Get all financial project plan versions
get
/fscmRestApi/resources/11.13.18.05/financialProjectPlans
Request
Query Parameters
- expand: string When this parameter is provided, the specified children are included in the resource payload (instead of just a link). The value of this query parameter is "all" or "". More than one child can be specified using comma as a separator. Example: ?expand=Employees,Localizations. Nested children can also be provided following the format "Child.NestedChild" (Example: ?expand=Employees.Managers). If a nested child is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?expand=Employees.Managers" is the same as "?expand=Employees,Employees.Managers" (which will expand Employees and Managers).
- fields: string This parameter filters the resource fields. Only the specified fields are returned, which means that if no fields are specified, no fields are returned (useful to get only the links). If an indirect child resource is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?fields=Employees.Managers:Empname" is the same as "?fields=;Employees:;Employees.Managers:Empname" (which will only return the "Empname" field for Managers). the value of this query parameter is a list of resource fields. The attribute can be a direct (Example: Employees) or indirect (Example: Employees.Managers) child. It cannot be combined with expand query parameter. If both are provided, only fields will be considered.
Format: ?fields=Attribute1,Attribute2
Format for fields in child resource: ?fields=Accessor1:Attribute1,Attribute2 - finder: string Used as a predefined finder to search the collection.
Format: ?finder=<finderName>;<variableName>=<variableValue>,<variableName2>=<variableValue2>
The following are the available finder names and corresponding finder variables:- PrimaryKey: Finds the financial project plan version.
Finder Variables:- PlanVersionId; integer; Identifier of the financial project plan version.
- PrimaryKey: Finds the financial project plan version.
- limit: integer This parameter restricts the number of resources returned inside the resource collection. If the limit exceeds the resource count then the framework will only return the available resources.
- links: string This parameter can be used to show only certain links while accessing a singular resource or a resource collection. The parameter value format is a comma-separated list of : <link_relation>
Example:
self,canonical - offset: integer Used to define the starting position of the resource collection. If offset exceeds the resource count then no resources are returned. Default value is 0.
- onlyData: boolean The resource item payload will be filtered in order to contain only data (no links section, for example).
- orderBy: string This parameter orders a resource collection based on the specified fields. The parameter value is a comma-separated string of attribute names, each optionally followed by a colon and "asc" or "desc". Specify "asc" for ascending and "desc" for descending. The default value is "asc". For example, ?orderBy=field1:asc,field2:desc
- q: string This query parameter defines the where clause. The resource collection will be queried using the provided expressions. The value of this query parameter is one or more expressions. Example: ?q=Deptno>=10 and <= 30;Loc!=NY
Format: ?q=expression1;expression2
You can use these queryable attributes to filter this collection resource using the q query parameter:- BaselineBurdenedCostInProjectCurrency; number; Total planned cost for the project, including raw and burden costs, in project currency in the baseline financial project plan version.
- BaselineBurdenedCostInProjectLedgerCurrency; number; Total planned cost for the project, including raw and burden costs, in project ledger currency in the baseline financial project plan version.
- BaselineEffort; number; Measure of the effort planned in the baseline financial project plan version, expressed in hours.
- BaselineRawCostInProjectCurrency; number; Planned cost for the project in project currency in the baseline financial project plan version that corresponds to the work performed.
- BaselineRawCostInProjectLedgerCurrency; number; Planned cost for the project in project ledger currency in the baseline financial project plan version that corresponds to the work performed.
- BaselineRevenueInProjectCurrency; number; Planned revenue for the project, in project currency, in the baseline financial project plan version that corresponds to the work performed.
- BaselineRevenueInProjectLedgerCurrency; number; Planned revenue for the project, in project ledger currency, in the baseline financial project plan version that corresponds to the work performed.
- BurdenedCostInProjectCurrency; number; Total planned cost for the project in project currency that includes both raw and burden costs.
- BurdenedCostInProjectLedgerCurrency; number; Total planned cost for the project in project ledger currency that includes both raw and burden costs.
- ITDActualBurdenedCostInProjectCurrency; number; Actual cost incurred for the project, including raw and burden costs, in project currency from the start date of the project till the current date.
- ITDActualBurdenedCostInProjectLedgerCurrency; number; Actual cost incurred for the project, including raw and burden costs, in project ledger currency from the start date of the project till the current date.
- ITDActualEffort; number; Actual effort for the project from the start of the project till the current date, expressed in hours.
- ITDActualRawCostInProjectCurrency; number; Actual cost incurred for the project in project currency that corresponds to the work performed from the start date of the project till the current date.
- ITDActualRawCostInProjectLedgerCurrency; number; Actual cost incurred for the project in project ledger currency that corresponds to the work performed from the start date of the project till the current date.
- ITDActualRevenueInProjectCurrency; number; Actual revenue incurred for the project, in project currency, that corresponds to the work performed from the start date of the project till the current date.
- ITDActualRevenueInProjectLedgerCurrency; number; Actual revenue incurred for the project, in project ledger currency, that corresponds to the work performed from the start date of the project till the current date.
- Margin; number; The difference between costs and revenue amounts.
- MarginPercentage; number; The difference between costs and revenue amounts, expressed as a percentage.
- PlanVersionId; integer; Identifier of the financial project plan version.
- PlanVersionStatus; string; Indicates the status of the financial project plan version. Valid values are Current Working, Processing, and Failed.
- PlannedEffort; number; Measure of the effort planned for in the financial project plan version, expressed in hours.
- ProjectId; integer; Identifier of the project for which the financial project plan is created. You must enter either Project Name or Project Number but not for all three or a combination of them while creating a financial project plan.
- ProjectName; string; Name of the project for which the financial project plan is created. You must enter either Project ID or Project Number but not for all three or a combination of them while creating a financial project plan.
- ProjectNumber; string; Number of the project for which the financial project plan is created. You must enter either Project ID or Project Name but not for all three or a combination of them while creating a financial project plan.
- ProjectPlanType; string; Name of the project plan type from which the financial project plan is created.
- RawCostInProjectCurrency; number; Planned cost for the project in project currency that corresponds to the work performed.
- RawCostInProjectLedgerCurrency; number; Planned cost for the project in project ledger currency that corresponds to the work performed.
- RevenueInProjectCurrency; number; The estimated revenue for the project at the completion of the project in project currency.
- RevenueInProjectLedgerCurrency; number; The estimated revenue for the project at the completion of the project in project ledger currency.
- totalResults: boolean The resource collection representation will include the "estimated row count" when "?totalResults=true", otherwise the count is not included. The default value is "false".
Header Parameters
- Metadata-Context: string If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: string The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
Default Response
The following table describes the default response for this task.
Headers
- Metadata-Context: If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Root Schema : financialProjectPlans
Type:
Show Source object- count(required): integer The number of resource instances returned in the current range.
- hasMore(required): boolean Indicates whether more resources are available on the server than the subset returned in the response. If the value is true, then there are more resources to retrieve from the server. The default value is false.
- items: array Items Title:
ItemsThe items in the collection. - limit(required): integer The actual paging size used by the server.
- links(required): array Links Title:
LinksThe link relations associated with the resource instance. - offset(required): integer The offset value used in the current page.
- totalResults: integer The estimated row count when "?totalResults=true", otherwise the count is not included.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : financialProjectPlans-item-response
Type:
Show Source object- BaselineBurdenedCostInProjectCurrency: number Title:
Rolled-up Baseline Cost for Resource in Project CurrencyRead Only:trueTotal planned cost for the project, including raw and burden costs, in project currency in the baseline financial project plan version. - BaselineBurdenedCostInProjectLedgerCurrency: number Title:
Burdened Cost in Project Ledger CurrencyRead Only:trueTotal planned cost for the project, including raw and burden costs, in project ledger currency in the baseline financial project plan version. - BaselineEffort: number Title:
BaselineRead Only:trueMeasure of the effort planned in the baseline financial project plan version, expressed in hours. - BaselineRawCostInProjectCurrency: number Title:
Rolled-up Baseline Cost for Resource in Project CurrencyRead Only:truePlanned cost for the project in project currency in the baseline financial project plan version that corresponds to the work performed. - BaselineRawCostInProjectLedgerCurrency: number Title:
Baseline Cost in Project Ledger CurrencyRead Only:truePlanned cost for the project in project ledger currency in the baseline financial project plan version that corresponds to the work performed. - BaselineRevenueInProjectCurrency: number Title:
Baseline Revenue in Project CurrencyRead Only:truePlanned revenue for the project, in project currency, in the baseline financial project plan version that corresponds to the work performed. - BaselineRevenueInProjectLedgerCurrency: number Title:
Baseline Revenue in Project Ledger CurrencyRead Only:truePlanned revenue for the project, in project ledger currency, in the baseline financial project plan version that corresponds to the work performed. - BurdenedCostInProjectCurrency: number Title:
Burdened Cost in Project Currency: TotalRead Only:trueTotal planned cost for the project in project currency that includes both raw and burden costs. - BurdenedCostInProjectLedgerCurrency: number Title:
Burdened Cost in Project Ledger Currency: TotalRead Only:trueTotal planned cost for the project in project ledger currency that includes both raw and burden costs. - DeferProcessing: string Title:
Defer ProcessingIndicates that the financial project plan version will be managed in a deferred mode. - ITDActualBurdenedCostInProjectCurrency: number Title:
Burdened Cost in Project Currency: TotalRead Only:trueActual cost incurred for the project, including raw and burden costs, in project currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectLedgerCurrency: number Title:
ITD Actual in Project Ledger CurrencyRead Only:trueActual cost incurred for the project, including raw and burden costs, in project ledger currency from the start date of the project till the current date. - ITDActualEffort: number Title:
ITD Actual EffortRead Only:trueActual effort for the project from the start of the project till the current date, expressed in hours. - ITDActualRawCostInProjectCurrency: number Title:
ITD Actual in Project CurrencyRead Only:trueActual cost incurred for the project in project currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectLedgerCurrency: number Title:
ITD Actual in Project Ledger CurrencyRead Only:trueActual cost incurred for the project in project ledger currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectCurrency: number Title:
ITD Actual Revenue in Project CurrencyRead Only:trueActual revenue incurred for the project, in project currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectLedgerCurrency: number Title:
ITD Actual Revenue in Project Ledger CurrencyRead Only:trueActual revenue incurred for the project, in project ledger currency, that corresponds to the work performed from the start date of the project till the current date. - links: array Links Title:
LinksThe link relations associated with the resource instance. - Margin: number Title:
MarginRead Only:trueThe difference between costs and revenue amounts. - MarginPercentage: number Title:
Margin PercentageRead Only:trueThe difference between costs and revenue amounts, expressed as a percentage. - PlannedEffort: number Title:
Project Plan EffortRead Only:trueMeasure of the effort planned for in the financial project plan version, expressed in hours. - PlanningOptions: array Planning Options Title:
Planning OptionsThe Planning Options resource is used to view the planning options configured for the financial project plan version. Planning options are user-definable options, that include plan settings, rate settings, currency settings, and generation options, and are used to control planning scenarios. Financial project plan versions inherit planning options that are defined for the project plan type that's associated to the project. - PlanVersionId: integer (int64) Title:
Plan VersionIdentifier of the financial project plan version. - PlanVersionStatus: string Title:
Plan Version StatusRead Only:trueIndicates the status of the financial project plan version. Valid values are Current Working, Processing, and Failed. - ProjectId: integer (int64) Title:
Project IDIdentifier of the project for which the financial project plan is created. You must enter either Project Name or Project Number but not for all three or a combination of them while creating a financial project plan. - ProjectName: string Title:
Project NameRead Only:trueMaximum Length:240Name of the project for which the financial project plan is created. You must enter either Project ID or Project Number but not for all three or a combination of them while creating a financial project plan. - ProjectNumber: string Title:
Project NumberRead Only:trueMaximum Length:25Number of the project for which the financial project plan is created. You must enter either Project ID or Project Name but not for all three or a combination of them while creating a financial project plan. - ProjectPlanType: string Title:
Financial Plan TypeRead Only:trueMaximum Length:240Name of the project plan type from which the financial project plan is created. - RawCostInProjectCurrency: number Title:
Raw Cost in Project Currency: TotalRead Only:truePlanned cost for the project in project currency that corresponds to the work performed. - RawCostInProjectLedgerCurrency: number Title:
Raw Cost in Project Ledger Currency: TotalRead Only:truePlanned cost for the project in project ledger currency that corresponds to the work performed. - ResourceAssignments: array Resource Assignments Title:
Resource AssignmentsThe Resource Assignments resource is used to view, create, update, and delete a financial project plan resource assignment. - RevenueInProjectCurrency: number Title:
Revenue in Project CurrencyRead Only:trueThe estimated revenue for the project at the completion of the project in project currency. - RevenueInProjectLedgerCurrency: number Title:
Revenue in Project Ledger CurrencyRead Only:trueThe estimated revenue for the project at the completion of the project in project ledger currency. - VersionErrors: array Plan Version Errors Title:
Plan Version ErrorsThe Version Errors resource is used to view the errors in a financial project plan resource assignment.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : Planning Options
Type:
arrayTitle:
Planning OptionsThe Planning Options resource is used to view the planning options configured for the financial project plan version. Planning options are user-definable options, that include plan settings, rate settings, currency settings, and generation options, and are used to control planning scenarios. Financial project plan versions inherit planning options that are defined for the project plan type that's associated to the project.
Show Source Nested Schema : Resource Assignments
Type:
arrayTitle:
Resource AssignmentsThe Resource Assignments resource is used to view, create, update, and delete a financial project plan resource assignment.
Show Source Nested Schema : Plan Version Errors
Type:
arrayTitle:
Plan Version ErrorsThe Version Errors resource is used to view the errors in a financial project plan resource assignment.
Show Source Nested Schema : link
Type:
Show Source object- href: string Title:
hyperlink referenceThe URI to the related resource. - kind: string Title:
kindAllowed Values:[ "collection", "item", "describe", "other" ]The kind of the related resource. - name: string Title:
nameThe name of the link to the related resource. - properties: object properties
- rel: string Title:
relationAllowed Values:[ "self", "lov", "parent", "canonical", "child", "enclosure", "action", "custom" ]The name of the relation to the resource instance. Example: self.
Nested Schema : properties
Type:
Show Source object- changeIndicator: string Change indicator or the ETag value of the resource instance.
Nested Schema : financialProjectPlans-PlanningOptions-item-response
Type:
Show Source object- AllowNegativeETCCalculationFlag: boolean Title:
Allow Negative ETC CalculationMaximum Length:1Indicates whether estimate-to-complete values can be lesser than zero. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - AssociateProjectCostsToSummaryTaskAssignmentsFlag: boolean Title:
Associate project costs to summary task assignmentsMaximum Length:1Indicates whether project costs for a resource assignment from a lowest level task can be associated to a planned resource assignment on the financial project plan at a higher level in the task structure. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - AutoApproveFlag: boolean Title:
Automatically approve forecastMaximum Length:1Indicates if the forecast that's created using the financial plan type is automatically approved. - AutoBaselineFlag: boolean Title:
Automatically designate budget version as baselineMaximum Length:1Indicates if the budget that's created using the financial plan type is automatically set to baseline. - AutomaticallyGenerateBudgetVersionFlag: boolean Title:
Automatically Generate Budget VersionMaximum Length:1Indicates if a budget is being created using the financial plan type while baseline of the financial project plan. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - AutomaticallyGenerateForecastVersionFlag: boolean Title:
Automatically generate forecast versionMaximum Length:1Indicates if a forecast is being created using the financial plan type while publishing progress. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - BudgetFinancialPlanType: string Title:
Budget Financial Plan TypeRead Only:trueMaximum Length:255The name of the financial plan type that's used to create the budget version. - BufferForSynchronizeTaskTransactionDatesWithTaskPlannedDates: number Title:
Buffer for Synchronize Task Transaction Dates with Task Planned DatesBuffer value to adjust the task transaction dates to be changed along with the task planned dates. - BurdenScheduleCostOptions: string Title:
Burden ScheduleMaximum Length:255A set of burden multipliers that's maintained for use across projects. Also referred to as a standard burden schedule. - CalendarType: string Title:
Calendar TypeMaximum Length:255The type of calendar, such as accounting calendar or project accounting calendar, used for entering and displaying periodic financial information. - CurrentPlanningPeriod: string Title:
Current Planning PeriodMaximum Length:15Current planning period that drives the display of the periodic information. It can be the project accounting period or accounting period depending on the selected calendar type. This value isn't applicable when the calendar type is set to NONE. - DateTypeForConversionInPC: string Title:
Project Currency Conversion: Cost Date TypeMaximum Length:255Date type that's used as a cost conversion attribute for project currency. - DateTypeForConversionInPLC: string Title:
Project Ledger Currency Conversion: Cost Date TypeMaximum Length:255Date type that's used as a cost conversion attribute for project ledger currency. - DateTypeForCostConversion: string Title:
Date Type for Cost ConversionMaximum Length:255Date type that's used as a cost conversion attribute for planning currencies. - DateTypeForRevenueConversion: string Title:
Date Type for Revenue ConversionRead Only:trueMaximum Length:255Date type that's used as a revenue conversion attribute for planning currencies. - EnableCostsForPlanFlag: boolean Title:
Enable Costs for PlanMaximum Length:1Indicates whether resource assignments can be created on the project and allow capturing costs for the project. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - EnableRevenueForPlanFlag: boolean Title:
Enable Revenue for PlanMaximum Length:1Indicates whether resource assignments can be created on the project and allow planning revenue for the project. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - EstimateToCompleteMethod: string Title:
Estimate to Complete MethodMaximum Length:30Calculates estimate-to-complete value for the task and task assignment. The valid values are Remaining Plan and Manual Entry. - FixedDateForConversionInPC: string (date-time) Title:
Project Currency Conversion: Cost Fixed DateThe date that's used to derive conversion rates for calculating planned costs for project currency. - FixedDateForConversionInPLC: string (date-time) Title:
Project Ledger Currency Conversion: Cost Fixed DateThe date that's used to derive conversion rates for calculating planned costs for project ledger currency. - FixedDateForCostConversion: string (date-time) Title:
Fixed Date for Cost ConversionThe date that's used to derive conversion rates for calculating planned costs for planning currencies. - FixedDateForRevenueConversion: string (date-time) Title:
Fixed Date for Revenue ConversionThe date that's used to derive rates for calculating planned revenue for planning currencies. - ForecastFinancialPlanType: string Title:
Forecast Financial Plan TypeRead Only:trueMaximum Length:255The name of the financial plan type that's used to create the forecast version. - JobCostOptions: string Title:
Job Cost OptionsRead Only:trueMaximum Length:255Rate schedule used for the calculation of cost amounts for jobs. - JobRevenueOptions: string Title:
Job Revenue OptionsMaximum Length:255Rate schedule that's used for calculation of revenue amounts for jobs. - links: array Links Title:
LinksThe link relations associated with the resource instance. - MaintainManualSpreadOnDateChanges: string Title:
Maintain manual spread on date changesMaximum Length:1Indicates whether the periodic planning is retained in the plan version on plan line date modifications. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - MultipleTransactionCurrencies: string Title:
Multiple Transaction CurrenciesMaximum Length:1Indicates that the plan can use multiple transaction currencies for planning. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - NonlaborResourceCostOptions: string Title:
Nonlabor ResourceMaximum Length:255Rate schedule used for the calculation of cost amounts for non-labor resources. - NonlaborResourceRevenueOptions: string Title:
Nonlabor Resource Revenue OptionsMaximum Length:255Rate schedule that's used for calculation of revenue amounts for non-labor resources. - PeriodProfile: string Title:
Period ProfileMaximum Length:255Defines how time periods are grouped and displayed when editing resource assignment versions. - PersonCostOptions: string Title:
Person Cost OptionsMaximum Length:255Rate schedule used for the calculation of cost amounts for named persons. - PersonRevenueOptions: string Title:
Person Revenue OptionsMaximum Length:255Rate schedule that's used for calculation of revenue amounts for named persons. - PhysicalPercentCompleteCalculationMethod: string Title:
Physical Percent Complete Calculation MethodMaximum Length:30Calculates physical percent complete at the lowest level task. The valid values are Cost, Effort, and Manual Entry. - PlanningCurrencies: array Planning Currencies Title:
Planning CurrenciesThe Planning Currency resource is used to view, create, update, and delete project and planning currencies. - PlanningOptionId: integer (int64) Title:
Planning Option IDUnique identifier of the summary level planning option in the financial project plan version. - PlanningOptionsDFF: array Planning Options Descriptive Flexfields Title:
Planning Options Descriptive FlexfieldsA listing of all the descriptive flexfields available for planning options in the financial project plan version. - PlanningResourceBreakdownStructure: string Title:
Planning Resource Breakdown StructureMaximum Length:255Primary planning resource breakdown structure associated with the project. - PrimaryPhysicalPercentCompleteBasis: string Title:
Primary Physical Percent Complete BasisMaximum Length:30Determines the primary physical percent complete value for summary tasks. The valid values are Cost, Effort, and Manual Entry. - ProjectCurrency: string Title:
Project CurrencyRead Only:trueMaximum Length:15Currency for the project. - ProjectLedgerCurrency: string Title:
Project Ledger CurrencyRead Only:trueMaximum Length:15Project ledger currency for the project. - ProjectRoleCostOptions: string Title:
Project Role Cost OptionsMaximum Length:255Rate schedule used for the calculation of cost amounts for project role. - ProjectRoleRevenueOptions: string Title:
Project Role Revenue OptionsMaximum Length:255Rate schedule that's used for calculation of revenue amounts for project role. - RateDerivationDate: string (date-time) Title:
Rate Derivation DateThe date that's used as the basis for deriving rates for calculating amounts on a None time-phased resource assignment version. - RateDerivationDateType: string Title:
Rate Derivation Date TypeMaximum Length:255The date type, such as system date or fixed date, that's used as the basis for deriving rates for calculating amounts on a None time-phased resource assignment version. - RateTypeForConversionInPC: string Title:
Project Currency Conversion: Cost Rate TypeMaximum Length:255Rate type that's used as a cost conversion attribute for project currency. - RateTypeForConversionInPLC: string Title:
Project Ledger Currency Conversion: Cost Rate TypeMaximum Length:255Rate type that's used as a cost conversion attribute for project ledger currency. - RateTypeForCostConversion: string Title:
Rate Type for Cost ConversionMaximum Length:255Rate type that's used as a cost conversion attribute for planning currencies. - RateTypeForRevenueConversion: string Title:
Rate Type for Revenue ConversionRead Only:trueMaximum Length:255Revenue rate type that's used as a revenue conversion attribute for planning currencies. - ResourceClassCostOptions: string Title:
Resource Class Cost OptionsMaximum Length:255Rate schedule used for the calculation of cost amounts for resource classes. This is used for cost calculation when rates are unavailable in rate schedules for named persons, jobs, or non-labor resources. - ResourceClassRevenueOptions: string Title:
Resource Class Revenue OptionsMaximum Length:255Rate schedule that's used for calculation of revenue amounts for resource classes. This is used for revenue calculation when rates are unavailable in rate schedules for named persons, jobs, or non-labor resources. - RevenueCalculationMethod: string Title:
Revenue Calculation MethodMaximum Length:30Determines whether financial project plan revenue is calculated based on quantity and rates, event amounts, or the spread ratio specified for tasks. - RevenueDateTypeForConversionInPC: string Title:
Revenue Date Type for Conversion in Project CurrencyRead Only:trueMaximum Length:255Date type that's used as a revenue conversion attribute for project currency. - RevenueDateTypeForConversionInPLC: string Title:
Revenue Date Type for Conversion in Project Ledger CurrencyRead Only:trueMaximum Length:255Date type that's used as a revenue conversion attribute for project ledger currency. - RevenueFixedDateForConversionInPC: string (date-time) Title:
Revenue Fixed Date for Conversion in Project CurrencyThe date that's used for calculating planned revenue in project currency. - RevenueFixedDateForConversionInPLC: string (date-time) Title:
Revenue Fixed Date for Conversion in Project Ledger CurrencyThe date that's used for calculating planned revenue in project ledger currency. - RevenueRateTypeForConversionInPC: string Title:
Revenue Rate Type for Conversion in Project CurrencyRead Only:trueMaximum Length:255Revenue rate type that's used as a revenue conversion attribute for project currency. - RevenueRateTypeForConversionInPLC: string Title:
Revenue Rate Type for Conversion in Project Ledger CurrencyRead Only:trueMaximum Length:255Revenue rate type that's used as a revenue conversion attribute for project ledger currency. - RollUpTaskDatesFlag: boolean Title:
Roll Up Task DatesMaximum Length:1Indicates whether summary task dates are rolled up from the lowest level task dates. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - SetUnplannedAssignmentsAsPlannedAssignmentsFlag: boolean Title:
Set unplanned assignments as planned assignmentsMaximum Length:1Indicates whether resource assignments can be created as planned on the project on incurring costs for the project. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - SynchronizeTaskTransactionDatesWithTaskPlannedDatesFlag: boolean Title:
Synchronize Task Transaction Dates with Task Planned DatesMaximum Length:1Indicates whether task transaction dates are synchronized with task planned dates. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - ThirdPartySchedulingFlag: boolean Title:
Third Party SchedulingMaximum Length:1Indicates that the plan can use a third-party scheduling tool. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - UpdatePlannedQuantityWithEACQuantityFlag: boolean Title:
Update planned quantity with EAC quantityMaximum Length:1Indicates whether planned values for task assignments can be updated with estimate-at-completion values while publishing progress. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected. - UsePlanningRatesFlag: boolean Title:
Use Planning RatesMaximum Length:1Enables utilization of planning rates for resources and resource classes when calculating resource assignment amounts. - UseSameConversionAttributeForAllCurrencyConversionsFlag: boolean Title:
Use Same Conversion Attribute for All Currency ConversionsIndicates whether you can use the same currency conversion attribute for all currencies. - UseSameDatesForTaskAssignmentsAsTaskDatesFlag: boolean Title:
Use Same Dates for Task Assignments as Task DatesMaximum Length:1Indicates whether you can use the same dates for the task assignments as the task dates. A value of Y indicates that the attribute is selected. A value of N indicates that the attribute isn't selected.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : Planning Currencies
Type:
arrayTitle:
Planning CurrenciesThe Planning Currency resource is used to view, create, update, and delete project and planning currencies.
Show Source Nested Schema : Planning Options Descriptive Flexfields
Type:
arrayTitle:
Planning Options Descriptive FlexfieldsA listing of all the descriptive flexfields available for planning options in the financial project plan version.
Show Source Nested Schema : financialProjectPlans-PlanningOptions-PlanningCurrencies-item-response
Type:
Show Source object- links: array Links Title:
LinksThe link relations associated with the resource instance. - PlanningCurrencyCode: string Title:
Planning Currency CodeMaximum Length:15Currency code for the planning currency. - PlanningCurrencyId: integer (int64) Title:
Planning Currency IDIdentifier of the planning currency.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : financialProjectPlans-PlanningOptions-PlanningOptionsDFF-item-response
Type:
Show Source object- __FLEX_Context: string Title:
Context SegmentMaximum Length:30Code that identifies the context for the segments of the planning options flexfields. - __FLEX_Context_DisplayValue: string Title:
Context SegmentName of the context for the segments of the planning options flexfields. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PlanningOptionId: integer (int64) Unique identifier of the summary level planning option in the financial project plan version.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : financialProjectPlans-ResourceAssignments-item-response
Type:
Show Source object- AdministrativeCode: string Title:
Administrative CodeAction identifier used for administrative purpose only. - BaselineFinishDate: string (date-time) Title:
Baseline Finish DateRead Only:trueThe date that is planned on the baseline financial project plan for a resource to finish their assignment on a project task. - BaselineStartDate: string (date-time) Title:
Baseline Start DateRead Only:trueThe date that is planned on the baseline financial project plan for a resource to begin their assignment on a project task. - links: array Links Title:
LinksThe link relations associated with the resource instance. - MaintainManualSpreadOnDateChanges: string Default Value:
NIndicates whether the periodic planning is retained in the plan version on plan line date modifications. - PlanningAmounts: array Planning Amounts Title:
Planning AmountsThe Planning Amounts resource is used to view, create, update, and delete a financial project plan resource assignment amounts. - PlanningElementId: integer (int64) Identifier of the resource assignment on the financial project plan version.
- PlanningFinishDate: string (date-time) Title:
Planning Dates: To DateThe date that is planned on the financial project plan for a resource to finish their assignment on a project task. - PlanningStartDate: string (date-time) Title:
Planning Dates: From DateThe date that is planned on the financial project plan for a resource to begin their assignment on a project task. - RateBasedFlag: boolean Title:
Rate-Based Planning ResourceRead Only:trueIndicates if the financial project plan resource assignment is rate based. - RbsElementId: integer (int64) Identifier of the resource breakdown structure element used to create the financial project plan resource assignments line.
- ResourceClass: string Read Only:
trueMaximum Length:240Grouping of predefined resource types to which the resource in the financial project plan resource assignment belongs. A list of valid values are Labor, Equipment, Material Items, and Financial Resources. - ResourceName: string Title:
Resource NameMaximum Length:240Name or alias of the resource included in the planning resource breakdown structure that is used to create the financial project plan resource assignment. - SpreadCurve: string Title:
Spread CurveRead Only:trueMaximum Length:240Name of the set of distribution factors that enables the application to automatically distribute quantity and cost for a resource on a task assignment across a range of accounting or project accounting periods. - TaskId: integer (int64) Title:
Task IDIdentifier of the task for which a financial project plan resource assignment is created. You must enter either Task Name or Task Number but not for all three or a combination of them while creating a financial project plan resource assignment. - TaskName: string Title:
Task NameMaximum Length:255Name of the task for which a financial project plan resource assignment is created. You must enter either Task ID or Task Number but not for all three or a combination of them while creating a financial project plan resource assignment. - TaskNumber: string Title:
Task NumberMaximum Length:100Number of the task for which a financial project plan resource assignment is created. You must enter either Task Name or Task ID but not for all three or a combination of them while creating a financial project plan resource assignment. - UnitOfMeasure: string Title:
NameRead Only:trueMaximum Length:80Unit of work that measures the quantity of effort for which the resource is planned for on the financial project plan resource assignment. - UnplannedFlag: boolean Title:
UnplannedMaximum Length:1Indicates if the financial project plan resource assignment is unplanned. - UseTaskDatesAsTaskAssignmentDatesFlag: boolean Title:
Use Task Planned Dates as Task Assignment DatesIndicates if the resource assignment dates on the task in the financial project plan resource assignment are the same as the task dates on the project.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : Planning Amounts
Type:
arrayTitle:
Planning AmountsThe Planning Amounts resource is used to view, create, update, and delete a financial project plan resource assignment amounts.
Show Source Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-item-response
Type:
Show Source object- BaselineBurdenedCost: number Title:
Baseline Burdened CostRead Only:trueTotal planned cost for the baseline financial project plan resource assignment, including raw and burden costs, in planning currency. - BaselineBurdenedCostInProjectCurrency: number Title:
Rolled-up Baseline Cost for Resource in Project CurrencyRead Only:trueTotal planned cost for the baseline financial project plan resource assignment, including raw and burden costs, in project currency. - BaselineBurdenedCostInProjectLedgerCurrency: number Title:
Baseline Burdened CostRead Only:trueTotal planned cost for the financial project plan resource assignment, including raw and burden costs, in project ledger currency in the baseline financial project plan version. - BaselineCurrency: string Title:
Baseline CurrencyRead Only:trueMaximum Length:30Currency of the rendered baseline amounts. - BaselineQuantity: number Title:
Baseline QuantityRead Only:trueMeasure of the effort planned for the resource assignment in the baseline financial project plan version, expressed in hours. - BaselineRawCost: number Title:
Baseline Raw CostRead Only:truePlanned cost for the project in planning currency in the baseline financial project plan version that corresponds to the work performed. - BaselineRawCostInProjectCurrency: number Title:
Baseline Raw CostRead Only:truePlanned cost for the baseline financial project plan resource assignment in project currency that corresponds to the work performed. - BaselineRawCostInProjectLedgerCurrency: number Title:
Baseline Raw CostRead Only:truePlanned cost for the baseline financial project plan resource assignment in project ledger currency that corresponds to the work performed. - BaselineRevenue: number Title:
Baseline RevenueRead Only:truePlanned revenue for the project, in planning currency, in the baseline financial project plan version that corresponds to the work performed. - BaselineRevenueInProjectCurrency: number Title:
Baseline Revenue in Project CurrencyRead Only:truePlanned revenue for the baseline financial project plan resource assignment, in project currency, that corresponds to the work performed. - BaselineRevenueInProjectLedgerCurrency: number Title:
Baseline Revenue in Project Ledger CurrencyRead Only:truePlanned revenue for the baseline financial project plan resource assignment, in project ledger currency, that corresponds to the work performed. - BurdenedCost: number Title:
Burdened CostTotal planned cost for the financial project plan resource assignment in planning currency that includes both raw and burden costs. - BurdenedCostInProjectCurrency: number Title:
Burdened Cost in Project Currency: TotalRead Only:trueTotal planned cost for the financial project plan resource assignment in project currency that includes both raw and burden costs. - BurdenedCostInProjectLedgerCurrency: number Title:
Burdened Cost in Project Ledger Currency: TotalRead Only:trueTotal planned cost for the financial project plan resource assignment in project ledger currency that includes both raw and burden costs. - Currency: string Title:
CurrencyMaximum Length:15Code that identifies the planning currency on the financial project plan resource assignment. - EffectiveBurdenedCostRate: number Title:
Average Effective Burden Cost RateCost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. - EffectiveRawCostRate: number Title:
Effective Raw Cost RateCost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. - EffectiveRevenueRate: number Title:
Effective Revenue RateRevenue rate that's used to calculate amounts for a financial project plan resource assignment. Revenue amounts can be determined by multiplying the quantity by effective revenue rate. - ITDActualBurdenedCost: number Title:
ITD Actual Burdened CostRead Only:trueActual cost incurred for the financial project plan resource assignment, including raw and burden costs, in planning currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectCurrency: number Title:
ITD Actual Burdened CostRead Only:trueActual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectLedgerCurrency: number Title:
ITD Actual Burdened CostRead Only:trueActual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project ledger currency from the start date of the project till the current date. - ITDActualQuantity: number Title:
ITD Actual QuantityRead Only:trueActual effort for the financial project plan resource assignment from the start of the project till the current date, expressed in hours. - ITDActualRawCost: number Title:
ITD Actual Raw CostRead Only:trueActual cost incurred for the financial project plan resource assignment in planning currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectCurrency: number Title:
ITD Actual Raw CostRead Only:trueActual cost incurred for the financial project plan resource assignment in project currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectLedgerCurrency: number Title:
ITD Actual Raw CostRead Only:trueActual cost incurred for the financial project plan resource assignment in project ledger currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenue: number Title:
ITD Actual RevenueRead Only:trueActual revenue incurred for the financial project plan resource assignment, in planning currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectCurrency: number Title:
ITD Actual Revenue in Project CurrencyRead Only:trueActual revenue incurred for the financial project plan resource assignment, in project currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectLedgerCurrency: number Title:
ITD Actual Revenue in Project Ledger CurrencyRead Only:trueActual revenue incurred for the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed from the start date of the project till the current date. - links: array Links Title:
LinksThe link relations associated with the resource instance. - ManualSpreadFlag: boolean Maximum Length:
1Indicates if the periodic planning is modified and retained for the plan line on date changes. - Margin: number Title:
MarginRead Only:trueThe difference between costs and revenue amounts. - MarginPercentage: number Title:
Margin PercentageRead Only:trueThe difference between costs and revenue amounts, expressed as a percentage. - PlanLineId: integer (int64) Title:
Plan Line IDIdentifier of the summary level planning amounts for a resource assignment in the financial project plan. - PlanLinesDFF: array Plan Lines Descriptive Flexfields Title:
Plan Lines Descriptive FlexfieldsThe Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans. - PlannedQuantity: number Title:
Planned QuantityMeasure of the effort planned for in the financial project plan resource assignment, expressed in hours. - PlanningAmountDetails: array Planning Amount Details Title:
Planning Amount DetailsThe Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts. - RawCost: number Title:
Raw CostPlanned cost for the financial project plan resource assignment in planning currency that corresponds to the work performed. - RawCostInProjectCurrency: number Title:
Raw Cost in Project Currency: TotalRead Only:truePlanned cost for the financial project plan resource assignment in project currency that corresponds to the work performed. - RawCostInProjectLedgerCurrency: number Title:
Raw Cost in Project Ledger CurrencyRead Only:truePlanned cost for the financial project plan resource assignment in project ledger currency that corresponds to the work performed. - Revenue: number Title:
RevenuePlanned revenue for the financial project plan resource assignment, in planning currency, that corresponds to the work performed. - RevenueInProjectCurrency: number Title:
Revenue in Project CurrencyRead Only:truePlanned revenue for the financial project plan resource assignment, in project currency, that corresponds to the work performed. - RevenueInProjectLedgerCurrency: number Title:
Revenue in Project Ledger CurrencyRead Only:truePlanned revenue for the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed. - StandardBurdenedCostRate: number Title:
Standard Burdened Cost RateRead Only:trueAverage rate derived from the rate schedule for calculating the planned burdened cost for the financial project plan resource assignment. - StandardRawCostRate: number Title:
Standard Raw Cost RateRead Only:trueRate derived from the rate schedule for calculating the planned raw cost for the financial project plan resource assignment. - StandardRevenueRate: number Title:
Standard Revenue RateRate derived from the rate schedule for calculating the planned revenue for the financial project plan resource assignment.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : Plan Lines Descriptive Flexfields
Type:
arrayTitle:
Plan Lines Descriptive FlexfieldsThe Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans.
Show Source Nested Schema : Planning Amount Details
Type:
arrayTitle:
Planning Amount DetailsThe Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts.
Show Source Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanLinesDFF-item-response
Type:
Show Source object- __FLEX_Context: string Title:
Context SegmentMaximum Length:30Code that identifies the context for the segments of the plan lines flexfields. - __FLEX_Context_DisplayValue: string Title:
Context SegmentName of the context for the segments of the plan lines flexfields. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PlanLineId: integer (int64) Identifier of the summary level planning amounts for a plan line in the financial project plan.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanningAmountDetails-item-response
Type:
Show Source object- BurdenedCost: number Title:
Planned Burdened CostTotal planned cost for the period in the financial project plan resource assignment in planning currency that includes both raw and burden costs. - BurdenedCostInProjectCurrency: number Title:
Burdened Cost in Project Currency: TotalRead Only:trueTotal planned cost for a period in the financial project plan resource assignment in project currency that includes both raw and burden costs. - BurdenedCostInProjectLedgerCurrency: number Title:
Burdened Cost in Project Ledger Currency: TotalRead Only:trueTotal planned cost for a period in the financial project plan resource assignment in project ledger currency that includes both raw and burden costs. - EffectiveBurdenedCostRate: number Title:
Burdened Cost RateCost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. - EffectiveRawCostRate: number Title:
Effective RateCost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. - EffectiveRevenueRate: number Title:
Effective Revenue RateRevenue rate that's used to calculate amounts for a period in the financial project plan resource assignment. Revenue amounts can be determined by multiplying the quantity by effective revenue rate. - ITDActualBurdenedCost: number Title:
ITD Actual Burdened CostRead Only:trueActual cost incurred for the period in the financial project plan resource assignment, including raw and burden costs, in planning currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectCurrency: number Title:
ITD Actual Burdened CostRead Only:trueActual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectLedgerCurrency: number Title:
ITD Actual in Project Ledger CurrencyRead Only:trueActual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project ledger currency from the start date of the project till the current date. - ITDActualQuantity: number Title:
ITD Actual QuantityRead Only:trueActual effort for the period in the financial project plan resource assignment from the start of the project till the current date, expressed in hours. - ITDActualRawCost: number Title:
ITD Actual Raw CostRead Only:trueActual cost incurred for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectCurrency: number Title:
ITD Actual in Project CurrencyRead Only:trueActual cost incurred for the financial project plan resource assignment in project currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectLedgerCurrency: number Title:
ITD Actual in Project Ledger CurrencyRead Only:trueActual cost incurred for the financial project plan resource assignment in project ledger currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenue: number Title:
ITD Actual RevenueRead Only:trueActual revenue incurred for the period in the financial project plan resource assignment, in planning currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectCurrency: number Title:
ITD Actual Revenue in Project CurrencyRead Only:trueActual revenue incurred for the period in the financial project plan resource assignment, in project currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectLedgerCurrency: number Title:
ITD Actual Revenue in Project Ledger CurrencyRead Only:trueActual revenue incurred for the period in the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed from the start date of the project till the current date. - links: array Links Title:
LinksThe link relations associated with the resource instance. - ManualSpreadFlag: boolean Maximum Length:
1Indicates if the periodic planning is modified and retained for the plan line on date changes. - PeriodName: string Title:
PeriodMaximum Length:30Period for which the periodic level planning amounts are created for a resource assignment in the financial project plan. - PlannedQuantity: number Title:
Planned QuantityMeasure of the effort planned for the period in the financial project plan resource assignment, expressed in hours. - RawCost: number Title:
Raw costPlanned cost for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed. - RawCostInProjectCurrency: number Title:
Raw Cost in Project Currency: TotalRead Only:truePlanned cost for a period in the financial project plan resource assignment in project currency that corresponds to the work performed. - RawCostInProjectLedgerCurrency: number Title:
Raw Cost in Project Ledger Currency: TotalRead Only:truePlanned cost for a period in the financial project plan resource assignment in project ledger currency that corresponds to the work performed. - Revenue: number Title:
RevenuePlanned revenue for the period in the financial project plan resource assignment, in planning currency, that corresponds to the work performed. - RevenueInProjectCurrency: number Title:
Revenue in Project CurrencyRead Only:truePlanned revenue for the period in the financial project plan resource assignment, in project currency, that corresponds to the work performed. - RevenueInProjectLedgerCurrency: number Title:
Revenue in Project Ledger CurrencyRead Only:truePlanned revenue for the period in the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed. - StandardBurdenedCostRate: number Title:
Standard Burdened Cost RateRead Only:trueAverage rate derived from the rate schedule for calculating the planned burdened cost for the period in the financial project plan resource assignment. - StandardRawCostRate: number Title:
Standard Raw Cost RateRead Only:trueRate derived from the rate schedule for calculating the planned raw cost for the period in the financial project plan resource assignment. - StandardRevenueRate: number Title:
Standard Revenue RateRead Only:trueRate derived from the rate schedule for calculating the planned revenue for a period in the financial project plan resource assignment.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : financialProjectPlans-VersionErrors-item-response
Type:
Show Source object- ErrorType: string Title:
Rejection TypeRead Only:trueMaximum Length:30Indicates the type of the exception, for example, Error or Warning. - links: array Links Title:
LinksThe link relations associated with the resource instance. - MessageCause: string Title:
CauseRead Only:trueMaximum Length:4000Reason due to which the error in the financial project version occurred. - MessageName: string Title:
Message NameRead Only:trueMaximum Length:30Name that identifies the message uniquely. - MessageText: string Title:
Message TextRead Only:trueMaximum Length:240Text of the message that indicates the cause and resolution of the error. - MessageUserAction: string Title:
ActionRead Only:trueMaximum Length:4000The action that you must perform to resolve the error. - MessageUserDetails: string Title:
Additional DetailsRead Only:trueMaximum Length:4000Additional information about the cause and resolution of the error. - PeriodName: string Title:
PeriodRead Only:trueMaximum Length:30Period for which errors exist in the financial project plan version. - PlanVersionId: number Title:
Plan VersionRead Only:trueIdentifier of the financial project plan version. - ResourceName: string Title:
ResourceRead Only:trueMaximum Length:240Name or alias name of the resource specified in the planning resource breakdown structure in the financial project plan version that has errors. - TaskName: string Title:
Task NameRead Only:trueMaximum Length:255Name of the task in the financial project plan version that has errors. - TaskNumber: string Title:
Task NumberRead Only:trueMaximum Length:100Number of the task in the financial project plan version that has errors. - TransactionCurrencyCode: string Title:
CurrencyRead Only:trueMaximum Length:15Code that identifies the planning currency in the financial project plan version.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Links
- adjustForRangeOfProjects
- Adjusts the financial project plan versions for a range of projects using the adjustment type and adjustment percentage.
- baselineFinancialProjectPlan
- Operation: /fscmRestApi/resources/11.13.18.05/financialProjectPlans/action/baselineFinancialProjectPlanThis action will set the financial project plan to baseline. Additionally, you can create a budget version and baseline it.
- baselineRangeOfFinancialProjectPlans
- Operation: /fscmRestApi/resources/11.13.18.05/financialProjectPlans/action/baselineRangeOfFinancialProjectPlansSets the baseline financial project plan for a range of projects. Additionally, generates a budget version and baselines it based on the budget generation option specified in the project plan type settings.
- refreshRatesForRangeOfProjects
- Operation: /fscmRestApi/resources/11.13.18.05/financialProjectPlans/action/refreshRatesForRangeOfProjectsRefresh rates on financial project plan versions for a range of projects.
- reprocessFailedFinancialProjectPlans
- Operation: /fscmRestApi/resources/11.13.18.05/financialProjectPlans/action/reprocessFailedFinancialProjectPlansThis action will reprocess all the financial project plan versions that failed and places them back in the Current working state.
- updateActualAmountsForRangeOfProjects
- Updates actual amounts for a range of projects.
- updatePlannedAmountsFromProgressForRangeOfProjects
- Updates planned amounts from progress for a range of projects.
Examples
The following example shows how to get all financial project plan versions by submitting a GET request on the REST resource using cURL.
curl --user ppm_cloud_user https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans
Response Body Example
The following shows an example of the response body in JSON format.
{ "items": [ { "PlanVersionId": 4067307, "ProjectPlanType": "PSR Project Plan", "ProjectId": 100010025119098, "ProjectNumber": "PJO-M6MAT-PRJ8", "ProjectName": "PJO-M6MAT-PRJ8", "PlannedEffort": 22680, "ITDActualEffort": null, "BaselineEffort": null, "RawCostInProjectCurrency": 45360, "ITDActualRawCostInProjectCurrency": null, "BaselineRawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": 68040, "ITDActualBurdenedCostInProjectCurrency": null, "BaselineBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": 45360, "ITDActualRawCostInProjectLedgerCurrency": null, "BaselineRawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": 68040, "ITDActualBurdenedCostInProjectLedgerCurrency": null, "BaselineBurdenedCostInProjectLedgerCurrency": null }