Improve Sequencing Decisions to Reduce Overall Changeover Times

In situations where a user-defined attribute sequence isn’t being used, the application looks ahead and pulls forward work order operations with identical grouping attribute value and schedules them together. This reduces unnecessary changeovers and improves throughput.

In Scheduling Organizations, Resource Parameters, specify the parameter Grouping Attribute for Changeover Reduction. Attributes assigned to the respective resource in Scheduling Organizations, Attributes, Resource Attributes can be selected. 

New Resource Parameter

New Resource Parameter

The attribute specified in Grouping Attribute for Changeover Reduction is the attribute that Production Scheduling uses to group operations with the same attribute value for changeover reduction. It works in conjunction with the advanced schedule option Look Ahead Window in Days. The Look Ahead Window in Days is the number of days that Production Scheduling scans into the future to identify operations with the same attribute value and tries to schedule them adjacently to reduce changeovers. 

The New Advanced Schedule Option is Grouped with Two Previously Existing Ones

The New Advanced Schedule Option is Grouped with Two Previously Existing Ones

The following diagram shows a conceptual example of this behavior. The task labels A, B, C, D correspond to the attribute values of the respective Grouping Attribute for Changeover Reduction from the resource parameters. The black bars represent the changeovers. 

The first representation shows an operation sequence without the new capability applied. Here, the changeovers are considered only locally, resulting in a total of 7 changeovers. 

The second representation uses the new capability with a look ahead value of 1 day. In this case, the number of changeovers is reduced due to better grouping of operations. 

Changeover Reduction Using Look Ahead Window

Changeover Reduction Using Look Ahead Window

Note that this only applies when the user-defined attribute sequence functionality is not used.

Steps to Enable

Use the Opt In UI to enable this feature. For instructions, refer to the Optional Uptake of New Features section of this document.

Offering: Supply Chain Planning

Tips And Considerations

If you want to use the Improve Sequencing Decisions to Reduce Overall Changeover Times feature, then you must opt in to its parent feature: Production Scheduling. If you’ve already opted in to this parent feature, then you don’t have to opt in again.

Key Resources

Access Requirements

Users who are assigned a configured job role that contains this privilege can access this feature:

  • Edit Production Schedule (MSC_EDIT_PRODUCTION_SCHEDULE_PRIV)

This privilege was available prior to this update.