Root Schema : projectProgramInsights-item-response
Type: object
Show Source - ACBudgetLaborCost: number
Read Only: true
The total at completion for the labor cost from the current baseline budget.
- ACBudgetMargin: number
Read Only: true
The total-at-completion value for the current baseline budget revenue minus the current baseline budget cost.
- ACCurrentandOriginalBudgetCostVariancePercentage: number
Read Only: true
The percentage at completion for the current baseline budget cost minus the original baseline budget cost, divided by the current baseline budget cost.
- ACDurationinDays: number
Read Only: true
The total at completion for the days from the start date.
- ACOriginalBudgetandActualCostVariance: number
Read Only: true
The total at completion for the original baseline budget cost minus the actual cost.
- ACOriginalBudgetandEACForecastCostVariance: number
Read Only: true
The total at completion for the original baseline budget cost minus the estimate-at-completion for the current approved forecast cost.
- ACOriginalBudgetandEACForecastMarginVariance: number
Read Only: true
The total at completion for the original baseline budget margin minus the estimate-at-completion for the current approved forecast margin.
- ACOriginalBudgetandEACForecastRevenueVariance: number
Read Only: true
The total at completion for the original baseline budget revenue minus the estimate-at-completion for the current approved forecast revenue.
- ACOriginalBudgetCost: number
Read Only: true
The total at completion for the burdened cost from the original baseline budget.
- ACOriginalBudgetLaborEffortinHours: number
Read Only: true
The total at completion for the labor effort from the original baseline budget.
- ActualWorkPlanEffortinHours: number
Read Only: true
The actual effort worked for a work plan.
- AmountToBill: number
Read Only: true
Amount to bill.
- AsOfPeriodEndDate: string (date-time)
Read Only: true
The end date for the program calendar period. The period with this end date is the as-of-period for the measure time dimension.
- AsOfPeriodName: string
Read Only: true
The name of the program calendar period. The period with this name is the as-of-period for the measure time dimension.
- AsOfPeriodStartDate: string (date-time)
Read Only: true
The start date for the program calendar period. The period with this start date is the as-of-period for the measure time dimension.
- AssessmentCode: string
Title: Assessment Code
Read Only: true
Maximum Length: 30
The code that represents the program owner's ongoing assessment for the likelihood that the program will meet the program objectives. Examples for assessments are On track and At risk. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_ASSESSMENT. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- AssessmentMeaning: string
Read Only: true
Maximum Length: 80
The program owner's ongoing assessment for the likelihood that the program will meet the program objectives. Examples for assessments are On track and At risk. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_ASSESSMENT. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- AssignmentsEndingSoon: number
Read Only: true
The number of resources with assignments to the project that are scheduled to end within the next two weeks.
- AssignmentsReserved: number
Read Only: true
The number of resources with reserved assignments to the project.
- CostPerformanceIndex: number
- CreatedBy: string
Read Only: true
Maximum Length: 64
The user who created the record.
- CreationDate: string (date-time)
Read Only: true
The date when the record was created.
- CurrencyCode: string
Read Only: true
The currency code for the monetary performance measures. A list of accepted values is available from the Program User Preferences API.
- Description: string
Title: Description
Read Only: true
Maximum Length: 2000
The description of the program or project.
- EACBudgetCost: number
Read Only: true
The total at completion for the burdened cost from the current baseline budget.
- EACBudgetLaborEffort: number
Read Only: true
The total at completion for the labor effort from the current baseline budget.
- EACBudgetRevenue: number
Read Only: true
The estimate-at-completion value for the revenue from the current baseline budget.
- EACCurrentandOriginalBudgetMarginVariance: number
Read Only: true
The estimate-at-completion for the current baseline budget margin minus the original baseline budget margin.
- EACCurrentandOriginalBudgetRevenueVariance: number
Read Only: true
The estimate-at-completion for the current baseline budget revenue minus the original baseline budget revenue.
- EACCurrentandPreviousForecastCostVariance: number
Read Only: true
The estimate-at-completion for the current approved forecast burdened cost minus the previously approved forecast burdened cost.
- EACCurrentandPreviousForecastLaborEffortVariance: number
Read Only: true
The estimate-at-completion for the current approved forecast labor effort minus the previously approved forecast labor effort.
- EACCurrentandPreviousForecastMarginVariance: number
Read Only: true
The estimate-at-completion for the current approved forecast margin minus the previously approved forecast margin.
- EACCurrentandPreviousForecastRevenueVariance: number
Read Only: true
The estimate-at-completion for the current approved forecast revenue minus the previously approved forecast revenue.
- EACForecastLaborCost: number
Read Only: true
The estimate-at-completion for the labor cost from the current approved forecast.
- EACForecastLaborEffort: number
Read Only: true
The estimate-at-completion for the labor effort from the current approved forecast.
- EACForecastLaborEffortVariancePercentage: number
Read Only: true
The estimated percentage at completion for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
- EACForecastMargin: number
Read Only: true
The total-at-completion value for the current approved forecast revenue minus the current approved forecast cost.
- EACForecastRevenue: number
Read Only: true
The estimate-at-completion value of the revenue from the current approved forecast.
- EarnedValue: number
Read Only: true
The planned value multiplied by the project completion percentage.
- EarnedValueCostVariance: number
Read Only: true
The earned value minus the actual cost.
- EarnedValueScheduleVariance: number
Read Only: true
The earned value minus the planned value.
- EstimatetoCompleteCost: number
Read Only: true
The estimate-to-complete for the current approved forecast burdened cost minus the actual burdened cost.
- EstimatetoCompleteLaborEffortinHours: number
Read Only: true
The estimate-to-complete for the current approved forecast labor effort minus the actual labor effort.
- FinishDate: string (date)
Title: Finish Date
Read Only: true
The date when the program or project is completed.
- Image: string (byte)
Read Only: true
The base 64 encoded image.
- ImageId: integer (int64)
Read Only: true
The unique identifier of the image for a program.
- ImageName: string
Read Only: true
Maximum Length: 240
The name of the image.
- IncludePerformanceMeasuresFlag: string
- InvoicesAwaitingApproval: number
Read Only: true
The number of invoices submitted for the project that are pending approval.
- ITDActualandCommittedCost: number
Read Only: true
The inception-to-date actual burdened cost plus the committed cost.
- ITDActualandCommittedCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost plus the committed cost.
- ITDActualCapitalizableCost: number
Read Only: true
The inception-to-date actual burdened cost that's eligible to capitalize against an asset.
- ITDActualCapitalizableCostPercentage: number
Read Only: true
The inception-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
- ITDActualCapitalizableCostPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
- ITDActualCapitalizableCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost that's eligible for capitalization against an asset.
- ITDActualCost: number
Read Only: true
The inception-to-date actual cost including raw and burden cost.
- ITDActualCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual cost, including raw and burden cost.
- ITDActualInvoiceAmount: number
Read Only: true
The inception-to-date actual amount invoiced to customer excluding tax.
- ITDActualLaborCost: number
Read Only: true
The inception-to-date value of the actual raw labor cost and actual burden labor cost.
- ITDActualLaborCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to create the trend of the inception-to-date value of actual raw labor cost and actual burden labor cost.
- ITDActualLaborEffort: number
Read Only: true
The inception-to-date actual billable labor effort plus the actual nonbillable labor effort.
- ITDActualLaborEffortPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual billable labor effort plus the actual nonbillable labor effort.
- ITDActualMargin: number
Read Only: true
The inception-to-date actual revenue minus the actual burdened cost.
- ITDActualMarginPercentage: number
Read Only: true
The inception-to-date percentage for the actual margin divided by the actual revenue.
- ITDActualMarginPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual margin divided by the actual revenue.
- ITDActualMarginPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual revenue minus the actual burdened cost.
- ITDActualNonbillableCost: number
Read Only: true
The inception-to-date actual burdened cost that isn't eligible for billing.
- ITDActualNonbillableCostPercentage: number
Read Only: true
The inception-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
- ITDActualNonbillableCostPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
- ITDActualNonbillableCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost that isn't eligible for billing.
- ITDActualNonbillableLaborEffortinHours: number
Read Only: true
The inception-to-date actual labor effort that isn't eligible for billing.
- ITDActualNonbillableLaborEffortinHoursPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual labor effort that isn't eligible for billing.
- ITDActualSpentCostPercentage: number
Read Only: true
The inception-to-date percentage for the actual cost to date divided by the current baseline budget burdened cost.
- ITDActualSpentCostPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual cost-to-date divided by the current baseline budget burdened cost.
- ITDActualSpentLaborEffortPercentage: number
Read Only: true
The inception-to-date percentage for the actual labor effort divided by the current baseline budget labor effort.
- ITDActualSpentLaborEffortPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual labor effort divided by the current baseline budget labor effort.
- ITDBudgetCost: number
Read Only: true
The inception-to-date burdened cost from the current baseline budget.
- ITDBudgetCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date burdened cost from the current baseline budget.
- ITDBudgetLaborCost: number
Read Only: true
The inception-to-date labor cost from the current baseline budget.
- ITDBudgetLaborCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date labor cost from the current baseline budget.
- ITDBudgetLaborEffort: number
Read Only: true
The inception-to-date labor effort from the current baseline budget.
- ITDBudgetLaborEffortPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date labor effort from the current baseline budget.
- ITDBudgetMargin: number
Read Only: true
The inception-to-date current baseline budget revenue minus the current baseline budget burdened cost.
- ITDBudgetMarginPercentage: number
Read Only: true
The inception-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
- ITDBudgetMarginPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to create the trend of the inception-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
- ITDBudgetMarginPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the current baseline budget burdened cost.
- ITDBudgetRevenue: number
Read Only: true
The inception-to-date revenue from the current baseline budget.
- ITDBudgetRevenuePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date revenue from the current baseline budget.
- ITDCommittedCost: number
Read Only: true
The inception-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.
- ITDCostVariance: number
Read Only: true
The inception-to-date current baseline budget cost minus the actual burdened cost.
- ITDCostVariancePercentage: number
Read Only: true
The inception-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
- ITDCostVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
- ITDCostVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget cost minus the actual burdened cost.
- ITDDurationinDays: number
Read Only: true
The inception-to-date days from the start date.
- ITDForecastCost: number
Read Only: true
The inception-to-date burdened cost from the current approved forecast.
- ITDForecastCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date burdened cost from the current approved forecast.
- ITDForecastCostVariance: number
Read Only: true
The inception-to-date current baseline budget cost minus the current approved forecast cost.
- ITDForecastCostVariancePercentage: number
Read Only: true
The inception-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
- ITDForecastCostVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
- ITDForecastCostVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget cost minus the current approved forecast cost.
- ITDForecastLaborCost: number
Read Only: true
The inception-to-date labor cost from the current approved forecast.
- ITDForecastLaborCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date labor cost from the current approved forecast.
- ITDForecastLaborEffort: number
Read Only: true
The inception-to-date labor effort from the current approved forecast.
- ITDForecastLaborEffortPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date labor effort from the current approved forecast.
- ITDForecastLaborEffortVariancePercentage: number
Read Only: true
The inception-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
- ITDForecastLaborEffortVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
- ITDForecastMargin: number
Read Only: true
The inception-to-date current approved forecast revenue minus the current approved forecast burdened cost.
- ITDForecastMarginPercentageVariance: number
Read Only: true
The inception-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
- ITDForecastMarginPercentageVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
- ITDForecastMarginPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current approved forecast revenue minus the current approved forecast burdened cost.
- ITDForecastMarginVariance: number
Read Only: true
The inception-to-date current baseline budget margin minus the current approved forecast margin.
- ITDForecastMarginVariancePercentage: number
Read Only: true
The inception-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
- ITDForecastMarginVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
- ITDForecastMarginVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin minus the current approved forecast margin.
- ITDForecastRevenue: number
Read Only: true
The inception-to-date revenue from the current approved forecast.
- ITDForecastRevenuePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date revenue from the current approved forecast.
- ITDForecastRevenueVariance: number
Read Only: true
The inception-to-date current baseline budget revenue minus the current approved forecast revenue.
- ITDForecastRevenueVariancePercentage: number
Read Only: true
The inception-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
- ITDForecastRevenueVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
- ITDForecastRevenueVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the current approved forecast revenue.
- ITDLaborEffortVariancePercentage: number
Read Only: true
The inception-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
- ITDLaborEffortVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
- ITDMarginPercentageVariance: number
Read Only: true
The inception-to-date current baseline budget margin percentage minus the actual margin percentage.
- ITDMarginPercentageVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin percentage minus the actual margin percentage.
- ITDMarginVariance: number
Read Only: true
The inception-to-date current baseline budget margin minus the actual margin.
- ITDMarginVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin minus the actual margin.
- ITDRevenue: number
Read Only: true
The inception-to-date actual amount recognized as revenue on a contract.
- ITDRevenuePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date actual amount recognized as revenue on a contract.
- ITDRevenueVariance: number
Read Only: true
The inception-to-date current baseline budget revenue minus the actual revenue.
- ITDRevenueVariancePercentage: number
Read Only: true
The inception-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
- ITDRevenueVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
- ITDRevenueVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the actual revenue.
- LastRefreshedDate: string (date-time)
Read Only: true
The date when the performance measures values were last refreshed.
- LastUpdateDate: string (date-time)
Read Only: true
The date when the record was last updated.
- LastUpdatedBy: string
Read Only: true
Maximum Length: 64
The user who last updated the record.
- LineOfBusinessCode: string
Title: Line of Business Code
Read Only: true
Maximum Length: 30
The code that represents the line of business name for the set of products and services that are managed by the program. Examples for line of business names are Product development and All lines of business. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_BUSINESS. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- LineOfBusinessMeaning: string
Read Only: true
Maximum Length: 80
The line of business name for the set of products and services that are managed by the program. Examples for line of business names are Product development and All lines of business. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_BUSINESS. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- links: array Links
Title: Links
The link relations associated with the resource instance.
- MilestonesAtRisk: number
Read Only: true
The number of milestones that are at risk of being delayed.
- MilestonesDueSoon: number
Read Only: true
The number of milestones that are due in the near future.
- MilestonesPastDue: number
Read Only: true
The number of milestones that aren't completed by the finish date.
- MissingTimeCardsFiveWeeksOld: number
Read Only: true
The number of time cards that are missing or incomplete for a project and due five weeks ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsFourWeeksOld: number
Read Only: true
The number of time cards that are missing or incomplete for a project and due four weeks ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsOneWeekOld: number
Read Only: true
The number of time cards that are missing or incomplete for a project and due one week ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsThreeWeeksOld: number
Read Only: true
The number of time cards that are missing or incomplete for a project and due three weeks ago. Only resources that are enabled to track time are considered.
- MissingTimeCardsTwoWeeksOld: number
Read Only: true
The number of time cards that are missing or incomplete for a project and due two weeks ago. Only resources that are enabled to track time are considered.
- ObjectId: integer
Title: Object ID
Read Only: true
The unique identifier of the program or project.
- Objective: string
Read Only: true
Maximum Length: 400
The objective of the program.
- ObjectName: string
Title: Name
Read Only: true
Maximum Length: 240
The name of the program or project.
- ObjectNoteExistsFlag: string
Read Only: true
Maximum Length: 1
Indicates whether notes are associated with the program or project. If true, then notes are associated. If false, then notes aren't associated.
- ObjectNumber: string
Title: Number
Read Only: true
Maximum Length: 25
The unique number of the program or project.
- ObjectParentId: integer (int64)
Title: Object Parent ID
Read Only: true
The unique identifier of the parent object in the program hierarchy structure. The parent of a project is the program. The parent of a program is another program. A program without a parent is the root node in the hierarchy structure.
- ObjectType: string
Title: Object Type
Read Only: true
Maximum Length: 7
Indicates whether the record is for a program or a project. Valid values are PROGRAM and PROJECT.
- ObjectWatchListId: string
Read Only: true
Maximum Length: 240
The unique identifier of the display preference.
- OwnerId: integer (int64)
Read Only: true
The unique identifier of the person who's assigned as the program owner or the primary project manager.
- OwnerName: string
Read Only: true
Maximum Length: 240
The name of the person who's assigned as the program owner or the primary project manager.
- OwningOrganizationId: integer (int64)
Title: Owning Organization ID
Read Only: true
The unique identifier of the owning organization.
- OwningOrganizationName: string
Read Only: true
Maximum Length: 240
The name of the owning organization. Review and update organizations classified as owning organizations using the Setup and Maintenance work area and the Manage Project Organization Classifications task.
- ParentProgramNumber: string
Title: Parent Program Number
Read Only: true
Maximum Length: 25
The unique number of the parent program. A program without a parent is the root node in the hierarchy structure.
- PersonImage: string (byte)
Read Only: true
The avatar image for a person.
- PersonImageId: integer (int64)
Read Only: true
The unique identifier of the avatar image for a person.
- PlannedValue: number
Read Only: true
The planned cost for the financial project plan or project budget.
- PreviousPeriodName: string
Read Only: true
Maximum Length: 15
Display name of the period that precedes the current one, used to compare a performance measure value against its current and previous values.
- PreviousPeriodStartDate: string (date-time)
Read Only: true
Start date of the period that precedes the current one, used to compare a performance measure value against the current and previous value.
- PriorityCode: string
Title: Priority Code
Read Only: true
Maximum Length: 30
The code that represents the priority for the program. Examples for priority are High, Medium, and Low. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_PRIORITY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- PriorityMeaning: string
Read Only: true
Maximum Length: 80
The priority for the program. Examples for priority are High, Medium, and Low. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_PRIORITY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- PriorPeriodName: string
Read Only: true
Maximum Length: 15
Display name of the period prior to the previous period, which is used to compare a performance measure value against the corresponding current and previous values.
- PriorPeriodStartDate: string (date-time)
Read Only: true
Start date of the period prior to the previous period, which is used to compare a performance measure value against the corresponding current and previous values.
- ProgramBudget: number
Title: Budget
Read Only: true
The budgeted amount allotted to the program.
- ProgramBudgetCurrency: string
Read Only: true
Maximum Length: 15
The currency of the budgeted amount allotted to the program.
- ProgramDFF: array ProgramDFF
- ProgramLevel: integer (int32)
Read Only: true
Indicates the level of the program in the hierarchy structure. The level zero is the root node.
- ProjectCompletePercentage: number
Read Only: true
The physical percent complete for the project. If it doesn't exist, then it's calculated using the program enterprise setting for the percent complete method.
- ProjectRelationshipId: integer
Title: Project Association ID
Read Only: true
The unique identifier of the project assignment to a program.
- PTDActualandCommittedCost: number
Read Only: true
The period-to-date actual burdened cost plus the committed cost.
- PTDActualandCommittedCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual burdened cost plus the committed cost.
- PTDActualCapitalizableCost: number
Read Only: true
The period-to-date actual burdened cost that's eligible to capitalize against an asset.
- PTDActualCapitalizableCostPercentage: number
Read Only: true
The period-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
- PTDActualCapitalizableCostPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
- PTDActualCapitalizableCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual burdened cost that's eligible to be capitalized against an asset.
- PTDActualCost: number
Read Only: true
The period-to-date actual cost including raw and burden cost.
- PTDActualCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual cost, including raw and burden cost.
- PTDActualLaborCost: number
Read Only: true
The period-to-date value of the actual raw labor cost and actual burden labor cost.
- PTDActualLaborCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to create the trend of the period-to-date value of the actual raw labor cost and actual burden labor cost.
- PTDActualLaborEffort: number
Read Only: true
The period-to-date actual billable labor effort plus the actual nonbillable labor effort.
- PTDActualLaborEffortPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual billable labor effort plus the actual nonbillable labor effort.
- PTDActualMargin: number
Read Only: true
The period-to-date actual revenue minus the actual burdened cost.
- PTDActualMarginPercentage: number
Read Only: true
The period-to-date percentage for the actual margin divided by the actual revenue.
- PTDActualMarginPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the actual margin divided by the actual revenue.
- PTDActualMarginPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual revenue minus the actual burdened cost.
- PTDActualNonbillableCost: number
Read Only: true
The period-to-date actual burdened cost that isn't eligible for billing.
- PTDActualNonbillableCostPercentage: number
Read Only: true
The period-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
- PTDActualNonbillableCostPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the actual nonbillable cost divided by the actual burdened cost.
- PTDActualNonbillableCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual burdened cost that isn't eligible for billing.
- PTDActualNonbillableLaborEffortinHours: number
Read Only: true
The period-to-date actual labor effort that isn't eligible for billing.
- PTDActualNonbillableLaborEffortinHoursPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual labor effort that isn't eligible for billing.
- PTDBudgetCost: number
Read Only: true
The period-to-date burdened cost from the current baseline budget.
- PTDBudgetCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date burdened cost from the current baseline budget.
- PTDBudgetLaborCost: number
Read Only: true
The period-to-date labor cost from the current baseline budget.
- PTDBudgetLaborCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date labor cost from the current baseline budget.
- PTDBudgetLaborEffort: number
Read Only: true
The period-to-date labor effort from the current baseline budget.
- PTDBudgetLaborEffortPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date labor effort from the current baseline budget.
- PTDBudgetMargin: number
Read Only: true
The period-to-date current baseline budget revenue minus the current baseline budget burdened cost.
- PTDBudgetMarginPercentage: number
Read Only: true
The period-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
- PTDBudgetMarginPercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to create the trend of the period-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
- PTDBudgetMarginPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the current baseline budget burdened cost.
- PTDBudgetRevenue: number
Read Only: true
The period-to-date revenue from the current baseline budget.
- PTDBudgetRevenuePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date revenue from the current baseline budget.
- PTDCommittedCost: number
Read Only: true
The period-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.
- PTDCostVariance: number
Read Only: true
The period-to-date current baseline budget cost minus the actual burdened cost .
- PTDCostVariancePercentage: number
Read Only: true
The period-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
- PTDCostVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
- PTDCostVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget cost minus the actual burdened cost.
- PTDForecastCost: number
Read Only: true
The period-to-date burdened cost from the current approved forecast.
- PTDForecastCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date burdened cost from the current approved forecast.
- PTDForecastCostVariance: number
Read Only: true
The period-to-date current baseline budget cost minus the current approved forecast cost.
- PTDForecastCostVariancePercentage: number
Read Only: true
The period-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
- PTDForecastCostVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
- PTDForecastCostVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget cost minus the current approved forecast cost.
- PTDForecastLaborCost: number
Read Only: true
The period-to-date labor cost from the current approved forecast.
- PTDForecastLaborCostPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date labor cost from the current approved forecast.
- PTDForecastLaborEffort: number
Read Only: true
The period-to-date labor effort from the current approved forecast.
- PTDForecastLaborEffortPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date labor effort from the current approved forecast.
- PTDForecastLaborEffortVariancePercentage: number
Read Only: true
The period-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
- PTDForecastLaborEffortVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
- PTDForecastMargin: number
Read Only: true
The period-to-date current approved forecast revenue minus the current approved forecast burdened cost.
- PTDForecastMarginPercentageVariance: number
Read Only: true
The period-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
- PTDForecastMarginPercentageVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
- PTDForecastMarginPrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current approved forecast revenue minus the current approved forecast burdened cost.
- PTDForecastMarginVariance: number
Read Only: true
The period-to-date current baseline budget margin minus the current approved forecast margin.
- PTDForecastMarginVariancePercentage: number
Read Only: true
The period-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
- PTDForecastMarginVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
- PTDForecastMarginVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin minus the current approved forecast margin.
- PTDForecastRevenue: number
Read Only: true
The period-to-date revenue from the current approved forecast.
- PTDForecastRevenuePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date revenue from the current approved forecast.
- PTDForecastRevenueVariance: number
Read Only: true
The period-to-date current baseline budget revenue minus the current approved forecast revenue.
- PTDForecastRevenueVariancePercentage: number
Read Only: true
The period-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
- PTDForecastRevenueVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
- PTDForecastRevenueVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the current approved forecast revenue.
- PTDLaborEffortVariancePercentage: number
Read Only: true
The period-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
- PTDLaborEffortVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
- PTDMarginPercentageVariance: number
Read Only: true
The period-to-date current baseline budget margin percentage minus the actual margin percentage.
- PTDMarginPercentageVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin percentage minus the actual margin percentage.
- PTDMarginVariance: number
Read Only: true
The period-to-date current baseline budget margin minus the actual margin.
- PTDMarginVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin minus the actual margin.
- PTDRevenue: number
Read Only: true
The period-to-date actual amount recognized as revenue on a contract.
- PTDRevenuePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date actual amount recognized as revenue on a contract.
- PTDRevenueVariance: number
Read Only: true
The period-to-date current baseline budget revenue minus the actual revenue.
- PTDRevenueVariancePercentage: number
Read Only: true
The period-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
- PTDRevenueVariancePercentagePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
- PTDRevenueVariancePrevValues: string
Read Only: true
Maximum Length: 255
Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the actual revenue.
- PublicFlag: string
Title: Public access
Read Only: true
Maximum Length: 1
Indicates whether the program hierarchy can be viewed by all. If true, then programs in the hierarchy can be viewed by all. If false, then only the persons assigned as stakeholders directly or inherited from a parent or grandparent program can view their programs. The value is defined for the root node of the hierarchy. The default value is false.
- RegionCode: string
Title: Region Code
Read Only: true
Maximum Length: 30
The code that represents the geographic or divisional region that's covered by the program. Examples for region names are North America and All regions. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_REGION. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- RegionMeaning: string
Read Only: true
Maximum Length: 80
The geographic or divisional region that's covered by the program. Examples for region names are North America and All regions. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_REGION. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- SchedulePerformanceIndex: number
- StartDate: string (date)
Title: Start Date
Read Only: true
The date on which the program or project starts.
- StatusName: string
Read Only: true
Maximum Length: 80
The system status for the object. Values are Draft, Submitted, Active, Pending close, and Close. The list of values is defined in the lookup type PJF_PROJECT_SYSTEM_STATUS. Review status values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- StrategyCode: string
Title: Strategy Code
Read Only: true
Maximum Length: 30
The code that represents the strategic plan of actions and policies that are targeted by the program. An example for strategy is Innovation. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_STRATEGY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- StrategyMeaning: string
Read Only: true
Maximum Length: 80
The strategic plan of actions and policies that are targeted by the program. An example strategy is Innovation. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_STRATEGY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.
- SystemStatusCode: string
Read Only: true
Maximum Length: 30
The code that represents the system status. Values are DRAFT, SUBMITTED, ACTIVE, PENDING_CLOSE, and CLOSED. Review status values using the Setup and Maintenance work area and the Manage Project Statuses task.
- TaskExceptionsCount: number
Read Only: true
The number of task exceptions for a project. Task exceptions occur when the team member changes the task dates or effort outside of the threshold values that were set during implementation or when the tasks are overdue.
- TreeStructureId: integer (int64)
Title: Tree Structure ID
Read Only: true
The unique identifier of the program hierarchy structure.
- UnpaidInvoiceAmount: number
Read Only: true
Unpaid invoice amount.
- UserAccess: string
Read Only: true
Maximum Length: 30
The code that represents the access type for the assignee. The assignee with owner access can edit and delete the program. An assignee with contributor access can edit the program. An assignee with viewer access can view the program and receive stakeholder communications. The person who creates the program is the default owner. Only one direct assignment can have owner access at a given time. Valid values are OWNER, EDIT, and VIEW. The default value is VIEW.
- UserAccessMeaning: string
Read Only: true
Maximum Length: 80
The access granted to the user for the program.
- WeekFiveToEightOverAllocated: number
Read Only: true
The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next five to eight weeks of the project.
- WeekFiveToEightUnderAllocated: number
Read Only: true
The number of labor resources who are assigned to tasks for less than their allocated hours during the next five to eight weeks of the project.
- WeekNineToTwelveOverAllocated: number
Read Only: true
The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next nine to twelve weeks of the project.
- WeekNineToTwelveUnderAllocated: number
Read Only: true
The number of labor resources who are assigned to tasks for less than their allocated hours during the next nine to twelve weeks of the project.
- WeekOneToFourOverAllocated: number
Read Only: true
The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours for the four weeks of the project that start with the current week.
- WeekOneToFourUnderAllocated: number
Read Only: true
The number of labor resources who are assigned to tasks for less than their allocated hours for the four weeks of the project that start with the current week.
- WorkPlanCompletePercentage: number
Read Only: true
The percentage complete for the actual work plan effort divided by the scheduled work plan effort.
- WorkPlanScheduledEffortinHours: number
Read Only: true
The planned effort for a work plan.
- YTDActualandCommittedCost: number
Read Only: true
The year-to-date actual burdened cost plus the committed cost.
- YTDActualCapitalizableCost: number
Read Only: true
The year-to-date actual burdened cost that's eligible to capitalize against an asset.
- YTDActualCapitalizableCostPercentage: number
Read Only: true
The year-to-date percentage for the actual capitalizable cost divided by the total burdened cost.
- YTDActualCost: number
Read Only: true
The year-to-date actual cost including raw and burden cost.
- YTDActualLaborCost: number
Read Only: true
The year-to-date value of the actual raw labor cost and actual burden labor cost.
- YTDActualLaborEffort: number
Read Only: true
The year-to-date actual billable labor effort plus the actual nonbillable labor effort.
- YTDActualMargin: number
Read Only: true
The year-to-date actual revenue minus the actual burdened cost.
- YTDActualMarginPercentage: number
Read Only: true
The year-to-date percentage for the actual margin divided by the actual revenue.
- YTDActualNonbillableCost: number
Read Only: true
The year-to-date actual burdened cost that isn't eligible for billing.
- YTDActualNonbillableCostPercentage: number
Read Only: true
The year-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.
- YTDActualNonbillableLaborEffortinHours: number
Read Only: true
The year-to-date actual labor effort that isn't eligible for billing.
- YTDBudgetCost: number
Read Only: true
The year-to-date burdened cost from the current baseline budget.
- YTDBudgetLaborCost: number
Read Only: true
The year-to-date labor cost from the current baseline budget.
- YTDBudgetLaborEffort: number
Read Only: true
The year-to-date labor effort from the current baseline budget.
- YTDBudgetMargin: number
Read Only: true
The year-to-date current baseline budget revenue minus the current baseline budget burdened cost.
- YTDBudgetMarginPercentage: number
Read Only: true
The year-to-date percentage of the current baseline budget margin divided by the current baseline revenue.
- YTDBudgetRevenue: number
Read Only: true
The year-to-date revenue from the current baseline budget.
- YTDCommittedCost: number
Read Only: true
The year-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.
- YTDCostVariance: number
Read Only: true
The year-to-date current baseline budget cost minus the actual burdened cost.
- YTDCostVariancePercentage: number
Read Only: true
The year-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.
- YTDForecastCost: number
Read Only: true
The year-to-date burdened cost from the current approved forecast.
- YTDForecastCostVariance: number
Read Only: true
The year-to-date current baseline budget cost minus the current approved forecast cost.
- YTDForecastCostVariancePercentage: number
Read Only: true
The year-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.
- YTDForecastLaborCost: number
Read Only: true
The year-to-date labor cost from the current approved forecast.
- YTDForecastLaborEffort: number
Read Only: true
The year-to-date labor effort from the current approved forecast.
- YTDForecastLaborEffortVariancePercentage: number
Read Only: true
The year-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.
- YTDForecastMargin: number
Read Only: true
The year-to-date current approved forecast revenue minus the current approved forecast burdened cost.
- YTDForecastMarginPercentageVariance: number
Read Only: true
The year-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.
- YTDForecastMarginVariance: number
Read Only: true
The year-to-date current baseline budget margin minus the current approved forecast margin.
- YTDForecastMarginVariancePercentage: number
Read Only: true
The year-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.
- YTDForecastRevenue: number
Read Only: true
The year-to-date revenue from the current approved forecast.
- YTDForecastRevenueVariance: number
Read Only: true
The year-to-date current baseline budget revenue minus the current approved forecast revenue.
- YTDForecastRevenueVariancePercentage: number
Read Only: true
The year-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.
- YTDLaborEffortVariancePercentage: number
Read Only: true
The year-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.
- YTDMarginPercentageVariance: number
Read Only: true
The year-to-date current baseline budget margin percentage minus the actual margin percentage.
- YTDMarginVariance: number
Read Only: true
The year-to-date current baseline budget margin minus the actual margin.
- YTDRevenue: number
Read Only: true
The year-to-date actual amount recognized as revenue on a contract.
- YTDRevenueVariance: number
Read Only: true
The year-to-date current baseline budget revenue minus the actual revenue.
- YTDRevenueVariancePercentage: number
Read Only: true
The year-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.
{ "type":"object", "properties":{ "ITDActualCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual cost, including raw and burden cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACOriginalBudgetCost":{ "type":"number", "description":"The total at completion for the burdened cost from the original baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualSpentCostPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual cost-to-date divided by the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualLaborEffort":{ "type":"number", "description":"The inception-to-date actual billable labor effort plus the actual nonbillable labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "EarnedValue":{ "type":"number", "description":"The planned value multiplied by the project completion percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDCostVariancePercentage":{ "type":"number", "description":"The period-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "CurrencyCode":{ "type":"string", "description":"The currency code for the monetary performance measures. A list of accepted values is available from the Program User Preferences API.", "nullable":true, "readOnly":true, "x-queryable":true }, "MilestonesDueSoon":{ "type":"number", "description":"The number of milestones that are due in the near future.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualLaborCost":{ "type":"number", "description":"The year-to-date value of the actual raw labor cost and actual burden labor cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDCostVariance":{ "type":"number", "description":"The period-to-date current baseline budget cost minus the actual burdened cost .", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetLaborEffortPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date labor effort from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDRevenueVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualLaborCost":{ "type":"number", "description":"The period-to-date value of the actual raw labor cost and actual burden labor cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetCost":{ "type":"number", "description":"The inception-to-date burdened cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ProgramBudget":{ "title":"Budget", "type":"number", "description":"The budgeted amount allotted to the program.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualMargin":{ "type":"number", "description":"The period-to-date actual revenue minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "LastUpdatedBy":{ "maxLength":64, "type":"string", "description":"The user who last updated the record.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualNonbillableCostPercentage":{ "type":"number", "description":"The period-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ObjectNoteExistsFlag":{ "maxLength":1, "type":"string", "description":"Indicates whether notes are associated with the program or project. If true, then notes are associated. If false, then notes aren't associated.", "nullable":true, "readOnly":true, "x-queryable":true }, "CreatedBy":{ "maxLength":64, "type":"string", "description":"The user who created the record.", "nullable":true, "readOnly":true, "x-queryable":true }, "StatusName":{ "maxLength":80, "type":"string", "description":"The system status for the object. Values are Draft, Submitted, Active, Pending close, and Close. The list of values is defined in the lookup type PJF_PROJECT_SYSTEM_STATUS. Review status values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "WeekFiveToEightOverAllocated":{ "type":"number", "description":"The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next five to eight weeks of the project.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualLaborEffort":{ "type":"number", "description":"The year-to-date actual billable labor effort plus the actual nonbillable labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "PersonImage":{ "type":"string", "description":"The avatar image for a person.", "format":"byte", "nullable":true, "readOnly":true, "x-queryable":false }, "ITDRevenuePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual amount recognized as revenue on a contract.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastLaborCost":{ "type":"number", "description":"The period-to-date labor cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "PreviousPeriodName":{ "maxLength":15, "type":"string", "description":"Display name of the period that precedes the current one, used to compare a performance measure value against its current and previous values.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetCost":{ "type":"number", "description":"The period-to-date burdened cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastRevenueVariance":{ "type":"number", "description":"The year-to-date current baseline budget revenue minus the current approved forecast revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date burdened cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "LastRefreshedDate":{ "type":"string", "description":"The date when the performance measures values were last refreshed.", "format":"date-time", "nullable":true, "readOnly":true, "x-queryable":true }, "EACCurrentandPreviousForecastMarginVariance":{ "type":"number", "description":"The estimate-at-completion for the current approved forecast margin minus the previously approved forecast margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "AsOfPeriodName":{ "type":"string", "description":"The name of the program calendar period. The period with this name is the as-of-period for the measure time dimension.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastCostVariance":{ "type":"number", "description":"The inception-to-date current baseline budget cost minus the current approved forecast cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDBudgetRevenue":{ "type":"number", "description":"The year-to-date revenue from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastRevenue":{ "type":"number", "description":"The year-to-date revenue from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "AssignmentsEndingSoon":{ "type":"number", "description":"The number of resources with assignments to the project that are scheduled to end within the next two weeks.", "nullable":true, "readOnly":true, "x-queryable":true }, "WeekOneToFourOverAllocated":{ "type":"number", "description":"The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours for the four weeks of the project that start with the current week.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMarginVariance":{ "type":"number", "description":"The inception-to-date current baseline budget margin minus the current approved forecast margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDCostVariancePercentage":{ "type":"number", "description":"The inception-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastMarginPercentageVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualNonbillableCostPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the actual nonbillable cost divided by the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualCapitalizableCostPercentage":{ "type":"number", "description":"The year-to-date percentage for the actual capitalizable cost divided by the total burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastRevenueVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "WorkPlanScheduledEffortinHours":{ "type":"number", "description":"The planned effort for a work plan.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACForecastMargin":{ "type":"number", "description":"The total-at-completion value for the current approved forecast revenue minus the current approved forecast cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDBudgetCost":{ "type":"number", "description":"The year-to-date burdened cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualMarginPercentage":{ "type":"number", "description":"The inception-to-date percentage for the actual margin divided by the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetLaborCost":{ "type":"number", "description":"The inception-to-date labor cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualMargin":{ "type":"number", "description":"The year-to-date actual revenue minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualNonbillableCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "MissingTimeCardsFiveWeeksOld":{ "type":"number", "description":"The number of time cards that are missing or incomplete for a project and due five weeks ago. Only resources that are enabled to track time are considered.", "nullable":true, "readOnly":true, "x-queryable":true }, "IncludePerformanceMeasuresFlag":{ "maxLength":1, "type":"string", "description":"Indicates whether the performance measure values are returned. If false, then only the program definition values are returned such as the project and program name, program strategy, and program region. The default value is false. If true, and when used as one of the variables for a finder, the performance measure values are returned.", "nullable":true, "readOnly":true, "x-queryable":true }, "UserAccessMeaning":{ "maxLength":80, "type":"string", "description":"The access granted to the user for the program.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACCurrentandOriginalBudgetCostVariancePercentage":{ "type":"number", "description":"The percentage at completion for the current baseline budget cost minus the original baseline budget cost, divided by the current baseline budget cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDCostVariance":{ "type":"number", "description":"The year-to-date current baseline budget cost minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDRevenueVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "StrategyCode":{ "title":"Strategy Code", "maxLength":30, "type":"string", "description":"The code that represents the strategic plan of actions and policies that are targeted by the program. An example for strategy is Innovation. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_STRATEGY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastCostVariancePercentage":{ "type":"number", "description":"The period-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMarginVariancePercentage":{ "type":"number", "description":"The inception-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastLaborEffort":{ "type":"number", "description":"The year-to-date labor effort from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "FinishDate":{ "title":"Finish Date", "type":"string", "description":"The date when the program or project is completed.", "format":"date", "nullable":true, "readOnly":true, "x-queryable":true }, "PlannedValue":{ "type":"number", "description":"The planned cost for the financial project plan or project budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACForecastLaborCost":{ "type":"number", "description":"The estimate-at-completion for the labor cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDLaborEffortVariancePercentage":{ "type":"number", "description":"The inception-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDRevenueVariance":{ "type":"number", "description":"The inception-to-date current baseline budget revenue minus the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualandCommittedCost":{ "type":"number", "description":"The inception-to-date actual burdened cost plus the committed cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDMarginPercentageVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin percentage minus the actual margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "LastUpdateDate":{ "type":"string", "description":"The date when the record was last updated.", "format":"date-time", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetMarginPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to create the trend of the period-to-date percentage of the current baseline budget margin divided by the current baseline revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "RegionMeaning":{ "maxLength":80, "type":"string", "description":"The geographic or divisional region that's covered by the program. Examples for region names are North America and All regions. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_REGION. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastLaborEffortPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date labor effort from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDRevenueVariancePercentage":{ "type":"number", "description":"The year-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "AsOfPeriodStartDate":{ "type":"string", "description":"The start date for the program calendar period. The period with this start date is the as-of-period for the measure time dimension.", "format":"date-time", "nullable":true, "readOnly":true, "x-queryable":true }, "ParentProgramNumber":{ "title":"Parent Program Number", "maxLength":25, "type":"string", "description":"The unique number of the parent program. A program without a parent is the root node in the hierarchy structure.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACOriginalBudgetandActualCostVariance":{ "type":"number", "description":"The total at completion for the original baseline budget cost minus the actual cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualLaborEffortPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual billable labor effort plus the actual nonbillable labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "WeekOneToFourUnderAllocated":{ "type":"number", "description":"The number of labor resources who are assigned to tasks for less than their allocated hours for the four weeks of the project that start with the current week.", "nullable":true, "readOnly":true, "x-queryable":true }, "LineOfBusinessMeaning":{ "maxLength":80, "type":"string", "description":"The line of business name for the set of products and services that are managed by the program. Examples for line of business names are Product development and All lines of business. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_BUSINESS. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastCostVariancePercentage":{ "type":"number", "description":"The year-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastLaborEffortVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ImageId":{ "type":"integer", "description":"The unique identifier of the image for a program.", "format":"int64", "nullable":true, "readOnly":true, "x-hints":{ "precision":18 }, "x-queryable":true }, "PTDForecastMarginVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDCommittedCost":{ "type":"number", "description":"The year-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastCostVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PriorPeriodName":{ "maxLength":15, "type":"string", "description":"Display name of the period prior to the previous period, which is used to compare a performance measure value against the corresponding current and previous values.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDBudgetMarginPercentage":{ "type":"number", "description":"The year-to-date percentage of the current baseline budget margin divided by the current baseline revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDRevenue":{ "type":"number", "description":"The inception-to-date actual amount recognized as revenue on a contract.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetRevenuePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date revenue from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "WeekFiveToEightUnderAllocated":{ "type":"number", "description":"The number of labor resources who are assigned to tasks for less than their allocated hours during the next five to eight weeks of the project.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastLaborCost":{ "type":"number", "description":"The inception-to-date labor cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetLaborEffort":{ "type":"number", "description":"The period-to-date labor effort from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACCurrentandOriginalBudgetRevenueVariance":{ "type":"number", "description":"The estimate-at-completion for the current baseline budget revenue minus the original baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetMargin":{ "type":"number", "description":"The inception-to-date current baseline budget revenue minus the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMarginVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ProjectRelationshipId":{ "title":"Project Association ID", "type":"integer", "description":"The unique identifier of the project assignment to a program.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualCost":{ "type":"number", "description":"The period-to-date actual cost including raw and burden cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastRevenueVariancePercentage":{ "type":"number", "description":"The inception-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastRevenuePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date revenue from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualNonbillableCost":{ "type":"number", "description":"The period-to-date actual burdened cost that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDMarginPercentageVariance":{ "type":"number", "description":"The year-to-date current baseline budget margin percentage minus the actual margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualMarginPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual margin divided by the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastRevenueVariancePercentage":{ "type":"number", "description":"The year-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDCostVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastRevenueVariance":{ "type":"number", "description":"The inception-to-date current baseline budget revenue minus the current approved forecast revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastLaborCost":{ "type":"number", "description":"The year-to-date labor cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetLaborCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date labor cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastRevenue":{ "type":"number", "description":"The period-to-date revenue from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACForecastLaborEffort":{ "type":"number", "description":"The estimate-at-completion for the labor effort from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastLaborEffort":{ "type":"number", "description":"The period-to-date labor effort from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastMarginVariance":{ "type":"number", "description":"The year-to-date current baseline budget margin minus the current approved forecast margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualLaborCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to create the trend of the period-to-date value of the actual raw labor cost and actual burden labor cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDRevenue":{ "type":"number", "description":"The period-to-date actual amount recognized as revenue on a contract.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date burdened cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "CostPerformanceIndex":{ "type":"number", "description":"The earned value divided by the actual cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualNonbillableCost":{ "type":"number", "description":"The year-to-date actual burdened cost that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualandCommittedCost":{ "type":"number", "description":"The period-to-date actual burdened cost plus the committed cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastMarginPercentageVariance":{ "type":"number", "description":"The year-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "PersonImageId":{ "type":"integer", "description":"The unique identifier of the avatar image for a person.", "format":"int64", "nullable":true, "readOnly":true, "x-hints":{ "precision":18 }, "x-queryable":true }, "PTDCostVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualNonbillableCostPercentage":{ "type":"number", "description":"The year-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualInvoiceAmount":{ "type":"number", "description":"The inception-to-date actual amount invoiced to customer excluding tax.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualMarginPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the actual margin divided by the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "PriorPeriodStartDate":{ "type":"string", "description":"Start date of the period prior to the previous period, which is used to compare a performance measure value against the corresponding current and previous values.", "format":"date-time", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualNonbillableCostPercentage":{ "type":"number", "description":"The inception-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualSpentLaborEffortPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual labor effort divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "StrategyMeaning":{ "maxLength":80, "type":"string", "description":"The strategic plan of actions and policies that are targeted by the program. An example strategy is Innovation. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_STRATEGY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastMarginVariancePercentage":{ "type":"number", "description":"The year-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "AssessmentMeaning":{ "maxLength":80, "type":"string", "description":"The program owner's ongoing assessment for the likelihood that the program will meet the program objectives. Examples for assessments are On track and At risk. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_ASSESSMENT. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastCostVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget cost minus the current approved forecast cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastCost":{ "type":"number", "description":"The period-to-date burdened cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDLaborEffortVariancePercentage":{ "type":"number", "description":"The period-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDMarginVariance":{ "type":"number", "description":"The inception-to-date current baseline budget margin minus the actual margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ObjectName":{ "title":"Name", "maxLength":240, "type":"string", "description":"The name of the program or project.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualNonbillableCost":{ "type":"number", "description":"The inception-to-date actual burdened cost that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastCostVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualMarginPercentage":{ "type":"number", "description":"The period-to-date percentage for the actual margin divided by the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "LineOfBusinessCode":{ "title":"Line of Business Code", "maxLength":30, "type":"string", "description":"The code that represents the line of business name for the set of products and services that are managed by the program. Examples for line of business names are Product development and All lines of business. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_BUSINESS. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualCapitalizableCost":{ "type":"number", "description":"The period-to-date actual burdened cost that's eligible to capitalize against an asset.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualLaborEffortPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual billable labor effort plus the actual nonbillable labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastLaborEffortPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date labor effort from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "AmountToBill":{ "type":"number", "description":"Amount to bill.", "nullable":true, "readOnly":true, "x-queryable":true }, "MissingTimeCardsOneWeekOld":{ "type":"number", "description":"The number of time cards that are missing or incomplete for a project and due one week ago. Only resources that are enabled to track time are considered.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDRevenueVariancePercentage":{ "type":"number", "description":"The period-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDBudgetMargin":{ "type":"number", "description":"The year-to-date current baseline budget revenue minus the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDCostVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget cost minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACOriginalBudgetLaborEffortinHours":{ "type":"number", "description":"The total at completion for the labor effort from the original baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "CreationDate":{ "type":"string", "description":"The date when the record was created.", "format":"date-time", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDRevenueVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastCostVariancePercentage":{ "type":"number", "description":"The inception-to-date percentage for the current baseline budget cost minus the current approved forecast cost, divided by the current baseline budget cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "RegionCode":{ "title":"Region Code", "maxLength":30, "type":"string", "description":"The code that represents the geographic or divisional region that's covered by the program. Examples for region names are North America and All regions. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_REGION. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDLaborEffortVariancePercentage":{ "type":"number", "description":"The year-to-date percentage for the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualMarginPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual revenue minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDLaborEffortVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage of the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetMarginPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "Image":{ "type":"string", "description":"The base 64 encoded image.", "format":"byte", "nullable":true, "readOnly":true, "x-queryable":false }, "YTDBudgetLaborEffort":{ "type":"number", "description":"The year-to-date labor effort from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualandCommittedCost":{ "type":"number", "description":"The year-to-date actual burdened cost plus the committed cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetRevenue":{ "type":"number", "description":"The period-to-date revenue from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDLaborEffortVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget labor effort minus the actual labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ProjectCompletePercentage":{ "type":"number", "description":"The physical percent complete for the project. If it doesn't exist, then it's calculated using the program enterprise setting for the percent complete method.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACBudgetLaborEffort":{ "type":"number", "description":"The total at completion for the labor effort from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACCurrentandPreviousForecastRevenueVariance":{ "type":"number", "description":"The estimate-at-completion for the current approved forecast revenue minus the previously approved forecast revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "EstimatetoCompleteLaborEffortinHours":{ "type":"number", "description":"The estimate-to-complete for the current approved forecast labor effort minus the actual labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDMarginVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin minus the actual margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDMarginVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin minus the actual margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ProgramLevel":{ "type":"integer", "description":"Indicates the level of the program in the hierarchy structure. The level zero is the root node.", "format":"int32", "nullable":false, "readOnly":true, "x-hints":{ "precision":2 }, "x-queryable":true }, "AsOfPeriodEndDate":{ "type":"string", "description":"The end date for the program calendar period. The period with this end date is the as-of-period for the measure time dimension.", "format":"date-time", "nullable":true, "readOnly":true, "x-queryable":true }, "MissingTimeCardsTwoWeeksOld":{ "type":"number", "description":"The number of time cards that are missing or incomplete for a project and due two weeks ago. Only resources that are enabled to track time are considered.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetMarginPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to create the trend of the inception-to-date percentage of the current baseline budget margin divided by the current baseline revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACForecastLaborEffortVariancePercentage":{ "type":"number", "description":"The estimated percentage at completion for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date burdened cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "MilestonesAtRisk":{ "type":"number", "description":"The number of milestones that are at risk of being delayed.", "nullable":true, "readOnly":true, "x-queryable":true }, "UserAccess":{ "maxLength":30, "type":"string", "description":"The code that represents the access type for the assignee. The assignee with owner access can edit and delete the program. An assignee with contributor access can edit the program. An assignee with viewer access can view the program and receive stakeholder communications. The person who creates the program is the default owner. Only one direct assignment can have owner access at a given time. Valid values are OWNER, EDIT, and VIEW. The default value is VIEW.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualLaborCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to create the trend of the inception-to-date value of actual raw labor cost and actual burden labor cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastCost":{ "type":"number", "description":"The inception-to-date burdened cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualLaborEffort":{ "type":"number", "description":"The period-to-date actual billable labor effort plus the actual nonbillable labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACBudgetLaborCost":{ "type":"number", "description":"The total at completion for the labor cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualLaborCost":{ "type":"number", "description":"The inception-to-date value of the actual raw labor cost and actual burden labor cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "AssessmentCode":{ "title":"Assessment Code", "maxLength":30, "type":"string", "description":"The code that represents the program owner's ongoing assessment for the likelihood that the program will meet the program objectives. Examples for assessments are On track and At risk. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_ASSESSMENT. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetRevenue":{ "type":"number", "description":"The inception-to-date revenue from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetLaborEffort":{ "type":"number", "description":"The inception-to-date labor effort from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastMarginPercentageVariance":{ "type":"number", "description":"The period-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACDurationinDays":{ "type":"number", "description":"The total at completion for the days from the start date.", "nullable":true, "readOnly":true, "x-queryable":true }, "PriorityMeaning":{ "maxLength":80, "type":"string", "description":"The priority for the program. Examples for priority are High, Medium, and Low. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_PRIORITY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMarginPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current approved forecast revenue minus the current approved forecast burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastMarginPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current approved forecast revenue minus the current approved forecast burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastLaborEffort":{ "type":"number", "description":"The inception-to-date labor effort from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMargin":{ "type":"number", "description":"The inception-to-date current approved forecast revenue minus the current approved forecast burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "Description":{ "title":"Description", "maxLength":2000, "type":"string", "description":"The description of the program or project.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualMarginPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual revenue minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualMarginPercentage":{ "type":"number", "description":"The year-to-date percentage for the actual margin divided by the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "PriorityCode":{ "title":"Priority Code", "maxLength":30, "type":"string", "description":"The code that represents the priority for the program. Examples for priority are High, Medium, and Low. A list of accepted values is defined in the lookup type ORA_PROJECT_PROGRAM_PRIORITY. Review and update the list of values using the Setup and Maintenance work area and the Manage Standard Lookups task.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDRevenueVariance":{ "type":"number", "description":"The period-to-date current baseline budget revenue minus the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastMarginVariancePercentage":{ "type":"number", "description":"The period-to-date percentage for the current baseline budget margin minus the current approved forecast margin, divided by the current baseline budget margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualNonbillableCostPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual nonbillable cost divided by the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDRevenueVariance":{ "type":"number", "description":"The year-to-date current baseline budget revenue minus the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "WeekNineToTwelveUnderAllocated":{ "type":"number", "description":"The number of labor resources who are assigned to tasks for less than their allocated hours during the next nine to twelve weeks of the project.", "nullable":true, "readOnly":true, "x-queryable":true }, "ObjectType":{ "title":"Object Type", "maxLength":7, "type":"string", "description":"Indicates whether the record is for a program or a project. Valid values are PROGRAM and PROJECT.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDCommittedCost":{ "type":"number", "description":"The period-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastCostVariance":{ "type":"number", "description":"The year-to-date current baseline budget cost minus the current approved forecast cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualandCommittedCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual burdened cost plus the committed cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "OwnerId":{ "type":"integer", "description":"The unique identifier of the person who's assigned as the program owner or the primary project manager.", "format":"int64", "nullable":true, "readOnly":true, "x-hints":{ "precision":18 }, "x-queryable":true }, "ObjectParentId":{ "title":"Object Parent ID", "type":"integer", "description":"The unique identifier of the parent object in the program hierarchy structure. The parent of a project is the program. The parent of a program is another program. A program without a parent is the root node in the hierarchy structure.", "format":"int64", "nullable":true, "readOnly":true, "x-hints":{ "precision":18 }, "x-queryable":true }, "ITDActualMargin":{ "type":"number", "description":"The inception-to-date actual revenue minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDCostVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget cost minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDCostVariance":{ "type":"number", "description":"The inception-to-date current baseline budget cost minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDMarginPercentageVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin percentage minus the actual margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "ObjectNumber":{ "title":"Number", "maxLength":25, "type":"string", "description":"The unique number of the program or project.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACCurrentandOriginalBudgetMarginVariance":{ "type":"number", "description":"The estimate-at-completion for the current baseline budget margin minus the original baseline budget margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "UnpaidInvoiceAmount":{ "type":"number", "description":"Unpaid invoice amount.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualCost":{ "type":"number", "description":"The year-to-date actual cost including raw and burden cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualCapitalizableCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual burdened cost that's eligible to be capitalized against an asset.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastCostVariance":{ "type":"number", "description":"The period-to-date current baseline budget cost minus the current approved forecast cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualNonbillableLaborEffortinHours":{ "type":"number", "description":"The year-to-date actual labor effort that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDBudgetLaborCost":{ "type":"number", "description":"The year-to-date labor cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACOriginalBudgetandEACForecastCostVariance":{ "type":"number", "description":"The total at completion for the original baseline budget cost minus the estimate-at-completion for the current approved forecast cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDMarginPercentageVariance":{ "type":"number", "description":"The inception-to-date current baseline budget margin percentage minus the actual margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "TaskExceptionsCount":{ "type":"number", "description":"The number of task exceptions for a project. Task exceptions occur when the team member changes the task dates or effort outside of the threshold values that were set during implementation or when the tasks are overdue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ImageName":{ "maxLength":240, "type":"string", "description":"The name of the image.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACForecastRevenue":{ "type":"number", "description":"The estimate-at-completion value of the revenue from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMarginPercentageVariance":{ "type":"number", "description":"The inception-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMarginPercentageVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin percentage minus the current approved forecast margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual cost, including raw and burden cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACOriginalBudgetandEACForecastRevenueVariance":{ "type":"number", "description":"The total at completion for the original baseline budget revenue minus the estimate-at-completion for the current approved forecast revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "EarnedValueCostVariance":{ "type":"number", "description":"The earned value minus the actual cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDMarginVariance":{ "type":"number", "description":"The period-to-date current baseline budget margin minus the actual margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetMarginPercentage":{ "type":"number", "description":"The inception-to-date percentage of the current baseline budget margin divided by the current baseline revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualCost":{ "type":"number", "description":"The inception-to-date actual cost including raw and burden cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ObjectWatchListId":{ "maxLength":240, "type":"string", "description":"The unique identifier of the display preference.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastMarginVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget margin minus the current approved forecast margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACBudgetRevenue":{ "type":"number", "description":"The estimate-at-completion value for the revenue from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualCapitalizableCostPercentage":{ "type":"number", "description":"The period-to-date percentage for the actual capitalizable cost divided by the total burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetRevenuePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date revenue from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "StartDate":{ "title":"Start Date", "type":"string", "description":"The date on which the program or project starts.", "format":"date", "nullable":true, "readOnly":true, "x-queryable":true }, "WorkPlanCompletePercentage":{ "type":"number", "description":"The percentage complete for the actual work plan effort divided by the scheduled work plan effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualandCommittedCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost plus the committed cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualSpentCostPercentage":{ "type":"number", "description":"The inception-to-date percentage for the actual cost to date divided by the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastRevenue":{ "type":"number", "description":"The inception-to-date revenue from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "WeekNineToTwelveOverAllocated":{ "type":"number", "description":"The number of labor resources who are assigned to tasks for more than one hundred percent of their allocated hours during the next nine to twelve weeks of the project.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastRevenueVariancePercentage":{ "type":"number", "description":"The period-to-date percentage for the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualCapitalizableCostPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage for the actual capitalizable cost divided by the total burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualSpentLaborEffortPercentage":{ "type":"number", "description":"The inception-to-date percentage for the actual labor effort divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastLaborEffortVariancePercentage":{ "type":"number", "description":"The period-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualNonbillableLaborEffortinHoursPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual labor effort that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDRevenueVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the actual revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "links":{ "title":"Links", "type":"array", "description":"The link relations associated with the resource instance.", "items":{ "$ref":"#/components/schemas/link" } }, "ITDActualCapitalizableCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual burdened cost that's eligible for capitalization against an asset.", "nullable":true, "readOnly":true, "x-queryable":true }, "ProgramBudgetCurrency":{ "maxLength":15, "type":"string", "description":"The currency of the budgeted amount allotted to the program.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACOriginalBudgetandEACForecastMarginVariance":{ "type":"number", "description":"The total at completion for the original baseline budget margin minus the estimate-at-completion for the current approved forecast margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "MissingTimeCardsFourWeeksOld":{ "type":"number", "description":"The number of time cards that are missing or incomplete for a project and due four weeks ago. Only resources that are enabled to track time are considered.", "nullable":true, "readOnly":true, "x-queryable":true }, "SystemStatusCode":{ "maxLength":30, "type":"string", "description":"The code that represents the system status. Values are DRAFT, SUBMITTED, ACTIVE, PENDING_CLOSE, and CLOSED. Review status values using the Setup and Maintenance work area and the Manage Project Statuses task.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetLaborEffortPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date labor effort from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDRevenuePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual amount recognized as revenue on a contract.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastRevenueVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the current approved forecast revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "OwningOrganizationName":{ "maxLength":240, "type":"string", "description":"The name of the owning organization. Review and update organizations classified as owning organizations using the Setup and Maintenance work area and the Manage Project Organization Classifications task.", "nullable":false, "readOnly":true, "x-queryable":true }, "ITDActualNonbillableLaborEffortinHours":{ "type":"number", "description":"The inception-to-date actual labor effort that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "TreeStructureId":{ "title":"Tree Structure ID", "type":"integer", "description":"The unique identifier of the program hierarchy structure.", "format":"int64", "nullable":true, "readOnly":true, "x-hints":{ "precision":18 }, "x-queryable":true }, "YTDCostVariancePercentage":{ "type":"number", "description":"The year-to-date percentage for the current baseline budget burdened cost minus the actual burdened cost, divided by the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastMargin":{ "type":"number", "description":"The period-to-date current approved forecast revenue minus the current approved forecast burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDRevenueVariancePercentage":{ "type":"number", "description":"The inception-to-date percentage for the current baseline budget revenue minus the actual revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDActualCapitalizableCost":{ "type":"number", "description":"The year-to-date actual burdened cost that's eligible to capitalize against an asset.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDCommittedCost":{ "type":"number", "description":"The inception-to-date amount of purchase requisitions, purchase orders, and supplier invoices as specified during reporting setup.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetMarginPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget revenue minus the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "Objective":{ "maxLength":400, "type":"string", "description":"The objective of the program.", "nullable":true, "readOnly":true, "x-queryable":true }, "PreviousPeriodStartDate":{ "type":"string", "description":"Start date of the period that precedes the current one, used to compare a performance measure value against the current and previous value.", "format":"date-time", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualCapitalizableCostPercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date percentage for the actual capitalizable cost divided by the total burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualCapitalizableCostPercentage":{ "type":"number", "description":"The inception-to-date percentage for the actual capitalizable cost divided by the total burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "EstimatetoCompleteCost":{ "type":"number", "description":"The estimate-to-complete for the current approved forecast burdened cost minus the actual burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetLaborCost":{ "type":"number", "description":"The period-to-date labor cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date burdened cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACCurrentandPreviousForecastCostVariance":{ "type":"number", "description":"The estimate-at-completion for the current approved forecast burdened cost minus the previously approved forecast burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDMarginVariance":{ "type":"number", "description":"The year-to-date current baseline budget margin minus the actual margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastLaborCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date labor cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDRevenue":{ "type":"number", "description":"The year-to-date actual amount recognized as revenue on a contract.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastLaborEffortVariancePercentage":{ "type":"number", "description":"The year-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "OwnerName":{ "maxLength":240, "type":"string", "description":"The name of the person who's assigned as the program owner or the primary project manager.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastRevenueVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date current baseline budget revenue minus the current approved forecast revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualCapitalizableCost":{ "type":"number", "description":"The inception-to-date actual burdened cost that's eligible to capitalize against an asset.", "nullable":true, "readOnly":true, "x-queryable":true }, "EarnedValueScheduleVariance":{ "type":"number", "description":"The earned value minus the planned value.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACBudgetCost":{ "type":"number", "description":"The total at completion for the burdened cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "AssignmentsReserved":{ "type":"number", "description":"The number of resources with reserved assignments to the project.", "nullable":true, "readOnly":true, "x-queryable":true }, "MissingTimeCardsThreeWeeksOld":{ "type":"number", "description":"The number of time cards that are missing or incomplete for a project and due three weeks ago. Only resources that are enabled to track time are considered.", "nullable":true, "readOnly":true, "x-queryable":true }, "EACCurrentandPreviousForecastLaborEffortVariance":{ "type":"number", "description":"The estimate-at-completion for the current approved forecast labor effort minus the previously approved forecast labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastCost":{ "type":"number", "description":"The year-to-date burdened cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "YTDForecastMargin":{ "type":"number", "description":"The year-to-date current approved forecast revenue minus the current approved forecast burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastLaborCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date labor cost from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastMarginVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget margin minus the current approved forecast margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "ACBudgetMargin":{ "type":"number", "description":"The total-at-completion value for the current baseline budget revenue minus the current baseline budget cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualNonbillableCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the period-to-date actual burdened cost that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "SchedulePerformanceIndex":{ "type":"number", "description":"The earned value divided by the planned value.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetMarginPercentage":{ "type":"number", "description":"The period-to-date percentage of the current baseline budget margin divided by the current baseline revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "PublicFlag":{ "title":"Public access", "maxLength":1, "type":"string", "description":"Indicates whether the program hierarchy can be viewed by all. If true, then programs in the hierarchy can be viewed by all. If false, then only the persons assigned as stakeholders directly or inherited from a parent or grandparent program can view their programs. The value is defined for the root node of the hierarchy. The default value is false.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastLaborEffortVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "InvoicesAwaitingApproval":{ "type":"number", "description":"The number of invoices submitted for the project that are pending approval.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDDurationinDays":{ "type":"number", "description":"The inception-to-date days from the start date.", "nullable":true, "readOnly":true, "x-queryable":true }, "ProgramDFF":{ "type":"array", "items":{ "$ref":"#/components/schemas/projectProgramInsights-ProgramDFF-item-response" }, "x-cardinality":"1" }, "ObjectId":{ "title":"Object ID", "type":"integer", "description":"The unique identifier of the program or project.", "nullable":true, "readOnly":true, "x-queryable":true }, "MilestonesPastDue":{ "type":"number", "description":"The number of milestones that aren't completed by the finish date.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastRevenueVariance":{ "type":"number", "description":"The period-to-date current baseline budget revenue minus the current approved forecast revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ActualWorkPlanEffortinHours":{ "type":"number", "description":"The actual effort worked for a work plan.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDForecastMarginVariance":{ "type":"number", "description":"The period-to-date current baseline budget margin minus the current approved forecast margin.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDMarginPercentageVariance":{ "type":"number", "description":"The period-to-date current baseline budget margin percentage minus the actual margin percentage.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDActualNonbillableLaborEffortinHours":{ "type":"number", "description":"The period-to-date actual labor effort that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "OwningOrganizationId":{ "title":"Owning Organization ID", "type":"integer", "description":"The unique identifier of the owning organization.", "format":"int64", "nullable":true, "readOnly":true, "x-hints":{ "precision":18 }, "x-queryable":true }, "ITDForecastLaborEffortVariancePercentage":{ "type":"number", "description":"The inception-to-date percentage for the current baseline budget labor effort minus the current approved forecast labor effort, divided by the current baseline budget labor effort.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDBudgetLaborCostPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date labor cost from the current baseline budget.", "nullable":true, "readOnly":true, "x-queryable":true }, "PTDBudgetMargin":{ "type":"number", "description":"The period-to-date current baseline budget revenue minus the current baseline budget burdened cost.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastRevenuePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date revenue from the current approved forecast.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDActualNonbillableLaborEffortinHoursPrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date actual labor effort that isn't eligible for billing.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastRevenueVariancePercentagePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date percentage of the current baseline budget revenue minus the current approved forecast revenue, divided by the current baseline budget revenue.", "nullable":true, "readOnly":true, "x-queryable":true }, "ITDForecastCostVariancePrevValues":{ "maxLength":255, "type":"string", "description":"Previous and prior period values used to identify the trend of the inception-to-date current baseline budget cost minus the current approved forecast cost.", "nullable":true, "readOnly":true, "x-queryable":true } } }