Retrieve Inventory Item Costs Job
The Retrieve Inventory Item Costs schedule process retrieves the latest material cost information pertaining to all the child items of the assemblies, or sub-assemblies whose costing information exists in the costing system.
You can retrieve the material cost of an existing item from Costing. If the item has a cost attribute defined in Costing, the Material Cost of the item in Product Development is read-only.
When to Use
Run this process periodically to retrieve the material cost information pertaining to the child items of the assemblies or sub-assemblies whose cost information exists in the costing system.
Privileges Required
- Manage Item (EGP_MANAGE_ITEM_PRIV)
- Manage Scheduled Processes (FND_MANAGE_SCHEDULED_PROCESSES_PRIV)
Specifications
Review the following before setting up this scheduled process:
Specifications | Descriptions |
---|---|
Job Type | Ad hoc job. |
Frequency | On need basis |
Time of Day | On need basis |
Duration | Depends on the transaction volume |
Compatibility | There should be only one instance of the job running at any time, and there’s no current functional need to run multiple instances of this process simultaneously. |
Parameters
None
Troubleshooting Information
- You can view the status of the process by selecting the row in the Scheduled Processes work area and viewing the log or process details.
- The validation errors and warning messages are displayed in the error log.
- Interactive warning validations aren’t performed.
- After you submit the program, you can perform the following actions as provided in the Scheduled Processes work area - Resubmit, Put on Hold, Cancel Process, and Release Process.