Update an export option for a project forecast version
patch
/fscmRestApi/resources/11.13.18.05/projectForecasts/{PlanVersionId}/child/PlanningOptions/{PlanningOptionId}/child/ExportOptions/{ExportOptionId}
Request
Path Parameters
- ExportOptionId(required): integer Identifier of the project forecast version export options.
- PlanVersionId(required): integer(int64) Identifier of the forecast version.
- PlanningOptionId(required): integer(int64) Identifier of the summary level planning option in the project forecast version.
Header Parameters
- Metadata-Context: string If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: string The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Supported Media Types
- application/json
Root Schema : schema
Type:
Show Source object- ActualBurdenedCostAmounts: string Title:
Burdened Cost: Actual AmountsMaximum Length:1Actual burdened cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualBurdenedCostInPC: string Title:
Burdened Cost in Project Currency: Actual AmountsMaximum Length:1Actual burdened costs incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualBurdenedCostInPLC: string Title:
Burdened Cost in Project Ledger Currency: Actual AmountsMaximum Length:1Actual burdened costs incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualMargin: string Title:
Margin: Actual AmountsMaximum Length:1Difference between actual project-related costs and actual revenue amounts. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualMarginInPC: string Title:
Margin in Project Currency: Actual AmountsMaximum Length:1Difference between actual project-related costs and actual revenue amounts calculated using project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualMarginInPLC: string Title:
Margin in Project Ledger Currency: Actual AmountsMaximum Length:1Difference between actual project-related costs and actual revenue amounts calculated using project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualQuantity: string Title:
Quantity: Actual AmountsMaximum Length:1Actual quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRawCostAmounts: string Title:
Raw Cost: Actual AmountsMaximum Length:1Actual cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRawCostInPC: string Title:
Raw Cost in Project Currency: Actual AmountsMaximum Length:1Actual cost amounts incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRawCostInPLC: string Title:
Raw Cost in Project Ledger Currency: Actual AmountsMaximum Length:1Actual cost amounts incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRevenueAmounts: string Title:
Revenue: Actual AmountsMaximum Length:1Actual revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRevenueInPC: string Title:
Revenue in Project Currency: Actual AmountsMaximum Length:1Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRevenueInPLC: string Title:
Revenue in Project Ledger Currency: Actual AmountsMaximum Length:1Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostEffectiveMultiplier: string Title:
Burdened Cost: Effective MultiplierMaximum Length:1Multiplier used to calculate the burdened costs. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostInvoiceCommitments: string Title:
Burdened Cost Commitments: Supplier InvoicesMaximum Length:1Costs for supplier invoices billed against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostInvoiceCommitmentsInPC: string Title:
Burdened Cost Commitments in Project Currency: Supplier InvoicesMaximum Length:1Burdened costs for supplier invoices billed against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostInvoiceCommitmentsInPLC: string Title:
Burdened Cost Commitments in Project Ledger Currency: Supplier InvoicesMaximum Length:1Burdened costs for supplier invoices billed against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPOCommitments: string Title:
Burdened Cost Commitments: Purchase OrdersMaximum Length:1Burdened costs for purchase orders against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPOCommitmentsInPC: string Title:
Burdened Cost Commitments in Project Currency: Purchase OrdersMaximum Length:1Burdened costs for purchase orders against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPOCommitmentsInPLC: string Title:
Burdened Cost Commitments in Project Ledger Currency: Purchase OrdersMaximum Length:1Burdened costs for purchase orders against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPRCommitments: string Title:
Burdened Cost Commitments: RequisitionsMaximum Length:1Burdened costs for outstanding purchase requisitions against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPRCommitmentsInPC: string Title:
Burdened Cost Commitments in Project Currency: RequisitionsMaximum Length:1Burdened costs for outstanding purchase requisitions against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPRInCommitmentsPLC: string Title:
Burdened Cost Commitments in Project Ledger Currency: RequisitionsMaximum Length:1Burdened costs for outstanding purchase requisitions against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostStandardMultiplier: string Title:
Burdened Cost: Standard MultiplierMaximum Length:1Standard multiplier derived from the burden schedule for calculating burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostStandardRate: string Title:
Burdened Cost: Standard RateMaximum Length:1Standard rate derived from the rate schedule for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - DisplayCommitmentsFlag: boolean Title:
Display CommitmentsIndicates whether to display the external commitments present in the budget or forecast plan lines. - DisplayRatesAndAmountsInMultipleTransactionCurrenciesFlag: boolean Title:
Display currency conversion attributes and amounts in multiple transaction currenciesIndicates whether to display the currency conversion attributes and amounts in multiple transaction currencies if the plan type allows planning in multiple transaction currencies. - EACBurdenedCost: string Title:
Burdened Cost: EACMaximum Length:1Estimate of burdened cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACBurdenedCostInPC: string Title:
Burdened Cost in Project Currency: EACMaximum Length:1Estimate of burdened costs incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACBurdenedCostInPLC: string Title:
Burdened Cost in Project Ledger Currency: EACMaximum Length:1Estimate of burdened costs incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMargin: string Title:
Margin: EACMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMarginInPC: string Title:
Margin in Project Currency: EACMaximum Length:1Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMarginInPLC: string Title:
Margin in Project Ledger Currency: EACMaximum Length:1Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMarginPercentage: string Title:
Margin Percentage: EACMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACQuantity: string Title:
Quantity: EACMaximum Length:1Estimate-at-completion quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRawCost: string Title:
Raw Cost: EACMaximum Length:1Estimate of cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRawCostInPC: string Title:
Raw Cost in Project Currency: EACMaximum Length:1Estimate of cost amounts incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRawCostInPLC: string Title:
Raw Cost in Project Ledger Currency: EACMaximum Length:1Estimate of cost amounts incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRevenue: string Title:
Revenue: EACMaximum Length:201Estimate-at-completion revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRevenueInPC: string Title:
Revenue in Project Currency: EACMaximum Length:1Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRevenueInPLC: string Title:
Revenue in Project Ledger Currency: EACMaximum Length:1Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EffectiveBurdenedCostRate: string Title:
Burdened Cost: Effective RateMaximum Length:1User entered rate for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EffectiveRawCostRate: string Title:
Raw Cost: Effective RateMaximum Length:1User entered rate for calculating the raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EffectiveRevenueRate: string Title:
Effective Revenue RateMaximum Length:1User entered rate for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCBurdenedCost: string Title:
Burdened Cost: ETCMaximum Length:1Estimate of burdened cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCBurdenedCostInPC: string Title:
Burdened Cost in Project Currency: ETCMaximum Length:1Estimate of burdened costs to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCBurdenedCostInPLC: string Title:
Burdened Cost in Project Ledger Currency: ETCMaximum Length:1Estimate of burdened costs to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMargin: string Title:
Margin: ETCMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMarginInPC: string Title:
Margin in Project Currency: ETCMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMarginInPLC: string Maximum Length:
1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMarginPercentage: string Title:
Margin Percentage: ETCMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCQuantity: string Title:
Quantity: ETCMaximum Length:1Estimate-to-complete quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRawCost: string Title:
Raw Cost: ETCMaximum Length:1Estimate of cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRawCostInPC: string Title:
Raw Cost in Project Currency: ETCMaximum Length:1Estimate of cost amounts to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRawCostInPLC: string Title:
Raw Cost in Project Ledger Currency: ETCMaximum Length:1Estimate of cost amounts to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRevenue: string Title:
ETC RevenueMaximum Length:1Estimate-to-complete revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRevenueInPC: string Title:
Revenue in Project Currency: ETCMaximum Length:1Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRevenueInPLC: string Title:
Revenue in Project Ledger Currency: ETCMaximum Length:1Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ExportOptionId: integer Title:
Export Options IDIdentifier of the project forecast version export options. - FromDate: string Title:
From DateMaximum Length:1From date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionCostDate: string Title:
Project Currency Conversion: Cost DateMaximum Length:1Date that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionCostDateType: string Title:
Project Currency Conversion: Cost Date TypeMaximum Length:1Date type that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionCostRate: string Title:
Project Currency Conversion: Cost RateMaximum Length:1Cost rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionCostRateType: string Title:
Project Currency Conversion: Cost Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueDate: string Title:
Project Currency Conversion: Revenue DateMaximum Length:1Date that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueDateType: string Title:
Project Currency Conversion: Revenue Date TypeMaximum Length:1Date type that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueRate: string Title:
Project Currency Conversion: Revenue RateMaximum Length:1Revenue rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueRateType: string Title:
Project Currency Conversion: Revenue Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostDate: string Title:
Project Ledger Currency Conversion: Cost DateMaximum Length:1Date that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostDateType: string Title:
Project Ledger Currency Conversion: Cost Date TypeMaximum Length:1Date type that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostRate: string Title:
Project Ledger Currency Conversion: Cost RateMaximum Length:1Cost rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostRateType: string Title:
Project Ledger Currency Conversion: Cost Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueDate: string Title:
Project Ledger Currency Conversion: Revenue DateMaximum Length:1Date that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueDateType: string Title:
Project Ledger Currency Conversion: Revenue Date TypeMaximum Length:1Date type that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueRate: string Title:
Project Ledger Currency Conversion: Revenue RateMaximum Length:1Revenue rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueRateType: string Title:
Project Ledger Currency Conversion: Revenue Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - QuantityInvoiceCommitments: string Title:
Quantity Commitments: Supplier InvoicesMaximum Length:1Planned quantity of supplier invoice commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - QuantityPOCommitments: string Title:
Quantity Commitments: Purchase OrdersMaximum Length:1Planned quantity of purchase order commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - QuantityPRCommitments: string Title:
Quantity Commitments: RequisitionsMaximum Length:1Planned quantity of purchase requisition commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostInvoiceCommitments: string Title:
Raw Cost Commitments: Supplier InvoicesMaximum Length:1Costs from supplier invoices that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostInvoiceCommitmentsInPC: string Title:
Raw Cost Commitments in Project Currency: Supplier InvoicesMaximum Length:1Costs from supplier invoices that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostInvoiceCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Ledger Currency: Supplier InvoicesMaximum Length:1Costs from supplier invoices that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPOCommitments: string Title:
Raw Cost Commitments: Purchase OrdersMaximum Length:1Purchase order costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPOCommitmentsInPC: string Title:
Raw Cost Commitments in Project Currency: Purchase OrdersMaximum Length:1Purchase order costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPOCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Ledger Currency: Purchase OrdersMaximum Length:1Purchase order costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPRCommitments: string Title:
Raw Cost Commitments: RequisitionsMaximum Length:1Purchase requisition costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPRCommitmentsInPC: string Title:
Raw Cost Commitments in Project Currency: RequisitionsMaximum Length:1Purchase requisition costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPRCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Ledger Currency: RequisitionsMaximum Length:1Purchase requisition costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - StandardRawCostRate: string Title:
Raw Cost: Standard RateMaximum Length:1Rate derived from the rate schedule for calculating raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - StandardRevenueRate: string Title:
Revenue: Standard RateMaximum Length:1Rate derived from the rate schedule for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ToDate: string Title:
To DateMaximum Length:1End date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalBurdenedCostCommitments: string Title:
Burdened Cost: Total CommitmentsMaximum Length:1Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalBurdenedCostCommitmentsInPC: string Title:
Burdened Cost in Project Currency: Total CommitmentsMaximum Length:1Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalBurdenedCostCommitmentsInPLC: string Title:
Burdened Cost in Project Ledger Currency: Total CommitmentsMaximum Length:1Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalQuantityCommitments: string Title:
Quantity: Total CommitmentsMaximum Length:1Total commitments quantity required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalRawCostCommitments: string Title:
Raw Cost: Total CommitmentsMaximum Length:1Total commitments incurred by the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalRawCostCommitmentsInPC: string Title:
Raw Cost in Project Currency: Total CommitmentsMaximum Length:1Total commitments incurred by the project in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalRawCostCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Currency: Total CommitmentsMaximum Length:1Total commitments incurred by the project in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - UnitOfMeasure: string Title:
Unit of MeasureMaximum Length:1Unit of measure for a resource. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
Response
Supported Media Types
- application/json
Default Response
The following table describes the default response for this task.
Headers
- Metadata-Context: If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
- REST-Framework-Version: The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Root Schema : projectForecasts-PlanningOptions-ExportOptions-item-response
Type:
Show Source object- ActualBurdenedCostAmounts: string Title:
Burdened Cost: Actual AmountsMaximum Length:1Actual burdened cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualBurdenedCostInPC: string Title:
Burdened Cost in Project Currency: Actual AmountsMaximum Length:1Actual burdened costs incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualBurdenedCostInPLC: string Title:
Burdened Cost in Project Ledger Currency: Actual AmountsMaximum Length:1Actual burdened costs incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualMargin: string Title:
Margin: Actual AmountsMaximum Length:1Difference between actual project-related costs and actual revenue amounts. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualMarginInPC: string Title:
Margin in Project Currency: Actual AmountsMaximum Length:1Difference between actual project-related costs and actual revenue amounts calculated using project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualMarginInPLC: string Title:
Margin in Project Ledger Currency: Actual AmountsMaximum Length:1Difference between actual project-related costs and actual revenue amounts calculated using project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualQuantity: string Title:
Quantity: Actual AmountsMaximum Length:1Actual quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRawCostAmounts: string Title:
Raw Cost: Actual AmountsMaximum Length:1Actual cost amounts incurred on the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRawCostInPC: string Title:
Raw Cost in Project Currency: Actual AmountsMaximum Length:1Actual cost amounts incurred on the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRawCostInPLC: string Title:
Raw Cost in Project Ledger Currency: Actual AmountsMaximum Length:1Actual cost amounts incurred on the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRevenueAmounts: string Title:
Revenue: Actual AmountsMaximum Length:1Actual revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRevenueInPC: string Title:
Revenue in Project Currency: Actual AmountsMaximum Length:1Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ActualRevenueInPLC: string Title:
Revenue in Project Ledger Currency: Actual AmountsMaximum Length:1Actual revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostEffectiveMultiplier: string Title:
Burdened Cost: Effective MultiplierMaximum Length:1Multiplier used to calculate the burdened costs. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostInvoiceCommitments: string Title:
Burdened Cost Commitments: Supplier InvoicesMaximum Length:1Costs for supplier invoices billed against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostInvoiceCommitmentsInPC: string Title:
Burdened Cost Commitments in Project Currency: Supplier InvoicesMaximum Length:1Burdened costs for supplier invoices billed against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostInvoiceCommitmentsInPLC: string Title:
Burdened Cost Commitments in Project Ledger Currency: Supplier InvoicesMaximum Length:1Burdened costs for supplier invoices billed against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPOCommitments: string Title:
Burdened Cost Commitments: Purchase OrdersMaximum Length:1Burdened costs for purchase orders against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPOCommitmentsInPC: string Title:
Burdened Cost Commitments in Project Currency: Purchase OrdersMaximum Length:1Burdened costs for purchase orders against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPOCommitmentsInPLC: string Title:
Burdened Cost Commitments in Project Ledger Currency: Purchase OrdersMaximum Length:1Burdened costs for purchase orders against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPRCommitments: string Title:
Burdened Cost Commitments: RequisitionsMaximum Length:1Burdened costs for outstanding purchase requisitions against the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPRCommitmentsInPC: string Title:
Burdened Cost Commitments in Project Currency: RequisitionsMaximum Length:1Burdened costs for outstanding purchase requisitions against the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostPRInCommitmentsPLC: string Title:
Burdened Cost Commitments in Project Ledger Currency: RequisitionsMaximum Length:1Burdened costs for outstanding purchase requisitions against the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostStandardMultiplier: string Title:
Burdened Cost: Standard MultiplierMaximum Length:1Standard multiplier derived from the burden schedule for calculating burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - BurdenedCostStandardRate: string Title:
Burdened Cost: Standard RateMaximum Length:1Standard rate derived from the rate schedule for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - DisplayCommitmentsFlag: boolean Title:
Display CommitmentsIndicates whether to display the external commitments present in the budget or forecast plan lines. - DisplayRatesAndAmountsInMultipleTransactionCurrenciesFlag: boolean Title:
Display currency conversion attributes and amounts in multiple transaction currenciesIndicates whether to display the currency conversion attributes and amounts in multiple transaction currencies if the plan type allows planning in multiple transaction currencies. - EACBurdenedCost: string Title:
Burdened Cost: EACMaximum Length:1Estimate of burdened cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACBurdenedCostInPC: string Title:
Burdened Cost in Project Currency: EACMaximum Length:1Estimate of burdened costs incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACBurdenedCostInPLC: string Title:
Burdened Cost in Project Ledger Currency: EACMaximum Length:1Estimate of burdened costs incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMargin: string Title:
Margin: EACMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMarginInPC: string Title:
Margin in Project Currency: EACMaximum Length:1Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMarginInPLC: string Title:
Margin in Project Ledger Currency: EACMaximum Length:1Estimated difference between project-related costs and revenue amounts at the completion of the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACMarginPercentage: string Title:
Margin Percentage: EACMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts at the completion of the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACQuantity: string Title:
Quantity: EACMaximum Length:1Estimate-at-completion quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRawCost: string Title:
Raw Cost: EACMaximum Length:1Estimate of cost amounts incurred on the project at completion. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRawCostInPC: string Title:
Raw Cost in Project Currency: EACMaximum Length:1Estimate of cost amounts incurred on the project at completion, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRawCostInPLC: string Title:
Raw Cost in Project Ledger Currency: EACMaximum Length:1Estimate of cost amounts incurred on the project at completion, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRevenue: string Title:
Revenue: EACMaximum Length:201Estimate-at-completion revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRevenueInPC: string Title:
Revenue in Project Currency: EACMaximum Length:1Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EACRevenueInPLC: string Title:
Revenue in Project Ledger Currency: EACMaximum Length:1Estimate-at-completion revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EffectiveBurdenedCostRate: string Title:
Burdened Cost: Effective RateMaximum Length:1User entered rate for calculating the burdened cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EffectiveRawCostRate: string Title:
Raw Cost: Effective RateMaximum Length:1User entered rate for calculating the raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - EffectiveRevenueRate: string Title:
Effective Revenue RateMaximum Length:1User entered rate for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCBurdenedCost: string Title:
Burdened Cost: ETCMaximum Length:1Estimate of burdened cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCBurdenedCostInPC: string Title:
Burdened Cost in Project Currency: ETCMaximum Length:1Estimate of burdened costs to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCBurdenedCostInPLC: string Title:
Burdened Cost in Project Ledger Currency: ETCMaximum Length:1Estimate of burdened costs to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMargin: string Title:
Margin: ETCMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMarginInPC: string Title:
Margin in Project Currency: ETCMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMarginInPLC: string Maximum Length:
1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCMarginPercentage: string Title:
Margin Percentage: ETCMaximum Length:1Estimated difference between actual project-related costs and actual revenue amounts to complete the task or project, denoted as a percentage. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCQuantity: string Title:
Quantity: ETCMaximum Length:1Estimate-to-complete quantity of resource effort spent on a task or project, including labor and equipment. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRawCost: string Title:
Raw Cost: ETCMaximum Length:1Estimate of cost amounts to be incurred to complete the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRawCostInPC: string Title:
Raw Cost in Project Currency: ETCMaximum Length:1Estimate of cost amounts to be incurred to complete the project, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRawCostInPLC: string Title:
Raw Cost in Project Ledger Currency: ETCMaximum Length:1Estimate of cost amounts to be incurred to complete the project, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRevenue: string Title:
ETC RevenueMaximum Length:1Estimate-to-complete revenue that's associated with the accounting period or a plan line in the forecast. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRevenueInPC: string Title:
Revenue in Project Currency: ETCMaximum Length:1Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ETCRevenueInPLC: string Title:
Revenue in Project Ledger Currency: ETCMaximum Length:1Estimate-to-complete revenue that's associated with the accounting period or a financial plan line in the forecast, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ExportOptionId: integer Title:
Export Options IDIdentifier of the project forecast version export options. - FromDate: string Title:
From DateMaximum Length:1From date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - links: array Links Title:
LinksThe link relations associated with the resource instance. - PlanningCurrency: string Title:
Planning CurrencyRead Only:trueMaximum Length:1Currency used for planning in the forecast line. This value is always set to true and the attribute is exported. - PlanningResource: string Title:
Planning ResourceRead Only:trueMaximum Length:1Resource used for financial planning in the forecast line. This value is always set to true and the attribute is exported. - ProjectCurrencyConversionCostDate: string Title:
Project Currency Conversion: Cost DateMaximum Length:1Date that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionCostDateType: string Title:
Project Currency Conversion: Cost Date TypeMaximum Length:1Date type that's used as a cost conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionCostRate: string Title:
Project Currency Conversion: Cost RateMaximum Length:1Cost rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionCostRateType: string Title:
Project Currency Conversion: Cost Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueDate: string Title:
Project Currency Conversion: Revenue DateMaximum Length:1Date that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueDateType: string Title:
Project Currency Conversion: Revenue Date TypeMaximum Length:1Date type that's used as a revenue conversion attribute for project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueRate: string Title:
Project Currency Conversion: Revenue RateMaximum Length:1Revenue rate used when converting the amounts to project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectCurrencyConversionRevenueRateType: string Title:
Project Currency Conversion: Revenue Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostDate: string Title:
Project Ledger Currency Conversion: Cost DateMaximum Length:1Date that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostDateType: string Title:
Project Ledger Currency Conversion: Cost Date TypeMaximum Length:1Date type that's used as a cost conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostRate: string Title:
Project Ledger Currency Conversion: Cost RateMaximum Length:1Cost rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionCostRateType: string Title:
Project Ledger Currency Conversion: Cost Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueDate: string Title:
Project Ledger Currency Conversion: Revenue DateMaximum Length:1Date that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueDateType: string Title:
Project Ledger Currency Conversion: Revenue Date TypeMaximum Length:1Date type that's used as a revenue conversion attribute for project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueRate: string Title:
Project Ledger Currency Conversion: Revenue RateMaximum Length:1Revenue rate used when converting the amounts to project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ProjectLedgerCurrencyConversionRevenueRateType: string Title:
Project Ledger Currency Conversion: Revenue Rate TypeMaximum Length:1The type of currency conversion rate for the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - QuantityInvoiceCommitments: string Title:
Quantity Commitments: Supplier InvoicesMaximum Length:1Planned quantity of supplier invoice commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - QuantityPOCommitments: string Title:
Quantity Commitments: Purchase OrdersMaximum Length:1Planned quantity of purchase order commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - QuantityPRCommitments: string Title:
Quantity Commitments: RequisitionsMaximum Length:1Planned quantity of purchase requisition commitments required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostInvoiceCommitments: string Title:
Raw Cost Commitments: Supplier InvoicesMaximum Length:1Costs from supplier invoices that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostInvoiceCommitmentsInPC: string Title:
Raw Cost Commitments in Project Currency: Supplier InvoicesMaximum Length:1Costs from supplier invoices that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostInvoiceCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Ledger Currency: Supplier InvoicesMaximum Length:1Costs from supplier invoices that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPOCommitments: string Title:
Raw Cost Commitments: Purchase OrdersMaximum Length:1Purchase order costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPOCommitmentsInPC: string Title:
Raw Cost Commitments in Project Currency: Purchase OrdersMaximum Length:1Purchase order costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPOCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Ledger Currency: Purchase OrdersMaximum Length:1Purchase order costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPRCommitments: string Title:
Raw Cost Commitments: RequisitionsMaximum Length:1Purchase requisition costs that are directly attributable to work performed. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPRCommitmentsInPC: string Title:
Raw Cost Commitments in Project Currency: RequisitionsMaximum Length:1Purchase requisition costs that are directly attributable to work performed, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - RawCostPRCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Ledger Currency: RequisitionsMaximum Length:1Purchase requisition costs that are directly attributable to work performed, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - ResourceClass: string Title:
Resource ClassRead Only:trueMaximum Length:1Resource class associated with the forecast line. This value is always set to true and the attribute is exported. - SpreadCurve: string Title:
Spread CurveRead Only:trueMaximum Length:1Spread curve associated with the forecast line. This value is always set to true and the attribute is exported. - StandardRawCostRate: string Title:
Raw Cost: Standard RateMaximum Length:1Rate derived from the rate schedule for calculating raw cost. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - StandardRevenueRate: string Title:
Revenue: Standard RateMaximum Length:1Rate derived from the rate schedule for calculating revenue. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TaskName: string Title:
Task NameRead Only:trueMaximum Length:1Name assigned to a task. This value is always set to true and the attribute is exported. - TaskNumber: string Title:
Task NumberRead Only:trueMaximum Length:1Number of the task. This value is always set to true and the attribute is exported. - ToDate: string Title:
To DateMaximum Length:1End date of the forecast line. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalBurdenedCostCommitments: string Title:
Burdened Cost: Total CommitmentsMaximum Length:1Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalBurdenedCostCommitmentsInPC: string Title:
Burdened Cost in Project Currency: Total CommitmentsMaximum Length:1Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalBurdenedCostCommitmentsInPLC: string Title:
Burdened Cost in Project Ledger Currency: Total CommitmentsMaximum Length:1Total burdened costs for all commitments such as purchase order, supplier invoices, and requisitions, denoted in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalQuantityCommitments: string Title:
Quantity: Total CommitmentsMaximum Length:1Total commitments quantity required to complete a project or task. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalRawCostCommitments: string Title:
Raw Cost: Total CommitmentsMaximum Length:1Total commitments incurred by the project. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalRawCostCommitmentsInPC: string Title:
Raw Cost in Project Currency: Total CommitmentsMaximum Length:1Total commitments incurred by the project in project currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - TotalRawCostCommitmentsInPLC: string Title:
Raw Cost Commitments in Project Currency: Total CommitmentsMaximum Length:1Total commitments incurred by the project in project ledger currency. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export. - UnitOfMeasure: string Title:
Unit of MeasureMaximum Length:1Unit of measure for a resource. A value of Y indicates that the attribute is selected for export. A value of N indicates that the attribute isn't selected for export.
Nested Schema : Links
Type:
arrayTitle:
LinksThe link relations associated with the resource instance.
Show Source Nested Schema : link
Type:
Show Source object- href: string Title:
hyperlink referenceThe URI to the related resource. - kind: string Title:
kindAllowed Values:[ "collection", "item", "describe", "other" ]The kind of the related resource. - name: string Title:
nameThe name of the link to the related resource. - properties: object properties
- rel: string Title:
relationAllowed Values:[ "self", "lov", "parent", "canonical", "child", "enclosure", "action", "custom" ]The name of the relation to the resource instance. Example: self.
Nested Schema : properties
Type:
Show Source object- changeIndicator: string Change indicator or the ETag value of the resource instance.
Examples
The following example shows how to update an export option for a project forecast version by submitting a PATCH request on the REST resource using cURL.
curl --user ppm_cloud_user -X PATCH -d @example_request_payload.json https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/<PlanVersionId>/child/PlanningOptions/{PlanningOptionId}/child/ExportOptions/{ExportOptionId} Request Body Example
The following shows an example of the request body in JSON format.
{ "PlanningCurrency": "Y", "PlanningResource": "Y", "ResourceClass": "Y", "SpreadCurve": "Y", "TaskName": "Y", "TaskNumber": "Y", "BurdenedCostStandardMultiplier": "Y", "BurdenedCostStandardRate": "Y", "StandardRawCostRate": "Y", "ProjectCurrencyConversionCostRate": "Y", "ProjectCurrencyConversionCostDate": "Y", "ProjectCurrencyConversionCostDateType": "Y", "ProjectCurrencyConversionCostRateType": "Y", "ProjectLedgerCurrencyConversionCostRate": "Y", "ProjectLedgerCurrencyConversionCostDate": "Y", "ProjectLedgerCurrencyConversionCostDateType": "Y", "ProjectLedgerCurrencyConversionCostRateType": "Y", "ProjectCurrencyConversionRevenueRate": "Y", "ProjectCurrencyConversionRevenueDate": "Y", "ProjectCurrencyConversionRevenueDateType": "Y", "ProjectCurrencyConversionRevenueRateType": "Y", "ProjectLedgerCurrencyConversionRevenueRate": "Y", "ProjectLedgerCurrencyConversionRevenueDate": "Y", "ProjectLedgerCurrencyConversionRevenueDateType": "Y", "ProjectLedgerCurrencyConversionRevenueRateType": "Y", "StandardRevenueRate": "Y", "EffectiveBurdenedCostRate": "Y", "EffectiveRawCostRate": "Y", "EffectiveRevenueRate": "Y", "ToDate": "Y", "BurdenedCostEffectiveMultiplier": "Y", "FromDate": "Y", "UnitOfMeasure": "Y", "ActualBurdenedCostAmounts": "Y", "ActualQuantity": "Y", "ActualRawCostAmounts": "Y", "BurdenedCostPOCommitmentsInPC": "N", "BurdenedCostPRCommitmentsInPC": "N", "BurdenedCostInvoiceCommitmentsInPC": "N", "BurdenedCostPOCommitmentsInPLC": "N", "BurdenedCostPRInCommitmentsPLC": "N", "BurdenedCostInvoiceCommitmentsInPLC": "N", "BurdenedCostPOCommitments": "N", "BurdenedCostPRCommitments": "N", "BurdenedCostInvoiceCommitments": "N", "ActualBurdenedCostInPC": "N", "EACBurdenedCostInPC": "Y", "ETCBurdenedCostInPC": "Y", "TotalBurdenedCostCommitmentsInPC": "N", "ActualBurdenedCostInPLC": "Y", "EACBurdenedCostInPLC": "Y", "ETCBurdenedCostInPLC": "Y", "TotalBurdenedCostCommitmentsInPLC": "N", "EACBurdenedCost": "Y", "EACQuantity": "Y", "EACRawCost": "Y", "ETCBurdenedCost": "Y", "ETCQuantity": "Y", "ETCRawCost": "Y" } Response Body Example
The following shows an example of the response body in JSON format.
{ "ExportOptionId": 300100560234598, "DisplayRatesAndAmountsInMultipleTransactionCurrenciesFlag": null, "DisplayCommitmentsFlag": null, "PlanningCurrency": "Y", "PlanningResource": "Y", "ResourceClass": "Y", "SpreadCurve": "Y", "TaskName": "Y", "TaskNumber": "Y", "BurdenedCostStandardMultiplier": "N", "BurdenedCostStandardRate": "N", "StandardRawCostRate": "N", "ProjectCurrencyConversionCostRate": null, "ProjectCurrencyConversionCostDate": "N", "ProjectCurrencyConversionCostDateType": "N", "ProjectCurrencyConversionCostRateType": "N", "ProjectLedgerCurrencyConversionCostRate": null, "ProjectLedgerCurrencyConversionCostDate": "N", "ProjectLedgerCurrencyConversionCostDateType": "N", "ProjectLedgerCurrencyConversionCostRateType": "N", "ProjectCurrencyConversionRevenueRate": null, "ProjectCurrencyConversionRevenueDate": "N", "ProjectCurrencyConversionRevenueDateType": "N", "ProjectCurrencyConversionRevenueRateType": "N", "ProjectLedgerCurrencyConversionRevenueRate": null, "ProjectLedgerCurrencyConversionRevenueDate": "N", "ProjectLedgerCurrencyConversionRevenueDateType": "N", "ProjectLedgerCurrencyConversionRevenueRateType": "N", "StandardRevenueRate": "N", "EffectiveBurdenedCostRate": "N", "EffectiveRawCostRate": "N", "EffectiveRevenueRate": "N", "ToDate": "Y", "BurdenedCostEffectiveMultiplier": "N", "FromDate": "Y", "UnitOfMeasure": "Y", "ActualBurdenedCostAmounts": "N", "ActualQuantity": "N", "ActualRawCostAmounts": "N", "BurdenedCostPOCommitmentsInPC": "N", "BurdenedCostPRCommitmentsInPC": "N", "BurdenedCostInvoiceCommitmentsInPC": "N", "BurdenedCostPOCommitmentsInPLC": "N", "BurdenedCostPRInCommitmentsPLC": "N", "BurdenedCostInvoiceCommitmentsInPLC": "N", "BurdenedCostPOCommitments": "N", "BurdenedCostPRCommitments": "N", "BurdenedCostInvoiceCommitments": "N", "ActualBurdenedCostInPC": "N", "EACBurdenedCostInPC": "N", "ETCBurdenedCostInPC": "N", "TotalBurdenedCostCommitmentsInPC": "N", "ActualBurdenedCostInPLC": "N", "EACBurdenedCostInPLC": "N", "ETCBurdenedCostInPLC": "N", "TotalBurdenedCostCommitmentsInPLC": "N", "EACBurdenedCost": "Y", "EACQuantity": "Y", "EACRawCost": "Y", "ETCBurdenedCost": "Y", "ETCQuantity": "Y", "ETCRawCost": "Y", "ActualMargin": "N", "EACMargin": "N", "ETCMargin": "N", "ActualMarginInPC": "N", "EACMarginInPC": "N", "ETCMarginInPC": "N", "EACMarginPercentage": "N", "ETCMarginPercentage": "N", "ActualMarginInPLC": "N", "EACMarginInPLC": "N", "ETCMarginInPLC": "N", "ActualRevenueInPC": "N", "ActualRevenueInPLC": "N", "QuantityPOCommitments": "N", "QuantityPRCommitments": "N", "QuantityInvoiceCommitments": "N", "RawCostPOCommitmentsInPC": "N", "RawCostPRCommitmentsInPC": "N", "RawCostInvoiceCommitmentsInPC": "N", "RawCostPOCommitmentsInPLC": "N", "RawCostPRCommitmentsInPLC": "N", "RawCostInvoiceCommitmentsInPLC": "N", "RawCostPOCommitments": "N", "RawCostPRCommitments": "N", "RawCostInvoiceCommitments": "N", "ActualRawCostInPC": "N", "EACRawCostInPC": "N", "ETCRawCostInPC": "N", "TotalRawCostCommitmentsInPC": "N", "ActualRawCostInPLC": "N", "EACRawCostInPLC": "N", "ETCRawCostInPLC": "N", "TotalRawCostCommitmentsInPLC": "N", "ActualRevenueAmounts": "N", "EACRevenue": "Y", "ETCRevenue": "Y", "EACRevenueInPC": "N", "ETCRevenueInPC": "N", "EACRevenueInPLC": "N", "ETCRevenueInPLC": "N", "TotalBurdenedCostCommitments": "N", "TotalQuantityCommitments": "N", "TotalRawCostCommitments": "N", "links": [ { "rel": "self", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100560234595/child/PlanningOptions/300100560234597/child/ExportOptions/300100560234598", "name": "ExportOptions", "kind": "item", "properties": { "changeIndicator": "ACED0005737200136A6176612E7574696C2E41727261794C6973747881D21D99C7619D03000149000473697A65787000000001770400000001737200116A6176612E6C616E672E496E746567657212E2A0A4F781873802000149000576616C7565787200106A6176612E6C616E672E4E756D62657286AC951D0B94E08B02000078700000000178" } }, { "rel": "canonical", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100560234595/child/PlanningOptions/300100560234597/child/ExportOptions/300100560234598", "name": "ExportOptions", "kind": "item" }, { "rel": "parent", "href": "https://your_organization.com:port/fscmRestApi/resources/11.13.18.05/projectForecasts/300100560234595/child/PlanningOptions/300100560234597", "name": "PlanningOptions", "kind": "item" } ] }