": null, "ActualRawCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ActualRevenueInProjectCurrency": null, "TotalCommitmentsInProjectCurrency": null, "ETCStartDate": null, "ETCRawCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": null, "RevenueInProjectLedgerCurrency": null, "EACLaborEffort": null, "EACEquipmentEffort": null, "CurrentBaselineBudgetMarginVariance": 0, "CurrentBaselineBudgetMarginVariancePercentage": 0, "OriginalBaselineBudgetMarginVariance": 0, "OriginalBaselineBudgetMarginVariancePercentage": 0, "CurrentForecastMarginVariance": 0, "CurrentForecastMarginVariancePercentage": 0, "PreviousForecastMarginVariance": 0, "PreviousForecastMarginVariancePercentage": 0, "Margin": null, "MarginPercentage": null, "PlanningOptionId": 300100185594159, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144", "name": "projectForecasts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144/lov/ProjectLOVVO", "name": "ProjectLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144/lov/ForecastCreationMethodLOVVO", "name": "ForecastCreationMethodLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144/lov/FinancialPlanTypesLOVVO", "name": "FinancialPlanTypesLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144/lov/ForecastGenerationSourceLOVVO", "name": "ForecastGenerationSourceLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144/child/PlanningOptions", "name": "PlanningOptions", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144/child/PlanningResources", "name": "PlanningResources", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594144/child/VersionErrors", "name": "VersionErrors", "kind": "collection" } ], } } ], }
Example 2
The following example shows how to create project forecast versions with planning resources and manual forecast creation method using a batch operation.
curl --user ppm_cloud_user -X POST -H "Content-Type: application/vnd.oracle.adf.batch+json" -d @example_request_payload.json "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05" -H 'cache-control: no-cache'
Example 2 Request Body
The following shows an example of the request body in JSON format.
{ "parts":[ { "id":"part1", "path":"/projectForecasts", "operation":"create", "payload":{ "FinancialPlanType":"Non Primary Forecast", "PlanVersionName":"REST Forecast Manual Vr1", "PlanVersionDescription":"REST Forecast Manual Vr1", "PlanVersionStatus":"Working", "ForecastCreationMethod":"MANUAL", "DeferFinancialPlanCreation":"N", "ProjectNumber":"0002 PJS CDRM AM", "PlanningResources":[ { "TaskNumber":"1.0", "ResourceName":"Labor", "PlanningStartDate":"2012-01-01T00:00:00+05:30", "PlanningEndDate":"2015-12-31T00:00:00+05:30", "PlanningAmounts":[ { "EACQuantity":"10", "Currency":"USD", "EACRawCost":"1000", "EACBurdenedCost":"2500", "PlanningAmountDetails":[ { "PeriodName":"Dec-13", "EACQuantity":10, "EACRawCost":"1000", "EACBurdenedCost":"2500" } ] } ] } ] } }, { "id":"part2", "path":"/projectForecasts", "operation":"create", "payload":{ "FinancialPlanType":"Non Primary Forecast", "PlanVersionName":"REST Forecast Manual Vr1", "PlanVersionDescription":"REST Forecast Manual Vr1", "PlanVersionStatus":"Working", "ForecastCreationMethod":"MANUAL", "DeferFinancialPlanCreation":"N", "ProjectName":"DEV_PJO_CDRM_R13MBV_CONLY", "PlanningResources":[ { "TaskNumber":"1.0", "ResourceName":"Labor", "PlanningStartDate":"2012-01-01T00:00:00+05:30", "PlanningEndDate":"2015-12-31T00:00:00+05:30", "PlanningAmounts":[ { "EACQuantity":"10", "Currency":"USD", "EACRawCost":"1000", "EACBurdenedCost":"2500", "PlanningAmountDetails":[ { "PeriodName":"Dec-19", "EACQuantity":10, "EACRawCost":"1000", "EACBurdenedCost":"2500" } ] } ] } ] } }, { "id":"part3", "path":"/projectForecasts", "operation":"create", "payload":{ "FinancialPlanType":"Non Primary Forecast", "PlanVersionName":"REST Forecast Manual Vr1", "PlanVersionDescription":"REST Forecast Manual Vr1", "PlanVersionStatus":"Working", "ForecastCreationMethod":"MANUAL", "DeferFinancialPlanCreation":"N", "ProjectName":"DEV_PJO_CDRM_R13MBV_RONLY", "PlanningResources":[ { "TaskNumber":"1.0", "ResourceName":"Labor", "PlanningStartDate":"2012-01-01T00:00:00+05:30", "PlanningEndDate":"2015-12-31T00:00:00+05:30", "PlanningAmounts":[ { "EACQuantity":"10", "Currency":"USD", "EACRawCost":"1000", "EACBurdenedCost":"2500", "PlanningAmountDetails":[ { "PeriodName":"Dec-19", "EACQuantity":10, "EACRawCost":"1000", "EACBurdenedCost":"2500" } ] } ] } ] } } ] }
Example 2 Response Body
The following shows an example of the response body in JSON format.
{ "parts": [ { "id": "part1", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts", "operation": "create", "payload": { "PlanVersionId": 300100185594166, "PlanVersionNumber": 1, "PlanVersionName": "REST Forecast Manual Vr1", "PlanVersionDescription": "REST Forecast Manual Vr1", "PlanVersionStatus": "Processing", "ForecastCreationMethod": null, "ForecastCreationMethodCode": null, "ForecastGenerationSource": null, "ForecastGenerationSourceCode": null, "SourcePlanVersionId": null, "SourcePlanType": null, "SourcePlanVersionNumber": null, "SourcePlanVersionName": null, "SourcePlanVersionStatus": null, "ProjectId": 300100023161776, "ProjectNumber": "0002 PJS CDRM AM", "ProjectName": "0002 PJS CDRM AM", "FinancialPlanType": "Non Primary Forecast", "DeferFinancialPlanCreation": null, "AdministrativeCode": null, "LockedFlag": "false", "LockedBy": null, "PlanningAmounts": "COST_AND_REV_TOGETHER", "AdjustmentPercentage": null, "RawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": null, "RevenueInProjectCurrency": null, "ActualRawCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ActualRevenueInProjectCurrency": null, "TotalCommitmentsInProjectCurrency": null, "ETCStartDate": null, "ETCRawCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": null, "RevenueInProjectLedgerCurrency": null, "EACLaborEffort": null, "EACEquipmentEffort": null, "CurrentBaselineBudgetMarginVariance": 0, "CurrentBaselineBudgetMarginVariancePercentage": 0, "OriginalBaselineBudgetMarginVariance": 0, "OriginalBaselineBudgetMarginVariancePercentage": 0, "CurrentForecastMarginVariance": 0, "CurrentForecastMarginVariancePercentage": 0, "PreviousForecastMarginVariance": 0, "PreviousForecastMarginVariancePercentage": 0, "Margin": null, "MarginPercentage": null, "PlanningOptionId": 300100185594178, "PlanningResources": { "items": [ { "PlanningElementId": 300100185594167, "TaskId": 300100023161792, "TaskNumber": "1.0", "TaskName": "Structure", "RbsElementId": 100100008580900, "ResourceName": "Labor", "UnitOfMeasure": "Hours", "ResourceClass": "Labor", "PlanningStartDate": "2011-12-31T18:30:00+00:00", "PlanningEndDate": "2015-12-30T18:30:00+00:00", "PlanningAmounts": { "items": [ { "PlanLineId": 300100185594168, "TotalCommittedQuantity": null, "ActualQuantity": null, "ETCQuantity": 10, "EACQuantity": 10, "Currency": "USD", "TotalCommittedRawCost": null, "ActualRawCost": null, "ETCRawCost": 1000, "EACRawCost": 1000, "StandardETCRawCostRate": null, "EffectiveETCRawCostRate": 100, "ActualRawCostRate": 0, "EACRawCostRate": 100, "TotalCommittedBurdenedCost": null, "ActualBurdenedCost": null, "ETCBurdenedCost": 2500, "EACBurdenedCost": 2500, "StandardETCBurdenedCostRate": null, "EffectiveETCBurdenedCostRate": 250, "ActualBurdenedCostRate": 0, "EACBurdenedCostRate": 250, "RequisitionCommittedQuantity": null, "PurchaseOrderCommittedQuantity": null, "SupplierInvoiceCommittedQuantity": null, "TransferOrderCommittedQuantity": null, "RequisitionCommittedRawCost": null, "PurchaseOrderCommittedRawCost": null, "SupplierInvoiceCommittedRawCost": null, "TransferOrderCommittedRawCost": null, "RequisitionCommittedBurdenedCost": null, "PurchaseOrderCommittedBurdenedCost": null, "SupplierInvoiceCommittedBurdenedCost": null, "TransferOrderCommittedBurdenedCost": null, "TotalCommittedRawCostInProjectCurrency": 0, "ActualRawCostInProjectCurrency": null, "ETCRawCostInProjectCurrency": null, "EACRawCostInProjectCurrency": null, "RequisitionCommittedRawCostInProjectCurrency": null, "PurchaseOrderCommittedRawCostInProjectCurrency": null, "SupplierInvoiceCommittedRawCostinProjectCurrency": null, "TransferOrderCommittedRawCostInProjectCurrency": null, "TotalCommittedRawCostInProjectLedgerCurrency": 0, "ActualRawCostInProjectLedgerCurrency": null, "ETCRawCostInProjectLedgerCurrency": null, "EACRawCostInProjectLedgerCurrency": null, "RequisitionCommittedRawCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedRawCostinProjectLedgerCurrency": null, "TransferOrderCommittedRawCostInProjectLedgerCurrency": null, "TotalCommittedBurdenedCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": 0, "EACBurdenedCostInProjectCurrency": null, "RequisitionCommittedBurdenedCostInProjectCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectCurrency": null, "SupplierInvoiceCommittedBurdenedCostinProjectCurrency": null, "TransferOrderCommittedBurdenedCostInProjectCurrency": null, "TotalCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualBurdenedCostInProjectLedgerCurrency": null, "ETCBurdenedCostInProjectLedgerCurrency": 0, "EACBurdenedCostInProjectLedgerCurrency": null, "RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedBurdenedCostinProjectLedgerCurrency": null, "TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualRevenue": null, "ETCRevenue": 0, "EACRevenue": null, "StandardETCRevenueRate": null, "EffectiveETCRevenueRate": null, "ActualRevenueRate": 0, "EACRevenueRate": 0, "ActualRevenueInProjectCurrency": null, "ETCRevenueInProjectCurrency": 0, "EACRevenueInProjectCurrency": null, "ActualRevenueInProjectLedgerCurrency": null, "ETCRevenueInProjectLedgerCurrency": 0, "EACRevenueInProjectLedgerCurrency": null, "PlanningAmountDetails": { "items": [ { "PlanLineDetailId": 300100185594169, "TotalCommittedQuantity": null, "ActualQuantity": null, "ETCQuantity": 10, "EACQuantity": 10, "PeriodName": "Dec-13", "TotalCommittedRawCost": null, "ActualRawCost": null, "ETCRawCost": 1000, "EACRawCost": 1000, "StandardETCRawCostRate": null, "EffectiveETCRawCostRate": 100, "ActualRawCostRate": 0, "EACRawCostRate": 100, "TotalCommittedBurdenedCost": null, "ActualBurdenedCost": null, "ETCBurdenedCost": 2500, "EACBurdenedCost": 2500, "StandardETCBurdenedCostRate": null, "EffectiveETCBurdenedCostRate": 250, "ActualBurdenedCostRate": 0, "EACBurdenedCostRate": 250, "RequisitionCommittedQuantity": null, "PurchaseOrderCommittedQuantity": null, "SupplierInvoiceCommittedQuantity": null, "TransferOrderCommittedQuantity": null, "RequisitionCommittedRawCost": null, "PurchaseOrderCommittedRawCost": null, "SupplierInvoiceCommittedRawCost": null, "TransferOrderCommittedRawCost": null, "RequisitionCommittedBurdenedCost": null, "PurchaseOrderCommittedBurdenedCost": null, "SupplierInvoiceCommittedBurdenedCost": null, "TransferOrderCommittedBurdenedCost": null, "TotalCommittedRawCostInProjectCurrency": 0, "ActualRawCostInProjectCurrency": null, "ETCRawCostInProjectCurrency": null, "EACRawCostInProjectCurrency": null, "RequisitionCommittedRawCostInProjectCurrency": null, "PurchaseOrderCommittedRawCostInProjectCurrency": null, "SupplierInvoiceCommittedRawCostInProjectCurrency": null, "TransferOrderCommittedRawCostInProjectCurrency": null, "TotalCommittedRawCostInProjectLedgerCurrency": 0, "ActualRawCostInProjectLedgerCurrency": null, "ETCRawCostInProjectLedgerCurrency": null, "EACRawCostInProjectLedgerCurrency": null, "RequisitionCommittedRawCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedRawCostInProjectLedgerCurrency": null, "TransferOrderCommittedRawCostInProjectLedgerCurrency": null, "TotalCommittedBurdenedCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": 0, "EACBurdenedCostInProjectCurrency": null, "RequisitionCommittedBurdenedCostInProjectCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectCurrency": null, "SupplierInvoiceCommittedBurdenedCostInProjectCurrency": null, "TransferOrderCommittedBurdenedCostInProjectCurrency": null, "TotalCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualBurdenedCostInProjectLedgerCurrency": null, "ETCBurdenedCostInProjectLedgerCurrency": 0, "EACBurdenedCostInProjectLedgerCurrency": null, "RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency": null, "TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualRevenue": null, "ETCRevenue": 0, "EACRevenue": null, "StandardETCRevenueRate": null, "EffectiveETCRevenueRate": null, "ActualRevenueRate": 0, "EACRevenueRate": 0, "ActualRevenueInProjectCurrency": null, "ETCRevenueInProjectCurrency": 0, "EACRevenueInProjectCurrency": null, "ActualRevenueInProjectLedgerCurrency": null, "ETCRevenueInProjectLedgerCurrency": 0, "EACRevenueInProjectLedgerCurrency": null, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168/child/PlanningAmountDetails/300100185594169", "name": "PlanningAmountDetails", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168/child/PlanningAmountDetails/300100185594169", "name": "PlanningAmountDetails", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168", "name": "PlanningAmounts", "kind": "item" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168", "name": "PlanningAmounts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168", "name": "PlanningAmounts", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167", "name": "PlanningResources", "kind": "item" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168/child/PlanLinesDFF", "name": "PlanLinesDFF", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts/300100185594168/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts", "name": "PlanningAmounts", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167", "name": "PlanningResources", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167", "name": "PlanningResources", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/lov/PrimaryPlanningRBSLOVVO", "name": "PrimaryPlanningRBSLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/lov/FinancialTaskVersionLOVVO", "name": "FinancialTaskVersionLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources/300100185594167/child/PlanningAmounts", "name": "PlanningAmounts", "kind": "collection" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources", "name": "PlanningResources", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166", "name": "projectForecasts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000278" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/lov/ProjectLOVVO", "name": "ProjectLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/lov/ForecastCreationMethodLOVVO", "name": "ForecastCreationMethodLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/lov/FinancialPlanTypesLOVVO", "name": "FinancialPlanTypesLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/lov/ForecastGenerationSourceLOVVO", "name": "ForecastGenerationSourceLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningOptions", "name": "PlanningOptions", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/PlanningResources", "name": "PlanningResources", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594166/child/VersionErrors", "name": "VersionErrors", "kind": "collection" } ], } }, { "id": "part2", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts", "operation": "create", "payload": { "PlanVersionId": 300100185594170, "PlanVersionNumber": 2, "PlanVersionName": "REST Forecast Manual Vr1", "PlanVersionDescription": "REST Forecast Manual Vr1", "PlanVersionStatus": "Processing", "ForecastCreationMethod": null, "ForecastCreationMethodCode": null, "ForecastGenerationSource": null, "ForecastGenerationSourceCode": null, "SourcePlanVersionId": null, "SourcePlanType": null, "SourcePlanVersionNumber": null, "SourcePlanVersionName": null, "SourcePlanVersionStatus": null, "ProjectId": 300100084467383, "ProjectNumber": "DEV_PJO_CDRM_R13MBV_CONLY", "ProjectName": "DEV_PJO_CDRM_R13MBV_CONLY", "FinancialPlanType": "Non Primary Forecast", "DeferFinancialPlanCreation": null, "AdministrativeCode": null, "LockedFlag": "false", "LockedBy": null, "PlanningAmounts": "COST_AND_REV_TOGETHER", "AdjustmentPercentage": null, "RawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": null, "RevenueInProjectCurrency": null, "ActualRawCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ActualRevenueInProjectCurrency": null, "TotalCommitmentsInProjectCurrency": null, "ETCStartDate": null, "ETCRawCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": null, "RevenueInProjectLedgerCurrency": null, "EACLaborEffort": null, "EACEquipmentEffort": null, "CurrentBaselineBudgetMarginVariance": 0, "CurrentBaselineBudgetMarginVariancePercentage": 0, "OriginalBaselineBudgetMarginVariance": 0, "OriginalBaselineBudgetMarginVariancePercentage": 0, "CurrentForecastMarginVariance": 0, "CurrentForecastMarginVariancePercentage": 0, "PreviousForecastMarginVariance": 0, "PreviousForecastMarginVariancePercentage": 0, "Margin": null, "MarginPercentage": null, "PlanningOptionId": 300100185594185, "PlanningResources": { "items": [ { "PlanningElementId": 300100185594171, "TaskId": 100100048824024, "TaskNumber": "1.0", "TaskName": "Schematic Design Phase", "RbsElementId": 100100048824017, "ResourceName": "Labor", "UnitOfMeasure": "Hours", "ResourceClass": "Labor", "PlanningStartDate": "2011-12-31T18:30:00+00:00", "PlanningEndDate": "2015-12-30T18:30:00+00:00", "PlanningAmounts": { "items": [ { "PlanLineId": 300100185594172, "TotalCommittedQuantity": null, "ActualQuantity": null, "ETCQuantity": 10, "EACQuantity": 10, "Currency": "USD", "TotalCommittedRawCost": null, "ActualRawCost": null, "ETCRawCost": 1000, "EACRawCost": 1000, "StandardETCRawCostRate": null, "EffectiveETCRawCostRate": 100, "ActualRawCostRate": 0, "EACRawCostRate": 100, "TotalCommittedBurdenedCost": null, "ActualBurdenedCost": null, "ETCBurdenedCost": 2500, "EACBurdenedCost": 2500, "StandardETCBurdenedCostRate": null, "EffectiveETCBurdenedCostRate": 250, "ActualBurdenedCostRate": 0, "EACBurdenedCostRate": 250, "RequisitionCommittedQuantity": null, "PurchaseOrderCommittedQuantity": null, "SupplierInvoiceCommittedQuantity": null, "TransferOrderCommittedQuantity": null, "RequisitionCommittedRawCost": null, "PurchaseOrderCommittedRawCost": null, "SupplierInvoiceCommittedRawCost": null, "TransferOrderCommittedRawCost": null, "RequisitionCommittedBurdenedCost": null, "PurchaseOrderCommittedBurdenedCost": null, "SupplierInvoiceCommittedBurdenedCost": null, "TransferOrderCommittedBurdenedCost": null, "TotalCommittedRawCostInProjectCurrency": 0, "ActualRawCostInProjectCurrency": null, "ETCRawCostInProjectCurrency": null, "EACRawCostInProjectCurrency": null, "RequisitionCommittedRawCostInProjectCurrency": null, "PurchaseOrderCommittedRawCostInProjectCurrency": null, "SupplierInvoiceCommittedRawCostinProjectCurrency": null, "TransferOrderCommittedRawCostInProjectCurrency": null, "TotalCommittedRawCostInProjectLedgerCurrency": 0, "ActualRawCostInProjectLedgerCurrency": null, "ETCRawCostInProjectLedgerCurrency": null, "EACRawCostInProjectLedgerCurrency": null, "RequisitionCommittedRawCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedRawCostinProjectLedgerCurrency": null, "TransferOrderCommittedRawCostInProjectLedgerCurrency": null, "TotalCommittedBurdenedCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": 0, "EACBurdenedCostInProjectCurrency": null, "RequisitionCommittedBurdenedCostInProjectCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectCurrency": null, "SupplierInvoiceCommittedBurdenedCostinProjectCurrency": null, "TransferOrderCommittedBurdenedCostInProjectCurrency": null, "TotalCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualBurdenedCostInProjectLedgerCurrency": null, "ETCBurdenedCostInProjectLedgerCurrency": 0, "EACBurdenedCostInProjectLedgerCurrency": null, "RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedBurdenedCostinProjectLedgerCurrency": null, "TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualRevenue": null, "ETCRevenue": 0, "EACRevenue": null, "StandardETCRevenueRate": null, "EffectiveETCRevenueRate": null, "ActualRevenueRate": 0, "EACRevenueRate": 0, "ActualRevenueInProjectCurrency": null, "ETCRevenueInProjectCurrency": 0, "EACRevenueInProjectCurrency": null, "ActualRevenueInProjectLedgerCurrency": null, "ETCRevenueInProjectLedgerCurrency": 0, "EACRevenueInProjectLedgerCurrency": null, "PlanningAmountDetails": { "items": [ { "PlanLineDetailId": 300100185594173, "TotalCommittedQuantity": null, "ActualQuantity": null, "ETCQuantity": 10, "EACQuantity": 10, "PeriodName": "Dec-19", "TotalCommittedRawCost": null, "ActualRawCost": null, "ETCRawCost": 1000, "EACRawCost": 1000, "StandardETCRawCostRate": null, "EffectiveETCRawCostRate": 100, "ActualRawCostRate": 0, "EACRawCostRate": 100, "TotalCommittedBurdenedCost": null, "ActualBurdenedCost": null, "ETCBurdenedCost": 2500, "EACBurdenedCost": 2500, "StandardETCBurdenedCostRate": null, "EffectiveETCBurdenedCostRate": 250, "ActualBurdenedCostRate": 0, "EACBurdenedCostRate": 250, "RequisitionCommittedQuantity": null, "PurchaseOrderCommittedQuantity": null, "SupplierInvoiceCommittedQuantity": null, "TransferOrderCommittedQuantity": null, "RequisitionCommittedRawCost": null, "PurchaseOrderCommittedRawCost": null, "SupplierInvoiceCommittedRawCost": null, "TransferOrderCommittedRawCost": null, "RequisitionCommittedBurdenedCost": null, "PurchaseOrderCommittedBurdenedCost": null, "SupplierInvoiceCommittedBurdenedCost": null, "TransferOrderCommittedBurdenedCost": null, "TotalCommittedRawCostInProjectCurrency": 0, "ActualRawCostInProjectCurrency": null, "ETCRawCostInProjectCurrency": null, "EACRawCostInProjectCurrency": null, "RequisitionCommittedRawCostInProjectCurrency": null, "PurchaseOrderCommittedRawCostInProjectCurrency": null, "SupplierInvoiceCommittedRawCostInProjectCurrency": null, "TransferOrderCommittedRawCostInProjectCurrency": null, "TotalCommittedRawCostInProjectLedgerCurrency": 0, "ActualRawCostInProjectLedgerCurrency": null, "ETCRawCostInProjectLedgerCurrency": null, "EACRawCostInProjectLedgerCurrency": null, "RequisitionCommittedRawCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedRawCostInProjectLedgerCurrency": null, "TransferOrderCommittedRawCostInProjectLedgerCurrency": null, "TotalCommittedBurdenedCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": 0, "EACBurdenedCostInProjectCurrency": null, "RequisitionCommittedBurdenedCostInProjectCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectCurrency": null, "SupplierInvoiceCommittedBurdenedCostInProjectCurrency": null, "TransferOrderCommittedBurdenedCostInProjectCurrency": null, "TotalCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualBurdenedCostInProjectLedgerCurrency": null, "ETCBurdenedCostInProjectLedgerCurrency": 0, "EACBurdenedCostInProjectLedgerCurrency": null, "RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency": null, "TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualRevenue": null, "ETCRevenue": 0, "EACRevenue": null, "StandardETCRevenueRate": null, "EffectiveETCRevenueRate": null, "ActualRevenueRate": 0, "EACRevenueRate": 0, "ActualRevenueInProjectCurrency": null, "ETCRevenueInProjectCurrency": 0, "EACRevenueInProjectCurrency": null, "ActualRevenueInProjectLedgerCurrency": null, "ETCRevenueInProjectLedgerCurrency": 0, "EACRevenueInProjectLedgerCurrency": null, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172/child/PlanningAmountDetails/300100185594173", "name": "PlanningAmountDetails", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172/child/PlanningAmountDetails/300100185594173", "name": "PlanningAmountDetails", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172", "name": "PlanningAmounts", "kind": "item" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172", "name": "PlanningAmounts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172", "name": "PlanningAmounts", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171", "name": "PlanningResources", "kind": "item" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172/child/PlanLinesDFF", "name": "PlanLinesDFF", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts/300100185594172/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts", "name": "PlanningAmounts", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171", "name": "PlanningResources", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171", "name": "PlanningResources", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/lov/PrimaryPlanningRBSLOVVO", "name": "PrimaryPlanningRBSLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/lov/FinancialTaskVersionLOVVO", "name": "FinancialTaskVersionLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources/300100185594171/child/PlanningAmounts", "name": "PlanningAmounts", "kind": "collection" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources", "name": "PlanningResources", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170", "name": "projectForecasts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000278" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/lov/ProjectLOVVO", "name": "ProjectLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/lov/ForecastCreationMethodLOVVO", "name": "ForecastCreationMethodLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/lov/FinancialPlanTypesLOVVO", "name": "FinancialPlanTypesLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/lov/ForecastGenerationSourceLOVVO", "name": "ForecastGenerationSourceLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningOptions", "name": "PlanningOptions", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/PlanningResources", "name": "PlanningResources", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594170/child/VersionErrors", "name": "VersionErrors", "kind": "collection" } ], } }, { "id": "part3", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts", "operation": "create", "payload": { "PlanVersionId": 300100185594174, "PlanVersionNumber": 2, "PlanVersionName": "REST Forecast Manual Vr1", "PlanVersionDescription": "REST Forecast Manual Vr1", "PlanVersionStatus": "Processing", "ForecastCreationMethod": null, "ForecastCreationMethodCode": null, "ForecastGenerationSource": null, "ForecastGenerationSourceCode": null, "SourcePlanVersionId": null, "SourcePlanType": null, "SourcePlanVersionNumber": null, "SourcePlanVersionName": null, "SourcePlanVersionStatus": null, "ProjectId": 300100084467461, "ProjectNumber": "DEV_PJO_CDRM_R13MBV_RONLY", "ProjectName": "DEV_PJO_CDRM_R13MBV_RONLY", "FinancialPlanType": "Non Primary Forecast", "DeferFinancialPlanCreation": null, "AdministrativeCode": null, "LockedFlag": "false", "LockedBy": null, "PlanningAmounts": "COST_AND_REV_TOGETHER", "AdjustmentPercentage": null, "RawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": null, "RevenueInProjectCurrency": null, "ActualRawCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ActualRevenueInProjectCurrency": null, "TotalCommitmentsInProjectCurrency": null, "ETCStartDate": null, "ETCRawCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": null, "RevenueInProjectLedgerCurrency": null, "EACLaborEffort": null, "EACEquipmentEffort": null, "CurrentBaselineBudgetMarginVariance": 0, "CurrentBaselineBudgetMarginVariancePercentage": 0, "OriginalBaselineBudgetMarginVariance": 0, "OriginalBaselineBudgetMarginVariancePercentage": 0, "CurrentForecastMarginVariance": 0, "CurrentForecastMarginVariancePercentage": 0, "PreviousForecastMarginVariance": 0, "PreviousForecastMarginVariancePercentage": 0, "Margin": null, "MarginPercentage": null, "PlanningOptionId": 300100185594192, "PlanningResources": { "items": [ { "PlanningElementId": 300100185594175, "TaskId": 100100048827366, "TaskNumber": "1.0", "TaskName": "Schematic Design Phase", "RbsElementId": 100100048827359, "ResourceName": "Labor", "UnitOfMeasure": "Hours", "ResourceClass": "Labor", "PlanningStartDate": "2011-12-31T18:30:00+00:00", "PlanningEndDate": "2015-12-30T18:30:00+00:00", "PlanningAmounts": { "items": [ { "PlanLineId": 300100185594176, "TotalCommittedQuantity": null, "ActualQuantity": null, "ETCQuantity": 10, "EACQuantity": 10, "Currency": "USD", "TotalCommittedRawCost": null, "ActualRawCost": null, "ETCRawCost": 1000, "EACRawCost": 1000, "StandardETCRawCostRate": null, "EffectiveETCRawCostRate": 100, "ActualRawCostRate": 0, "EACRawCostRate": 100, "TotalCommittedBurdenedCost": null, "ActualBurdenedCost": null, "ETCBurdenedCost": 2500, "EACBurdenedCost": 2500, "StandardETCBurdenedCostRate": null, "EffectiveETCBurdenedCostRate": 250, "ActualBurdenedCostRate": 0, "EACBurdenedCostRate": 250, "RequisitionCommittedQuantity": null, "PurchaseOrderCommittedQuantity": null, "SupplierInvoiceCommittedQuantity": null, "TransferOrderCommittedQuantity": null, "RequisitionCommittedRawCost": null, "PurchaseOrderCommittedRawCost": null, "SupplierInvoiceCommittedRawCost": null, "TransferOrderCommittedRawCost": null, "RequisitionCommittedBurdenedCost": null, "PurchaseOrderCommittedBurdenedCost": null, "SupplierInvoiceCommittedBurdenedCost": null, "TransferOrderCommittedBurdenedCost": null, "TotalCommittedRawCostInProjectCurrency": 0, "ActualRawCostInProjectCurrency": null, "ETCRawCostInProjectCurrency": null, "EACRawCostInProjectCurrency": null, "RequisitionCommittedRawCostInProjectCurrency": null, "PurchaseOrderCommittedRawCostInProjectCurrency": null, "SupplierInvoiceCommittedRawCostinProjectCurrency": null, "TransferOrderCommittedRawCostInProjectCurrency": null, "TotalCommittedRawCostInProjectLedgerCurrency": 0, "ActualRawCostInProjectLedgerCurrency": null, "ETCRawCostInProjectLedgerCurrency": null, "EACRawCostInProjectLedgerCurrency": null, "RequisitionCommittedRawCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedRawCostinProjectLedgerCurrency": null, "TransferOrderCommittedRawCostInProjectLedgerCurrency": null, "TotalCommittedBurdenedCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": 0, "EACBurdenedCostInProjectCurrency": null, "RequisitionCommittedBurdenedCostInProjectCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectCurrency": null, "SupplierInvoiceCommittedBurdenedCostinProjectCurrency": null, "TransferOrderCommittedBurdenedCostInProjectCurrency": null, "TotalCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualBurdenedCostInProjectLedgerCurrency": null, "ETCBurdenedCostInProjectLedgerCurrency": 0, "EACBurdenedCostInProjectLedgerCurrency": null, "RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedBurdenedCostinProjectLedgerCurrency": null, "TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualRevenue": null, "ETCRevenue": 0, "EACRevenue": null, "StandardETCRevenueRate": null, "EffectiveETCRevenueRate": null, "ActualRevenueRate": 0, "EACRevenueRate": 0, "ActualRevenueInProjectCurrency": null, "ETCRevenueInProjectCurrency": 0, "EACRevenueInProjectCurrency": null, "ActualRevenueInProjectLedgerCurrency": null, "ETCRevenueInProjectLedgerCurrency": 0, "EACRevenueInProjectLedgerCurrency": null, "PlanningAmountDetails": { "items": [ { "PlanLineDetailId": 300100185594177, "TotalCommittedQuantity": null, "ActualQuantity": null, "ETCQuantity": 10, "EACQuantity": 10, "PeriodName": "Dec-19", "TotalCommittedRawCost": null, "ActualRawCost": null, "ETCRawCost": 1000, "EACRawCost": 1000, "StandardETCRawCostRate": null, "EffectiveETCRawCostRate": 100, "ActualRawCostRate": 0, "EACRawCostRate": 100, "TotalCommittedBurdenedCost": null, "ActualBurdenedCost": null, "ETCBurdenedCost": 2500, "EACBurdenedCost": 2500, "StandardETCBurdenedCostRate": null, "EffectiveETCBurdenedCostRate": 250, "ActualBurdenedCostRate": 0, "EACBurdenedCostRate": 250, "RequisitionCommittedQuantity": null, "PurchaseOrderCommittedQuantity": null, "SupplierInvoiceCommittedQuantity": null, "TransferOrderCommittedQuantity": null, "RequisitionCommittedRawCost": null, "PurchaseOrderCommittedRawCost": null, "SupplierInvoiceCommittedRawCost": null, "TransferOrderCommittedRawCost": null, "RequisitionCommittedBurdenedCost": null, "PurchaseOrderCommittedBurdenedCost": null, "SupplierInvoiceCommittedBurdenedCost": null, "TransferOrderCommittedBurdenedCost": null, "TotalCommittedRawCostInProjectCurrency": 0, "ActualRawCostInProjectCurrency": null, "ETCRawCostInProjectCurrency": null, "EACRawCostInProjectCurrency": null, "RequisitionCommittedRawCostInProjectCurrency": null, "PurchaseOrderCommittedRawCostInProjectCurrency": null, "SupplierInvoiceCommittedRawCostInProjectCurrency": null, "TransferOrderCommittedRawCostInProjectCurrency": null, "TotalCommittedRawCostInProjectLedgerCurrency": 0, "ActualRawCostInProjectLedgerCurrency": null, "ETCRawCostInProjectLedgerCurrency": null, "EACRawCostInProjectLedgerCurrency": null, "RequisitionCommittedRawCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedRawCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedRawCostInProjectLedgerCurrency": null, "TransferOrderCommittedRawCostInProjectLedgerCurrency": null, "TotalCommittedBurdenedCostInProjectCurrency": null, "ActualBurdenedCostInProjectCurrency": null, "ETCBurdenedCostInProjectCurrency": 0, "EACBurdenedCostInProjectCurrency": null, "RequisitionCommittedBurdenedCostInProjectCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectCurrency": null, "SupplierInvoiceCommittedBurdenedCostInProjectCurrency": null, "TransferOrderCommittedBurdenedCostInProjectCurrency": null, "TotalCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualBurdenedCostInProjectLedgerCurrency": null, "ETCBurdenedCostInProjectLedgerCurrency": 0, "EACBurdenedCostInProjectLedgerCurrency": null, "RequisitionCommittedBurdenedCostInProjectLedgerCurrency": null, "PurchaseOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "SupplierInvoiceCommittedBurdenedCostInProjectLedgerCurrency": null, "TransferOrderCommittedBurdenedCostInProjectLedgerCurrency": null, "ActualRevenue": null, "ETCRevenue": 0, "EACRevenue": null, "StandardETCRevenueRate": null, "EffectiveETCRevenueRate": null, "ActualRevenueRate": 0, "EACRevenueRate": 0, "ActualRevenueInProjectCurrency": null, "ETCRevenueInProjectCurrency": 0, "EACRevenueInProjectCurrency": null, "ActualRevenueInProjectLedgerCurrency": null, "ETCRevenueInProjectLedgerCurrency": 0, "EACRevenueInProjectLedgerCurrency": null, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176/child/PlanningAmountDetails/300100185594177", "name": "PlanningAmountDetails", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176/child/PlanningAmountDetails/300100185594177", "name": "PlanningAmountDetails", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176", "name": "PlanningAmounts", "kind": "item" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176", "name": "PlanningAmounts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176", "name": "PlanningAmounts", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175", "name": "PlanningResources", "kind": "item" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176/child/PlanLinesDFF", "name": "PlanLinesDFF", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts/300100185594176/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts", "name": "PlanningAmounts", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175", "name": "PlanningResources", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175", "name": "PlanningResources", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/lov/PrimaryPlanningRBSLOVVO", "name": "PrimaryPlanningRBSLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/lov/FinancialTaskVersionLOVVO", "name": "FinancialTaskVersionLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources/300100185594175/child/PlanningAmounts", "name": "PlanningAmounts", "kind": "collection" } ], } ], "count": 1, "hasMore": false, "limit": 24, "offset": 0, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources", "name": "PlanningResources", "kind": "collection" } ], }, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174", "name": "projectForecasts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000278" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174", "name": "projectForecasts", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/lov/ProjectLOVVO", "name": "ProjectLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/lov/ForecastCreationMethodLOVVO", "name": "ForecastCreationMethodLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/lov/FinancialPlanTypesLOVVO", "name": "FinancialPlanTypesLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/lov/ForecastGenerationSourceLOVVO", "name": "ForecastGenerationSourceLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningOptions", "name": "PlanningOptions", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/PlanningResources", "name": "PlanningResources", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185594174/child/VersionErrors", "name": "VersionErrors", "kind": "collection" } ], } } ], }
Example 3
The following example shows how to create project forecast versions.
curl --user ppm_cloud_user -X POST -H "Content-Type: application/vnd.oracle.adf.resourceitem+json" -d @example_request_payload.json "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts" -H 'cache-control: no-cache'
Example 3 Request Body
The following shows an example of the request body in JSON format.
{ "FinancialPlanType": "Cost and Revenue Together", "PlanVersionName": "Generate from Project Resources REST", "ProjectName": "Project01", "ForecastCreationMethod": "GENERATE", "ForecastGenerationSource": "ORA_PROJECT_RES", "ProjectResourcesStatus": "All", "SourcePlanVersionStatus": "Current Working" }
Example 3 Response Body
The following shows an example of the response body in JSON format.
{ "FinancialPlanType": "Cost and Revenue Together", "PlanningAmounts": "COST_AND_REV_TOGETHER", "PlanVersionId": 300100185530389, "PlanVersionNumber": 1, "PlanVersionName": "Generate from Project Resources REST", "PlanVersionDescription": null, "PlanVersionStatus": "Current Working", "ProjectId": 300100172449437, "ProjectNumber": "Project01", "ProjectName": "Project01", "ForecastCreationMethod": "GENERATE", "SourcePlanVersionId": null, "ForecastGenerationSource": "ORA_PROJECT_RES", "SourcePlanType": null, "SourcePlanVersionStatus": "Current Working", "SourcePlanVersionNumber": null, "LockedFlag": "false", "LockedBy": null, "CopyAdjustmentPercentage": null, "PCRawCostAmounts": null, "PCBurdenedCostAmounts": null, "PCRevenueAmounts": null, "PFCRawCostAmounts": null, "PFCBurdenedCostAmounts": null, "PFCRevenueAmounts": null, "DeferFinancialPlanCreation": "N", "AdministrativeCode": null, "ProjectResourcesStatus": "All", "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389", "name": "projectBudgets", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000003737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389", "name": "projectBudgets", "kind": "item" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389/lov/ProjectResourcesStatusLOVVO", "name": "ProjectResourcesStatusLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389/lov/ProjectLOVVO", "name": "ProjectLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389/lov/BudgetGenerationSourceLOVVO", "name": "BudgetGenerationSourceLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389/lov/FinancialPlanTypesLOVVO", "name": "FinancialPlanTypesLOVVO", "kind": "collection" }, { "rel": "lov", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389/lov/BudgetCreationMethodLOVVO", "name": "BudgetCreationMethodLOVVO", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389/child/PlanningResources", "name": "PlanningResources", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100185530389/child/VersionErrors", "name": "VersionErrors", "kind": "collection" } ] }