How You View Asset Work Order Cost

View maintenance work order costs for an asset directly on the Cost tab of the Edit Asset page.

You use the filters on the Asset Cost tab to view costs at an individual work order level or aggregated by period for the asset. The costs are then displayed for a selected maintenance organization and time period. The search results table shows these details:

Attribute

Description

Period

Period from which the cost is displayed.

Work Order

The work order corresponding to the displayed cost.

Asset

The work order asset corresponding to the displayed cost.

Material Cost

Total material cost for the corresponding work order asset for the period.

Labor Cost

Total labor cost for the corresponding work order asset for the period.

Equipment Cost

Total equipment cost for the corresponding work order asset for the period.