Why is burden cost missing on a transaction?
Burden costs aren't applied to a transaction if either of these situations exist:
-
The expenditure type associated with the transaction isn't assigned to a cost base.
-
The project type for the project isn't enabled for burden calculation. In this situation, raw cost is equal to burdened cost.