Update a planning amount for a resource assignment
patch
/fscmRestApi/resources/11.13.18.05/financialProjectPlans/{PlanVersionId}/child/ResourceAssignments/{PlanningElementId}/child/PlanningAmounts/{PlanLineId}
Request
Path Parameters
- PlanLineId(required): integer(int64) Identifier of the summary level planning amounts for a resource assignment in the financial project plan.
- PlanVersionId(required): number Identifier of the financial project plan version.
- PlanningElementId(required): integer(int64) Identifier of the resource assignment on the financial project plan version.
Header Parameters
- Metadata-Context: string If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: string The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Supported Media Types
- application/json
Root Schema : schema
Type:
Show Source object
- BurdenedCost: number Title:
Burdened Cost
Total planned cost for the financial project plan resource assignment in planning currency that includes both raw and burden costs. - Currency: string Title:
Currency
Maximum Length:15
Code that identifies the planning currency on the financial project plan resource assignment. - EffectiveBurdenedCostRate: number Title:
Average Effective Burden Cost Rate
Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. - EffectiveRawCostRate: number Title:
Effective Raw Cost Rate
Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. - EffectiveRevenueRate: number Title:
Effective Revenue Rate
Revenue rate that's used to calculate amounts for a financial project plan resource assignment. Revenue amounts can be determined by multiplying the quantity by effective revenue rate. - ManualSpreadFlag: boolean Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. - PlanLinesDFF: array Plan Lines Descriptive Flexfields Title:
Plan Lines Descriptive Flexfields
The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans. - PlannedQuantity: number Title:
Planned Quantity
Measure of the effort planned for in the financial project plan resource assignment, expressed in hours. - PlanningAmountDetails: array Planning Amount Details Title:
Planning Amount Details
The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts. - RawCost: number Title:
Raw Cost
Planned cost for the financial project plan resource assignment in planning currency that corresponds to the work performed. - Revenue: number Title:
Revenue
Planned revenue for the financial project plan resource assignment, in planning currency, that corresponds to the work performed. - StandardRevenueRate: number Title:
Standard Revenue Rate
Rate derived from the rate schedule for calculating the planned revenue for the financial project plan resource assignment.
Nested Schema : Plan Lines Descriptive Flexfields
Type:
array
Title:
Plan Lines Descriptive Flexfields
The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans.
Show Source Nested Schema : Planning Amount Details
Type:
array
Title:
Planning Amount Details
The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts.
Show Source Nested Schema : schema
Type:
Show Source object
- __FLEX_Context: string Title:
Context Segment
Maximum Length:30
Code that identifies the context for the segments of the plan lines flexfields. - __FLEX_Context_DisplayValue: string Title:
Context Segment
Name of the context for the segments of the plan lines flexfields.
Nested Schema : schema
Type:
Show Source object
- BurdenedCost: number Title:
Planned Burdened Cost
Total planned cost for the period in the financial project plan resource assignment in planning currency that includes both raw and burden costs. - EffectiveBurdenedCostRate: number Title:
Burdened Cost Rate
Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. - EffectiveRawCostRate: number Title:
Effective Rate
Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. - EffectiveRevenueRate: number Title:
Effective Revenue Rate
Revenue rate that's used to calculate amounts for a period in the financial project plan resource assignment. Revenue amounts can be determined by multiplying the quantity by effective revenue rate. - ManualSpreadFlag: boolean Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. - PlannedQuantity: number Title:
Planned Quantity
Measure of the effort planned for the period in the financial project plan resource assignment, expressed in hours. - RawCost: number Title:
Raw cost
Planned cost for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed. - Revenue: number Title:
Revenue
Planned revenue for the period in the financial project plan resource assignment, in planning currency, that corresponds to the work performed.
Response
Supported Media Types
- application/json
Default Response
The following table describes the default response for this task.
Headers
- Metadata-Context: If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Root Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-item-response
Type:
Show Source object
- BaselineBurdenedCost: number Title:
Baseline Burdened Cost
Read Only:true
Total planned cost for the baseline financial project plan resource assignment, including raw and burden costs, in planning currency. - BaselineBurdenedCostInProjectCurrency: number Title:
Rolled-up Baseline Cost for Resource in Project Currency
Read Only:true
Total planned cost for the baseline financial project plan resource assignment, including raw and burden costs, in project currency. - BaselineBurdenedCostInProjectLedgerCurrency: number Title:
Baseline Burdened Cost
Read Only:true
Total planned cost for the financial project plan resource assignment, including raw and burden costs, in project ledger currency in the baseline financial project plan version. - BaselineCurrency: string Title:
Baseline Currency
Read Only:true
Maximum Length:30
Currency of the rendered baseline amounts. - BaselineQuantity: number Title:
Baseline Quantity
Read Only:true
Measure of the effort planned for the resource assignment in the baseline financial project plan version, expressed in hours. - BaselineRawCost: number Title:
Baseline Raw Cost
Read Only:true
Planned cost for the project in planning currency in the baseline financial project plan version that corresponds to the work performed. - BaselineRawCostInProjectCurrency: number Title:
Baseline Raw Cost
Read Only:true
Planned cost for the baseline financial project plan resource assignment in project currency that corresponds to the work performed. - BaselineRawCostInProjectLedgerCurrency: number Title:
Baseline Raw Cost
Read Only:true
Planned cost for the baseline financial project plan resource assignment in project ledger currency that corresponds to the work performed. - BaselineRevenue: number Title:
Baseline Revenue
Read Only:true
Planned revenue for the project, in planning currency, in the baseline financial project plan version that corresponds to the work performed. - BaselineRevenueInProjectCurrency: number Title:
Baseline Revenue in Project Currency
Read Only:true
Planned revenue for the baseline financial project plan resource assignment, in project currency, that corresponds to the work performed. - BaselineRevenueInProjectLedgerCurrency: number Title:
Baseline Revenue in Project Ledger Currency
Read Only:true
Planned revenue for the baseline financial project plan resource assignment, in project ledger currency, that corresponds to the work performed. - BurdenedCost: number Title:
Burdened Cost
Total planned cost for the financial project plan resource assignment in planning currency that includes both raw and burden costs. - BurdenedCostInProjectCurrency: number Title:
Burdened Cost in Project Currency: Total
Read Only:true
Total planned cost for the financial project plan resource assignment in project currency that includes both raw and burden costs. - BurdenedCostInProjectLedgerCurrency: number Title:
Burdened Cost in Project Ledger Currency: Total
Read Only:true
Total planned cost for the financial project plan resource assignment in project ledger currency that includes both raw and burden costs. - Currency: string Title:
Currency
Maximum Length:15
Code that identifies the planning currency on the financial project plan resource assignment. - EffectiveBurdenedCostRate: number Title:
Average Effective Burden Cost Rate
Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. - EffectiveRawCostRate: number Title:
Effective Raw Cost Rate
Cost rate that is used to calculate amounts for a financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. - EffectiveRevenueRate: number Title:
Effective Revenue Rate
Revenue rate that's used to calculate amounts for a financial project plan resource assignment. Revenue amounts can be determined by multiplying the quantity by effective revenue rate. - ITDActualBurdenedCost: number Title:
ITD Actual Burdened Cost
Read Only:true
Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in planning currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectCurrency: number Title:
ITD Actual Burdened Cost
Read Only:true
Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectLedgerCurrency: number Title:
ITD Actual Burdened Cost
Read Only:true
Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project ledger currency from the start date of the project till the current date. - ITDActualQuantity: number Title:
ITD Actual Quantity
Read Only:true
Actual effort for the financial project plan resource assignment from the start of the project till the current date, expressed in hours. - ITDActualRawCost: number Title:
ITD Actual Raw Cost
Read Only:true
Actual cost incurred for the financial project plan resource assignment in planning currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectCurrency: number Title:
ITD Actual Raw Cost
Read Only:true
Actual cost incurred for the financial project plan resource assignment in project currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectLedgerCurrency: number Title:
ITD Actual Raw Cost
Read Only:true
Actual cost incurred for the financial project plan resource assignment in project ledger currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenue: number Title:
ITD Actual Revenue
Read Only:true
Actual revenue incurred for the financial project plan resource assignment, in planning currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectCurrency: number Title:
ITD Actual Revenue in Project Currency
Read Only:true
Actual revenue incurred for the financial project plan resource assignment, in project currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectLedgerCurrency: number Title:
ITD Actual Revenue in Project Ledger Currency
Read Only:true
Actual revenue incurred for the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed from the start date of the project till the current date. - links: array Links Title:
Links
The link relations associated with the resource instance. - ManualSpreadFlag: boolean Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. - Margin: number Title:
Margin
Read Only:true
The difference between costs and revenue amounts. - MarginPercentage: number Title:
Margin Percentage
Read Only:true
The difference between costs and revenue amounts, expressed as a percentage. - PlanLineId: integer (int64) Title:
Plan Line ID
Identifier of the summary level planning amounts for a resource assignment in the financial project plan. - PlanLinesDFF: array Plan Lines Descriptive Flexfields Title:
Plan Lines Descriptive Flexfields
The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans. - PlannedQuantity: number Title:
Planned Quantity
Measure of the effort planned for in the financial project plan resource assignment, expressed in hours. - PlanningAmountDetails: array Planning Amount Details Title:
Planning Amount Details
The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts. - RawCost: number Title:
Raw Cost
Planned cost for the financial project plan resource assignment in planning currency that corresponds to the work performed. - RawCostInProjectCurrency: number Title:
Raw Cost in Project Currency: Total
Read Only:true
Planned cost for the financial project plan resource assignment in project currency that corresponds to the work performed. - RawCostInProjectLedgerCurrency: number Title:
Raw Cost in Project Ledger Currency
Read Only:true
Planned cost for the financial project plan resource assignment in project ledger currency that corresponds to the work performed. - Revenue: number Title:
Revenue
Planned revenue for the financial project plan resource assignment, in planning currency, that corresponds to the work performed. - RevenueInProjectCurrency: number Title:
Revenue in Project Currency
Read Only:true
Planned revenue for the financial project plan resource assignment, in project currency, that corresponds to the work performed. - RevenueInProjectLedgerCurrency: number Title:
Revenue in Project Ledger Currency
Read Only:true
Planned revenue for the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed. - StandardBurdenedCostRate: number Title:
Standard Burdened Cost Rate
Read Only:true
Average rate derived from the rate schedule for calculating the planned burdened cost for the financial project plan resource assignment. - StandardRawCostRate: number Title:
Standard Raw Cost Rate
Read Only:true
Rate derived from the rate schedule for calculating the planned raw cost for the financial project plan resource assignment. - StandardRevenueRate: number Title:
Standard Revenue Rate
Rate derived from the rate schedule for calculating the planned revenue for the financial project plan resource assignment.
Nested Schema : Links
Type:
array
Title:
Links
The link relations associated with the resource instance.
Show Source Nested Schema : Plan Lines Descriptive Flexfields
Type:
array
Title:
Plan Lines Descriptive Flexfields
The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans.
Show Source Nested Schema : Planning Amount Details
Type:
array
Title:
Planning Amount Details
The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts.
Show Source Nested Schema : link
Type:
Show Source object
- href: string Title:
hyperlink reference
The URI to the related resource. - kind: string Title:
kind
Allowed Values:[ "collection", "item", "describe", "other" ]
The kind of the related resource. - name: string Title:
name
The name of the link to the related resource. - properties: object properties
- rel: string Title:
relation
Allowed Values:[ "self", "lov", "parent", "canonical", "child", "enclosure", "action", "custom" ]
The name of the relation to the resource instance. Example: self.
Nested Schema : properties
Type:
Show Source object
- changeIndicator: string Change indicator or the ETag value of the resource instance.
Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanLinesDFF-item-response
Type:
Show Source object
- __FLEX_Context: string Title:
Context Segment
Maximum Length:30
Code that identifies the context for the segments of the plan lines flexfields. - __FLEX_Context_DisplayValue: string Title:
Context Segment
Name of the context for the segments of the plan lines flexfields. - links: array Links Title:
Links
The link relations associated with the resource instance. - PlanLineId: integer (int64) Identifier of the summary level planning amounts for a plan line in the financial project plan.
Nested Schema : Links
Type:
array
Title:
Links
The link relations associated with the resource instance.
Show Source Nested Schema : financialProjectPlans-ResourceAssignments-PlanningAmounts-PlanningAmountDetails-item-response
Type:
Show Source object
- BurdenedCost: number Title:
Planned Burdened Cost
Total planned cost for the period in the financial project plan resource assignment in planning currency that includes both raw and burden costs. - BurdenedCostInProjectCurrency: number Title:
Burdened Cost in Project Currency: Total
Read Only:true
Total planned cost for a period in the financial project plan resource assignment in project currency that includes both raw and burden costs. - BurdenedCostInProjectLedgerCurrency: number Title:
Burdened Cost in Project Ledger Currency: Total
Read Only:true
Total planned cost for a period in the financial project plan resource assignment in project ledger currency that includes both raw and burden costs. - EffectiveBurdenedCostRate: number Title:
Burdened Cost Rate
Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective burdened cost rate gives the burdened cost amounts. - EffectiveRawCostRate: number Title:
Effective Rate
Cost rate that is used to calculate amounts for a period in the financial project plan resource assignment. Quantity multiplied by the effective raw cost rate gives the raw cost amounts. - EffectiveRevenueRate: number Title:
Effective Revenue Rate
Revenue rate that's used to calculate amounts for a period in the financial project plan resource assignment. Revenue amounts can be determined by multiplying the quantity by effective revenue rate. - ITDActualBurdenedCost: number Title:
ITD Actual Burdened Cost
Read Only:true
Actual cost incurred for the period in the financial project plan resource assignment, including raw and burden costs, in planning currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectCurrency: number Title:
ITD Actual Burdened Cost
Read Only:true
Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project currency from the start date of the project till the current date. - ITDActualBurdenedCostInProjectLedgerCurrency: number Title:
ITD Actual in Project Ledger Currency
Read Only:true
Actual cost incurred for the financial project plan resource assignment, including raw and burden costs, in project ledger currency from the start date of the project till the current date. - ITDActualQuantity: number Title:
ITD Actual Quantity
Read Only:true
Actual effort for the period in the financial project plan resource assignment from the start of the project till the current date, expressed in hours. - ITDActualRawCost: number Title:
ITD Actual Raw Cost
Read Only:true
Actual cost incurred for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectCurrency: number Title:
ITD Actual in Project Currency
Read Only:true
Actual cost incurred for the financial project plan resource assignment in project currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRawCostInProjectLedgerCurrency: number Title:
ITD Actual in Project Ledger Currency
Read Only:true
Actual cost incurred for the financial project plan resource assignment in project ledger currency that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenue: number Title:
ITD Actual Revenue
Read Only:true
Actual revenue incurred for the period in the financial project plan resource assignment, in planning currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectCurrency: number Title:
ITD Actual Revenue in Project Currency
Read Only:true
Actual revenue incurred for the period in the financial project plan resource assignment, in project currency, that corresponds to the work performed from the start date of the project till the current date. - ITDActualRevenueInProjectLedgerCurrency: number Title:
ITD Actual Revenue in Project Ledger Currency
Read Only:true
Actual revenue incurred for the period in the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed from the start date of the project till the current date. - links: array Links Title:
Links
The link relations associated with the resource instance. - ManualSpreadFlag: boolean Maximum Length:
1
Indicates if the periodic planning is modified and retained for the plan line on date changes. - PeriodName: string Title:
Period
Maximum Length:30
Period for which the periodic level planning amounts are created for a resource assignment in the financial project plan. - PlannedQuantity: number Title:
Planned Quantity
Measure of the effort planned for the period in the financial project plan resource assignment, expressed in hours. - RawCost: number Title:
Raw cost
Planned cost for the period in the financial project plan resource assignment in planning currency that corresponds to the work performed. - RawCostInProjectCurrency: number Title:
Raw Cost in Project Currency: Total
Read Only:true
Planned cost for a period in the financial project plan resource assignment in project currency that corresponds to the work performed. - RawCostInProjectLedgerCurrency: number Title:
Raw Cost in Project Ledger Currency: Total
Read Only:true
Planned cost for a period in the financial project plan resource assignment in project ledger currency that corresponds to the work performed. - Revenue: number Title:
Revenue
Planned revenue for the period in the financial project plan resource assignment, in planning currency, that corresponds to the work performed. - RevenueInProjectCurrency: number Title:
Revenue in Project Currency
Read Only:true
Planned revenue for the period in the financial project plan resource assignment, in project currency, that corresponds to the work performed. - RevenueInProjectLedgerCurrency: number Title:
Revenue in Project Ledger Currency
Read Only:true
Planned revenue for the period in the financial project plan resource assignment, in project ledger currency, that corresponds to the work performed. - StandardBurdenedCostRate: number Title:
Standard Burdened Cost Rate
Read Only:true
Average rate derived from the rate schedule for calculating the planned burdened cost for the period in the financial project plan resource assignment. - StandardRawCostRate: number Title:
Standard Raw Cost Rate
Read Only:true
Rate derived from the rate schedule for calculating the planned raw cost for the period in the financial project plan resource assignment. - StandardRevenueRate: number Title:
Standard Revenue Rate
Read Only:true
Rate derived from the rate schedule for calculating the planned revenue for a period in the financial project plan resource assignment.
Nested Schema : Links
Type:
array
Title:
Links
The link relations associated with the resource instance.
Show Source Links
- PlanLinesDFF
- Parameters:
- PlanLineId:
$request.path.PlanLineId
- PlanVersionId:
$request.path.PlanVersionId
- PlanningElementId:
$request.path.PlanningElementId
The Plan Lines descriptive flexfields resource is used to capture, view, and update additional information for planning amounts in financial project plans. - PlanLineId:
- PlanningAmountDetails
- Parameters:
- PlanLineId:
$request.path.PlanLineId
- PlanVersionId:
$request.path.PlanVersionId
- PlanningElementId:
$request.path.PlanningElementId
The Planning Amount Details resource is used to view, create, update, and delete a financial project plan resource assignment periodic amounts. - PlanLineId:
- adjust
- Parameters:
- PlanLineId:
$request.path.PlanLineId
- PlanVersionId:
$request.path.PlanVersionId
- PlanningElementId:
$request.path.PlanningElementId
Adjusts the financia project plan line using the adjustment parameters. - PlanLineId:
- refreshRates
- Parameters:
- PlanLineId:
$request.path.PlanLineId
- PlanVersionId:
$request.path.PlanVersionId
- PlanningElementId:
$request.path.PlanningElementId
Refreshes rates for the financial project plan line. - PlanLineId:
- updatePlannedAmountsFromProgress
- Parameters:
- PlanLineId:
$request.path.PlanLineId
- PlanVersionId:
$request.path.PlanVersionId
- PlanningElementId:
$request.path.PlanningElementId
Updates planned amounts from progress for a resource. - PlanLineId:
Examples
The following example shows how to update planning amounts for resource assignments using a batch operation.
curl --user ppm_cloud_user -X POST -H "Content-Type: application/vnd.oracle.adf.batch+json" -d @example_request_payload.json "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05" -H 'cache-control: no-cache'
Request Body Example
The following shows an example of the request body in JSON format.
{ "parts":[ { "id":"part1", "path":"/financialProjectPlans/4067308/child/ResourceAssignments/1987603445/child/PlanningAmounts/27065059226", "operation":"update", "payload":{ "PlannedQuantity": 10000 } }, { "id":"part2", "path":"/financialProjectPlans/4067304/child/ResourceAssignments/1987603405/child/PlanningAmounts/27065059145", "operation":"update", "payload":{ "PlannedQuantity": 10000 } }, { "id":"part3", "path":"/financialProjectPlans/4067262/child/ResourceAssignments/1987603305/child/PlanningAmounts/27065058966", "operation":"update", "payload":{ "PlannedQuantity": 10000 } } ] }
Response Body Example
The following shows an example of the response body in JSON format.
{ "parts": [ { "id": "part1", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067308/child/ResourceAssignments/1987603445/child/PlanningAmounts/27065059226", "operation": "update", "payload": { "PlanLineId": 27065059226, "PlannedQuantity": 10000, "ITDActualQuantity": null, "BaselineQuantity": null, "Currency": "USD", "RawCost": 20000, "ITDActualRawCost": null, "BaselineRawCost": null, "BurdenedCost": 20000, "ITDActualBurdenedCost": null, "BaselineBurdenedCost": null, "EffectiveRawCostRate": 2, "StandardRawCostRate": null, "EffectiveBurdenedCostRate": 2, "StandardBurdenedCostRate": null, "RawCostInProjectCurrency": 20000, "ITDActualRawCostInProjectCurrency": null, "BaselineRawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": 20000, "ITDActualBurdenedCostInProjectCurrency": null, "BaselineBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": 20000, "ITDActualRawCostInProjectLedgerCurrency": null, "BaselineRawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": 20000, "ITDActualBurdenedCostInProjectLedgerCurrency": null, "BaselineBurdenedCostInProjectLedgerCurrency": null, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067308/child/ResourceAssignments/1987603445/child/PlanningAmounts/27065059226", "name": "PlanningAmounts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067308/child/ResourceAssignments/1987603445/child/PlanningAmounts/27065059226", "name": "PlanningAmounts", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067308/child/ResourceAssignments/1987603445", "name": "ResourceAssignments", "kind": "item" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067308/child/ResourceAssignments/1987603445/child/PlanningAmounts/27065059226/child/PlanLinesDFF", "name": "PlanLinesDFF", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067308/child/ResourceAssignments/1987603445/child/PlanningAmounts/27065059226/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], } }, { "id": "part2", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067304/child/ResourceAssignments/1987603405/child/PlanningAmounts/27065059145", "operation": "update", "payload": { "PlanLineId": 27065059145, "PlannedQuantity": 10000, "ITDActualQuantity": null, "BaselineQuantity": null, "Currency": "USD", "RawCost": 20000, "ITDActualRawCost": null, "BaselineRawCost": null, "BurdenedCost": 20000, "ITDActualBurdenedCost": null, "BaselineBurdenedCost": null, "EffectiveRawCostRate": 2, "StandardRawCostRate": null, "EffectiveBurdenedCostRate": 2, "StandardBurdenedCostRate": null, "RawCostInProjectCurrency": 20000, "ITDActualRawCostInProjectCurrency": null, "BaselineRawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": 20000, "ITDActualBurdenedCostInProjectCurrency": null, "BaselineBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": 20000, "ITDActualRawCostInProjectLedgerCurrency": null, "BaselineRawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": 20000, "ITDActualBurdenedCostInProjectLedgerCurrency": null, "BaselineBurdenedCostInProjectLedgerCurrency": null, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067304/child/ResourceAssignments/1987603405/child/PlanningAmounts/27065059145", "name": "PlanningAmounts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067304/child/ResourceAssignments/1987603405/child/PlanningAmounts/27065059145", "name": "PlanningAmounts", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067304/child/ResourceAssignments/1987603405", "name": "ResourceAssignments", "kind": "item" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067304/child/ResourceAssignments/1987603405/child/PlanningAmounts/27065059145/child/PlanLinesDFF", "name": "PlanLinesDFF", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067304/child/ResourceAssignments/1987603405/child/PlanningAmounts/27065059145/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], } }, { "id": "part3", "path": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067262/child/ResourceAssignments/1987603305/child/PlanningAmounts/27065058966", "operation": "update", "payload": { "PlanLineId": 27065058966, "PlannedQuantity": 10000, "ITDActualQuantity": null, "BaselineQuantity": null, "Currency": "USD", "RawCost": 20000, "ITDActualRawCost": null, "BaselineRawCost": null, "BurdenedCost": 20000, "ITDActualBurdenedCost": null, "BaselineBurdenedCost": null, "EffectiveRawCostRate": 2, "StandardRawCostRate": null, "EffectiveBurdenedCostRate": 2, "StandardBurdenedCostRate": null, "RawCostInProjectCurrency": 20000, "ITDActualRawCostInProjectCurrency": null, "BaselineRawCostInProjectCurrency": null, "BurdenedCostInProjectCurrency": 20000, "ITDActualBurdenedCostInProjectCurrency": null, "BaselineBurdenedCostInProjectCurrency": null, "RawCostInProjectLedgerCurrency": 20000, "ITDActualRawCostInProjectLedgerCurrency": null, "BaselineRawCostInProjectLedgerCurrency": null, "BurdenedCostInProjectLedgerCurrency": 20000, "ITDActualBurdenedCostInProjectLedgerCurrency": null, "BaselineBurdenedCostInProjectLedgerCurrency": null, "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067262/child/ResourceAssignments/1987603305/child/PlanningAmounts/27065058966", "name": "PlanningAmounts", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067262/child/ResourceAssignments/1987603305/child/PlanningAmounts/27065058966", "name": "PlanningAmounts", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067262/child/ResourceAssignments/1987603305", "name": "ResourceAssignments", "kind": "item" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067262/child/ResourceAssignments/1987603305/child/PlanningAmounts/27065058966/child/PlanLinesDFF", "name": "PlanLinesDFF", "kind": "collection" }, { "rel": "child", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/financialProjectPlans/4067262/child/ResourceAssignments/1987603305/child/PlanningAmounts/27065058966/child/PlanningAmountDetails", "name": "PlanningAmountDetails", "kind": "collection" } ], } } ], }