Get all project budget versions
get
/fscmRestApi/resources/11.13.18.05/projectBudgetSummary
Request
Query Parameters
- expand: string When this parameter is provided, the specified children are included in the resource payload (instead of just a link). The value of this query parameter is "all" or "". More than one child can be specified using comma as a separator. Example: ?expand=Employees,Localizations. Nested children can also be provided following the format "Child.NestedChild" (Example: ?expand=Employees.Managers). If a nested child is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?expand=Employees.Managers" is the same as "?expand=Employees,Employees.Managers" (which will expand Employees and Managers).
- fields: string This parameter filters the resource fields. Only the specified fields are returned, which means that if no fields are specified, no fields are returned (useful to get only the links). If an indirect child resource is provided (Example: Employees.Managers), the missing children will be processed implicitly. For example, "?fields=Employees.Managers:Empname" is the same as "?fields=;Employees:;Employees.Managers:Empname" (which will only return the "Empname" field for Managers). the value of this query parameter is a list of resource fields. The attribute can be a direct (Example: Employees) or indirect (Example: Employees.Managers) child. It cannot be combined with expand query parameter. If both are provided, only fields will be considered.
Format: ?fields=Attribute1,Attribute2
Format for fields in child resource: ?fields=Accessor1:Attribute1,Attribute2 - finder: string Used as a predefined finder to search the collection.
Format: ?finder=<finderName>;<variableName>=<variableValue>,<variableName2>=<variableValue2>
The following are the available finder names and corresponding finder variables:- CurrentBaselineProjectBudgetFinder: Finds the current baseline project budget for the specified project and financial plan type.
Finder Variables:- FinancialPlanType; string; Name of the financial plan type used to create the budget version.
- ProjectId; integer; Identifier of the project on which the budget is created.
- CurrentWorkingProjectBudgetFinder: Finds the current working project budget for the specified project and financial plan type.
Finder Variables:- FinancialPlanType; string; Name of the financial plan type used to create the budget version.
- ProjectId; integer; Identifier of the project on which the budget is created.
- PrimaryKey: Finds the project budget version.
Finder Variables:- PlanVersionId; integer; Identifier of the project budget version.
- CurrentBaselineProjectBudgetFinder: Finds the current baseline project budget for the specified project and financial plan type.
- limit: integer This parameter restricts the number of resources returned inside the resource collection. If the limit exceeds the resource count then the framework will only return the available resources.
- links: string This parameter can be used to show only certain links while accessing a singular resource or a resource collection. The parameter value format is a comma-separated list of : <link_relation>
Example:
self,canonical - offset: integer Used to define the starting position of the resource collection. If offset exceeds the resource count then no resources are returned. Default value is 0.
- onlyData: boolean The resource item payload will be filtered in order to contain only data (no links section, for example).
- orderBy: string This parameter orders a resource collection based on the specified fields. The parameter value is a comma-separated string of attribute names, each optionally followed by a colon and "asc" or "desc". Specify "asc" for ascending and "desc" for descending. The default value is "asc". For example, ?orderBy=field1:asc,field2:desc
- q: string This query parameter defines the where clause. The resource collection will be queried using the provided expressions. The value of this query parameter is one or more expressions. Example: ?q=Deptno>=10 and <= 30;Loc!=NY
Format: ?q=expression1;expression2
You can use these queryable attributes to filter this collection resource using the q query parameter:- FinancialPlanType; string; Name of the financial plan type used to create the project budget version.
- PCBurdenedCostAmounts; number; Budget burdened cost amounts in project currency for the project budget version.
- PCRawCostAmounts; number; Budget raw cost amounts in project currency for the project budget version.
- PCRevenueAmounts; number; Budget revenue amounts in project currency for the project budget version.
- PFCBurdenedCostAmounts; number; Budget burdened cost amounts in project ledger currency for the project budget version.
- PFCRawCostAmounts; number; Budget raw cost amounts in project ledger currency for the project budget version.
- PFCRevenueAmounts; number; Budget revenue amounts in project ledger currency for the project budget version.
- PlanVersionDescription; string; Description of the project budget version.
- PlanVersionId; integer; Identifier of the project budget version.
- PlanVersionName; string; Name of the project budget version.
- PlanVersionNumber; integer; Number of the project budget version.
- PlanVersionStatus; string; Status of the project budget version.
- PlanningAmounts; string; The planning amount, either cost or revenue, that you must specify when using a financial plan type that allows creation of cost and revenue versions separately.
- ProjectId; integer; Identifier of the project on which the project budget is created.
- ProjectName; string; Name of the project on which the project budget is created.
- ProjectNumber; string; Number of the project on which the project budget is created.
- totalResults: boolean The resource collection representation will include the "estimated row count" when "?totalResults=true", otherwise the count is not included. The default value is "false".
Header Parameters
- Metadata-Context: string If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: string The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
There's no request body for this operation.
Back to TopResponse
Supported Media Types
- application/json
Default Response
The following table describes the default response for this task.
Headers
- Metadata-Context: If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Root Schema : projectBudgetSummary
Type:
Show Source object- count(required): integer The number of resource instances returned in the current range.
- hasMore(required): boolean Indicates whether more resources are available on the server than the subset returned in the response. If the value is true, then there are more resources to retrieve from the server. The default value is false.
- items: array Items Title:
ItemsThe items in the collection. - limit(required): integer The actual paging size used by the server.
- links(required): array Links Title:
LinksThe link relations associated with the resource instance. - offset(required): integer The offset value used in the current page.
- totalResults: integer The estimated row count when "?totalResults=true", otherwise the count is not included.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : projectBudgetSummary-item-response
Type:
Show Source object- FinancialPlanType: string Title:
Financial Plan TypeRead Only:trueMaximum Length:240Name of the financial plan type used to create the project budget version. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PCBurdenedCostAmounts: number Read Only:
trueBudget burdened cost amounts in project currency for the project budget version. - PCRawCostAmounts: number Read Only:
trueBudget raw cost amounts in project currency for the project budget version. - PCRevenueAmounts: number Read Only:
trueBudget revenue amounts in project currency for the project budget version. - PFCBurdenedCostAmounts: number Read Only:
trueBudget burdened cost amounts in project ledger currency for the project budget version. - PFCRawCostAmounts: number Read Only:
trueBudget raw cost amounts in project ledger currency for the project budget version. - PFCRevenueAmounts: number Read Only:
trueBudget revenue amounts in project ledger currency for the project budget version. - PlanningAmounts: string Read Only:
trueMaximum Length:30The planning amount, either cost or revenue, that you must specify when using a financial plan type that allows creation of cost and revenue versions separately. - PlanVersionDescription: string Title:
DescriptionRead Only:trueMaximum Length:2000Description of the project budget version. - PlanVersionId: integer (int64) Read Only:
trueIdentifier of the project budget version. - PlanVersionName: string Title:
NameRead Only:trueMaximum Length:225Name of the project budget version. - PlanVersionNumber: integer (int64) Title:
NumberRead Only:trueNumber of the project budget version. - PlanVersionStatus: string Title:
StatusRead Only:trueMaximum Length:80Status of the project budget version. - ProjectId: integer (int64) Title:
Project IDRead Only:trueIdentifier of the project on which the project budget is created. - ProjectName: string Title:
Project NameRead Only:trueMaximum Length:240Name of the project on which the project budget is created. - ProjectNumber: string Title:
Project NumberRead Only:trueMaximum Length:25Number of the project on which the project budget is created. - Resources: array Resources Title:
ResourcesThe Resources resource is used to view a project budget version resource. - Tasks: array Tasks Title:
TasksThe Tasks resource is used to view a project budget version task. - VersionErrors: array Version Errors Title:
Version ErrorsThe Version Errors resource is used to view project budget version errors.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : Resources
Type:
arrayTitle:
ResourcesThe Resources resource is used to view a project budget version resource.
Show Source Nested Schema : Tasks
Type:
arrayTitle:
TasksThe Tasks resource is used to view a project budget version task.
Show Source Nested Schema : Version Errors
Type:
arrayTitle:
Version ErrorsThe Version Errors resource is used to view project budget version errors.
Show Source Nested Schema : link
Type:
Show Source object- href: string Title:
hyperlink referenceThe URI to the related resource. - kind: string Title:
kindAllowed Values:[ "collection", "item", "describe", "other" ]The kind of the related resource. - name: string Title:
nameThe name of the link to the related resource. - properties: object properties
- rel: string Title:
relationAllowed Values:[ "self", "lov", "parent", "canonical", "child", "enclosure", "action", "custom" ]The name of the relation to the resource instance. Example: self.
Nested Schema : properties
Type:
Show Source object- changeIndicator: string Change indicator or the ETag value of the resource instance.
Nested Schema : projectBudgetSummary-Resources-item-response
Type:
Show Source object- BudgetLines: array Budget Lines Title:
Budget LinesThe Budget Lines resource is used to view a resource's project budget line. - BurdenedCostAmounts: number Read Only:
trueProject budget line burdened cost amounts in transaction currency. - Currency: string Title:
Project CurrencyRead Only:trueMaximum Length:15Currency code for the project budget lines. - links: array Links Title:
LinksThe link relations associated with the resource instance. - ParentElementId: integer (int64) Read Only:
trueIdentifier of the parent resource breakdown structure element. - PCBurdenedCostAmounts: number Read Only:
trueProject budget line burdened cost amounts in project currency. - PCRawCostAmounts: number Read Only:
trueProject budget line raw cost amounts in project currency. - PCRevenueAmounts: number Read Only:
trueProject budget line revenue amounts in project currency. - PFCBurdenedCostAmounts: number Read Only:
trueProject budget line burdened cost amounts in project ledger currency. - PFCRawCostAmounts: number Read Only:
trueProject budget line raw cost amounts in project ledger currency. - PFCRevenueAmounts: number Read Only:
trueProject budget line revenue amounts in project ledger currency. - Quantity: number Read Only:
trueMeasure of the effort planned for the project budget line. - RawCostAmounts: number Read Only:
trueProject budget line raw cost amounts in transaction currency. - RbsElementId: integer (int64) Read Only:
trueIdentifier of the resource used to create the project budget line. - ResourceClass: string Title:
Resource ClassRead Only:trueMaximum Length:240A resource type that is available for use within resource format hierarchies on planning resource breakdown structure. - ResourceFormat: string Title:
Resource CombinationRead Only:trueMaximum Length:240Resource format to add resource element to the planning resource breakdown structure. - ResourceName: string Title:
ResourceRead Only:trueMaximum Length:240The name of the resource used to create the project budget line. - RevenueAmounts: number Read Only:
trueProject budget line revenue amounts in transaction currency.
Nested Schema : Budget Lines
Type:
arrayTitle:
Budget LinesThe Budget Lines resource is used to view a resource's project budget line.
Show Source Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : projectBudgetSummary-Resources-BudgetLines-item-response
Type:
Show Source object- BurdenedCostAmounts: number Title:
TotalRead Only:trueProject budget line burdened cost amounts in transaction currency. - Currency: string Title:
CurrencyRead Only:trueMaximum Length:15Currency code for the project budget lines. - EffectiveBurdenedCostRate: number Title:
Effective RateRead Only:trueEffective burdened cost rate for project budget line. - EffectiveRawCostRate: number Title:
Effective RateRead Only:trueEffective raw cost rate for project budget line. - EffectiveRevenueRate: number Title:
Effective RateRead Only:trueEffective revenue rate for project budget line. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PCBurdenedCostAmounts: number Title:
TotalRead Only:trueProject budget line burdened cost amounts in project currency. - PCRawCostAmounts: number Title:
TotalRead Only:trueProject budget line raw cost amounts in project currency. - PCRevenueAmounts: number Title:
TotalRead Only:trueProject budget line revenue amounts in project currency. - PFCBurdenedCostAmounts: number Title:
TotalRead Only:trueProject budget line burdened cost amounts in project ledger currency. - PFCRawCostAmounts: number Title:
TotalRead Only:trueProject budget line raw cost amounts in project ledger currency. - PFCRevenueAmounts: number Title:
TotalRead Only:trueProject budget line revenue amounts in project ledger currency. - PlanningAmountDetails: array Planning Amount Details Title:
Planning Amount DetailsThe Planning Amount Details resource is used to view a project budget line periodic amounts. - PlanningEndDate: string (date) Title:
Planned Finish DateRead Only:trueProject budget line end date. - PlanningStartDate: string (date) Title:
Planned Start DateRead Only:trueProject budget line start date. - Quantity: number Title:
TotalRead Only:trueMeasure of the effort planned for the project budget line. - RawCostAmounts: number Title:
TotalRead Only:trueProject budget line raw cost amounts in transaction currency. - RbsElementId: integer (int64) Read Only:
trueIdentifier of the resource used to create the project budget line. - ResourceClass: string Title:
Resource ClassRead Only:trueMaximum Length:240A resource type that is available for use within resource format hierarchies on planning resource breakdown structure. - ResourceFormat: string Title:
Resource CombinationRead Only:trueMaximum Length:240Resource format to add resource element to the planning resource breakdown structure. - ResourceName: string Title:
ResourceRead Only:trueMaximum Length:240The name of the resource used to create the project budget line. - RevenueAmounts: number Title:
TotalRead Only:trueProject budget line revenue amounts in transaction currency. - SpreadCurve: string Title:
NameRead Only:trueMaximum Length:240Spread curves distributes quantity, cost, and revenue amounts automatically across accounting or project accounting periods. - StandardBurdenedCostRate: number Read Only:
trueStandard burdened cost rate for project budget line. - StandardRawCostRate: number Read Only:
trueStandard raw cost rate for project budget line. - StandardRevenueRate: number Read Only:
trueStandard revenue rate for project budget line. - TaskId: integer (int64) Title:
Task IDRead Only:trueIdentifier of the task which is used to create a project budget line. - TaskName: string Title:
Task NameRead Only:trueMaximum Length:255Name of the task which is used to create a project budget line. - TaskNumber: string Title:
Task NumberRead Only:trueMaximum Length:100Number of the task which is used to create a project budget line. - TaskSequence: integer (int64) Title:
Task SequenceRead Only:truePosition of the project task in a hierarchical arrangement.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : Planning Amount Details
Type:
arrayTitle:
Planning Amount DetailsThe Planning Amount Details resource is used to view a project budget line periodic amounts.
Show Source Nested Schema : projectBudgetSummary-Resources-BudgetLines-PlanningAmountDetails-item-response
Type:
Show Source object- BurdenedCostAmounts: number Read Only:
truePeriodic project budget line burdened cost amounts in transaction currency. - EffectiveBurdenedCostRate: number Read Only:
trueEffective burdened cost rate for periodic line. - EffectiveRawCostRate: number Read Only:
trueEffective raw cost rate for periodic line. - EffectiveRevenueRate: number Title:
Effective RateRead Only:trueEffective revenue rate for periodic line. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PCBurdenedCostAmounts: number Title:
Burdened CostRead Only:truePeriodic project budget line burdened cost amounts in project currency. - PCRawCostAmounts: number Title:
TotalRead Only:truePeriodic project budget line raw cost amounts in project currency. - PCRevenueAmounts: number Title:
TotalRead Only:truePeriodic project budget line revenue amounts in project currency. - PeriodName: string Title:
PeriodRead Only:trueMaximum Length:30Period for which the periodic budget amount is entered. - PFCBurdenedCostAmounts: number Read Only:
truePeriodic project budget line burdened cost amounts in project ledger currency. - PFCRawCostAmounts: number Title:
TotalRead Only:truePeriodic project budget line raw cost amounts in project ledger currency. - PFCRevenueAmounts: number Read Only:
truePeriodic project budget line revenue amounts in project ledger currency. - Quantity: number Title:
TotalRead Only:trueMeasure of the effort planned for the project budget line by period. - RawCostAmounts: number Title:
TotalRead Only:truePeriodic project budget line raw cost amounts in transaction currency. - RevenueAmounts: number Read Only:
truePeriodic project budget line revenue amounts in transaction currency. - StandardBurdenedCostRate: number Title:
Effective RateRead Only:trueStandard burdened cost rate for periodic line. - StandardRawCostRate: number Read Only:
trueStandard raw cost rate for periodic line. - StandardRevenueRate: number Read Only:
trueStandard revenue rate for periodic line.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : projectBudgetSummary-Tasks-item-response
Type:
Show Source object- BudgetLines: array Budget Lines Title:
Budget LinesThe Budget Lines resource is used to view a task's project budget line. - BurdenedCostAmounts: number Read Only:
trueProject budget line burdened cost amounts in transaction currency. - Currency: string Title:
Project CurrencyRead Only:trueMaximum Length:15Currency code for the project budget lines. - links: array Links Title:
LinksThe link relations associated with the resource instance. - ParentTaskId: integer (int64) Title:
Parent Task IDRead Only:trueIdentifier of the parent task. - PCBurdenedCostAmounts: number Read Only:
trueProject budget line burdened cost amounts in project currency. - PCRawCostAmounts: number Read Only:
trueProject budget line raw cost amounts in project currency. - PCRevenueAmounts: number Read Only:
trueProject budget line revenue amounts in project currency. - PFCBurdenedCostAmounts: number Read Only:
trueProject budget line burdened cost amounts in project ledger currency. - PFCRawCostAmounts: number Read Only:
trueProject budget line raw cost amounts in project ledger currency. - PFCRevenueAmounts: number Read Only:
trueProject budget line revenue amounts in project ledger currency. - PlanningEndDate: string (date) Title:
Planned Finish DateRead Only:trueScheduled end date of the project task. - PlanningStartDate: string (date) Title:
Planned Start DateRead Only:trueScheduled start date of the project task. - Quantity: number Read Only:
trueMeasure of the effort planned for the project budget line. - RawCostAmounts: number Read Only:
trueProject budget line raw cost amounts in transaction currency. - RevenueAmounts: number Read Only:
trueProject budget line revenue amounts in transaction currency. - TaskId: integer (int64) Title:
Task IDRead Only:trueIdentifier of the task which is used to create a project budget line. - TaskName: string Title:
Task NameRead Only:trueMaximum Length:255Name of the task which is used to create a project budget line. - TaskNumber: string Title:
Task NumberRead Only:trueMaximum Length:100Number of the task which is used to create a project budget line. - TaskSequence: integer (int64) Title:
Task SequenceRead Only:truePosition of the task in the hierarchical arrangement.
Nested Schema : Budget Lines
Type:
arrayTitle:
Budget LinesThe Budget Lines resource is used to view a task's project budget line.
Show Source Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : projectBudgetSummary-Tasks-BudgetLines-item-response
Type:
Show Source object- BurdenedCostAmounts: number Title:
TotalRead Only:trueProject budget line burdened cost amounts in transaction currency. - Currency: string Title:
CurrencyRead Only:trueMaximum Length:15Currency code for the project budget lines. - EffectiveBurdenedCostRate: number Title:
Effective RateRead Only:trueEffective burdened cost rate for project budget line. - EffectiveRawCostRate: number Title:
Effective RateRead Only:trueEffective raw cost rate for project budget line. - EffectiveRevenueRate: number Title:
Effective RateRead Only:trueEffective revenue rate for project budget line. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PCBurdenedCostAmounts: number Title:
TotalRead Only:trueProject budget line burdened cost amounts in project currency. - PCRawCostAmounts: number Title:
TotalRead Only:trueProject budget line raw cost amounts in project currency. - PCRevenueAmounts: number Title:
TotalRead Only:trueProject budget line revenue amounts in project currency. - PFCBurdenedCostAmounts: number Title:
TotalRead Only:trueProject budget line burdened cost amounts in project ledger currency. - PFCRawCostAmounts: number Title:
TotalRead Only:trueProject budget line raw cost amounts in project ledger currency. - PFCRevenueAmounts: number Title:
TotalRead Only:trueProject budget line revenue amounts in project ledger currency. - PlanningAmountDetails: array Planning Amount Details Title:
Planning Amount DetailsThe Planning Amount Details resource is used to view a project budget line periodic amounts. - PlanningEndDate: string (date) Title:
Planned Finish DateRead Only:trueProject budget line end date. - PlanningStartDate: string (date) Title:
Planned Start DateRead Only:trueProject budget line start date. - Quantity: number Title:
TotalRead Only:trueMeasure of the effort planned for the project budget line. - RawCostAmounts: number Title:
TotalRead Only:trueProject budget line raw cost amounts in transaction currency. - RbsElementId: integer (int64) Read Only:
trueIdentifier of the resource used to create the project budget line. - ResourceClass: string Title:
Resource ClassRead Only:trueMaximum Length:240A resource type that is available for use within resource format hierarchies on planning resource breakdown structure. - ResourceFormat: string Title:
Resource CombinationRead Only:trueMaximum Length:240Resource format to add resource element to the planning resource breakdown structure. - ResourceName: string Title:
ResourceRead Only:trueMaximum Length:240The name of the resource used to create the project budget line. - RevenueAmounts: number Title:
TotalRead Only:trueProject budget line revenue amounts in transaction currency. - SpreadCurve: string Title:
NameRead Only:trueMaximum Length:240Spread curves distributes quantity, cost, and revenue amounts automatically across accounting or project accounting periods. - StandardBurdenedCostRate: number Read Only:
trueStandard burdened cost rate for project budget line. - StandardRawCostRate: number Read Only:
trueStandard raw cost rate for project budget line. - StandardRevenueRate: number Read Only:
trueStandard revenue rate for project budget line. - TaskId: integer (int64) Title:
Task IDRead Only:trueIdentifier of the task which is used to create a project budget line. - TaskName: string Title:
Task NameRead Only:trueMaximum Length:255Name of the task which is used to create a project budget line. - TaskNumber: string Title:
Task NumberRead Only:trueMaximum Length:100Number of the task which is used to create a project budget line. - TaskSequence: integer (int64) Title:
Task SequenceRead Only:truePosition of the project task in a hierarchical arrangement.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : Planning Amount Details
Type:
arrayTitle:
Planning Amount DetailsThe Planning Amount Details resource is used to view a project budget line periodic amounts.
Show Source Nested Schema : projectBudgetSummary-Tasks-BudgetLines-PlanningAmountDetails-item-response
Type:
Show Source object- BurdenedCostAmounts: number Read Only:
truePeriodic project budget line burdened cost amounts in transaction currency. - EffectiveBurdenedCostRate: number Read Only:
trueEffective burdened cost rate for periodic line. - EffectiveRawCostRate: number Read Only:
trueEffective raw cost rate for periodic line. - EffectiveRevenueRate: number Title:
Effective RateRead Only:trueEffective revenue rate for periodic line. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PCBurdenedCostAmounts: number Title:
Burdened CostRead Only:truePeriodic project budget line burdened cost amounts in project currency. - PCRawCostAmounts: number Title:
TotalRead Only:truePeriodic project budget line raw cost amounts in project currency. - PCRevenueAmounts: number Title:
TotalRead Only:truePeriodic project budget line revenue amounts in project currency. - PeriodName: string Title:
PeriodRead Only:trueMaximum Length:30Period for which the periodic budget amount is entered. - PFCBurdenedCostAmounts: number Read Only:
truePeriodic project budget line burdened cost amounts in project ledger currency. - PFCRawCostAmounts: number Title:
TotalRead Only:truePeriodic project budget line raw cost amounts in project ledger currency. - PFCRevenueAmounts: number Read Only:
truePeriodic project budget line revenue amounts in project ledger currency. - Quantity: number Title:
TotalRead Only:trueMeasure of the effort planned for the project budget line by period. - RawCostAmounts: number Title:
TotalRead Only:truePeriodic project budget line raw cost amounts in transaction currency. - RevenueAmounts: number Read Only:
truePeriodic project budget line revenue amounts in transaction currency. - StandardBurdenedCostRate: number Title:
Effective RateRead Only:trueStandard burdened cost rate for periodic line. - StandardRawCostRate: number Read Only:
trueStandard raw cost rate for periodic line. - StandardRevenueRate: number Read Only:
trueStandard revenue rate for periodic line.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : projectBudgetSummary-VersionErrors-item-response
Type:
Show Source object- ErrorType: string Title:
SeverityRead Only:trueMaximum Length:30Indicates the type of the exception, for example, Error or Warning. - links: array Links Title:
LinksThe link relations associated with the resource instance. - MessageCause: string Read Only:
trueMaximum Length:4000Reason due to which the error in the budget version occurred. - MessageName: string Read Only:
trueMaximum Length:30Name that identifies the message uniquely. - MessageText: string Title:
Message TextRead Only:trueMaximum Length:240Text of the message that indicates the cause and resolution of the error. - MessageUserAction: string Read Only:
trueMaximum Length:4000The action that you must perform to resolve the error. - MessageUserDetails: string Read Only:
trueMaximum Length:4000Additional information about the cause and resolution of the error. - PeriodName: string Title:
PeriodRead Only:trueMaximum Length:30Period for which errors exist in the project budget version. - PlanVersionId: integer Read Only:
trueIdentifier of the project budget version that has errors. - ResourceName: string Title:
ResourceRead Only:trueMaximum Length:240Name of the resource in the project budget version that has errors. - TaskName: string Title:
Task NameRead Only:trueMaximum Length:255Name of the task in the project budget version that has errors. - TaskNumber: string Title:
Task NumberRead Only:trueMaximum Length:100Number of the task in the project budget version that has errors. - TaskSequence: integer (int64) Read Only:
truePosition of the project task in a hierarchical arrangement. - TransactionCurrencyCode: string Title:
Entered CurrencyRead Only:trueMaximum Length:15Planning currency used in the project budget version.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Examples
The following example shows how to get all project budget versions by submitting a GET request on the REST resource using cURL.
curl --user ppm_cloud_user https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectBudgetSummary
Example of Response Body
The following shows an example of the response body in JSON format.
{ "items": [ { "FinancialPlanType": "PSR CostRev Budget", "PlanVersionId": 10733, "PlanVersionNumber": 2, "PlanVersionName": "Version 2", "PlanVersionDescription": null, "PlanVersionStatus": "Current Working", "ProjectId": 999991025, "ProjectNumber": "SMSEG-0000000000000000026", "ProjectName": "SMName-000000000000000026", "PlanningAmounts": "COST_AND_REV_TOGETHER", "PCRawCostAmounts": 1278040, "PCBurdenedCostAmounts": 1917060, "PCRevenueAmounts": 2556080, "PFCRawCostAmounts": 0, "PFCBurdenedCostAmounts": 0, "PFCRevenueAmounts": 0 }