Control Analysis Job Message Identifies Invalid Access Points
A job to run a batch of controls may include one or more controls that reference invalid access points. If so, the job status is Job completed with errors. The job message now identifies the controls and access points that have issues. Other controls in the batch are processed and are not impacted.
An invalid access point scenario can occur if any access point directly referenced in a model or control no longer exists due to deprecation in the application.
Control Analysis Job Details with Invalid Access Point Message
Business Benefit
This feature will identify specifically which control contains an invalid access point that prevents it from running successfully.
Steps to Enable
You don't need to do anything to enable this feature.