Create production plans

post

/fscmRestApi/resources/11.13.18.05/productionSchedulingPlans

Request

Header Parameters
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
  • Contains one of the following values: true or false. If true, the server performs an Upsert operation instead of a Create operation. During an Upsert operation, the server attempts to find an existing resource that matches the payload. If a match is found, the server updates the existing resource instead of creating a new one. If not found or false (default), the server performs a Create operation. Note that the Upsert operation isn't supported for date-effective REST resources.
Supported Media Types
Request Body - application/json ()
Root Schema : schema
Type: object
Show Source
Nested Schema : Assets
Type: array
Title: Assets
The Assets resource manages the assets that require maintenance.
Show Source
Nested Schema : Assigned Attribute Values
Type: array
Title: Assigned Attribute Values
The Assigned Attribute Values resource manages the attributes that are assigned to work order operations that are used for scheduling.
Show Source
Nested Schema : Attributes
Type: array
Title: Attributes
The Attributes resource manages the attributes that are a part of the plan that are used for scheduling.
Show Source
Nested Schema : Calendar Events
Type: array
Title: Calendar Events
The Calendar Events resource manages the specific events on a calendar that indicates what time a resource is available.
Show Source
Nested Schema : Calendars
Type: array
Title: Calendars
The Calendars resource manages the calendars that are part of the schedule to establish availability.
Show Source
Nested Schema : Changeover Instances
Type: array
Title: Changeover Instances
The Changeover Instances resource manages the individual changeover instances that occur on a production resource as a result of the changeover rules.
Show Source
Nested Schema : Changeover Rules
Type: array
Title: Changeover Rules
The Changeover Rules resource manages the changeover rules by attribute for a production resource or group.
Show Source
Nested Schema : KPI for Changeover Times
Type: array
Title: KPI for Changeover Times
The KPI for Changeover Times resource manages the key performance indicator for changeover times of the production schedule used for reporting.
Show Source
Nested Schema : Demand Events
Type: array
Title: Demand Events
The Demand Events resource manages the demands to be considered in the production schedule.
Show Source
Nested Schema : Items
Type: array
Title: Items
The Items resource manages the items that are part of the schedule and can include purchased, manufactured, and finished good items.
Show Source
Nested Schema : KPI for Late Demands
Type: array
Title: KPI for Late Demands
The KPI for Late Demands resource manages the key performance indicator for late demands of the production schedule used for reporting.
Show Source
Nested Schema : KPI for Late Work Orders
Type: array
Title: KPI for Late Work Orders
The KPI for Late Work Orders resource manages the key performance indicator for late work orders of the production schedule used for reporting.
Show Source
Nested Schema : Pegging Relationships
Type: array
Title: Pegging Relationships
The Pegging Relationships resource manages the pegging between different types of supply and demand.
Show Source
Nested Schema : Plan Statuses
Type: array
Title: Plan Statuses
The Plan Statuses resource manages the different states of the schedule and determines when the schedule is completed.
Show Source
Nested Schema : Reservations
Type: array
Title: Reservations
The Reservations resource manages the reservations in a schedule.
Show Source
Nested Schema : Resource Availability Levels
Type: array
Title: Resource Availability Levels
The level of resource units available for the schedule. This can occur if you have varying resource unit levels by shift such as 10 in the day shift and 8 in the night shift or during holidays where 0 resource units are available.
Show Source
Nested Schema : Resource Calendars
Type: array
Title: Resource Calendars
The Resource Calendars resource manages the association of the calendar to the production resource.
Show Source
Nested Schema : Resource Changeover Sequences
Type: array
Title: Resource Changeover Sequences
The Resource Changeover Sequences resource manages the changeover sequences for a production resource.
Show Source
Nested Schema : Resource Groups
Type: array
Title: Resource Groups
The Resource Groups resource manages the user-defined groups of resources.
Show Source
Nested Schema : Resource Group Utilization
Type: array
Title: Resource Group Utilization
The Resource Group Utilization resource manages the resource utilization of a production resource group.
Show Source
Nested Schema : Resource Operation Sequences
Type: array
Title: Resource Operation Sequences
The Resource Operation Sequences resource manages the sequence of operations that occur on a production resource.
Show Source
Nested Schema : Resource Relationships
Type: array
Title: Resource Relationships
The Resource Relationships resource manages the upstream and downstream production resource relationships that describe how a product can be manufactured in a multistage production environment.
Show Source
Nested Schema : Resources
Type: array
Title: Resources
The Resources resource manages production resources that are part of the production schedule.
Show Source
Nested Schema : Resource Usage Levels
Type: array
Title: Resource Usage Levels
The Resource Usage Levels resource manages the usage levels for a production resource.
Show Source
Nested Schema : Resource Utilization
Type: array
Title: Resource Utilization
The Resource Utilization resource manages the resource utilization of a production resource.
Show Source
Nested Schema : KPIs for Resource Utilization
Type: array
Title: KPIs for Resource Utilization
The KPI for Resource Utilization resource manages the summary of the overall utilization of the production resources that are included in the schedule and used for reporting.
Show Source
Nested Schema : KPI Summaries
Type: array
Title: KPI Summaries
The KPI Summaries resource manages the summary of the overall key performance indicators of the production schedule used for reporting.
Show Source
Nested Schema : Scheduling Resources
Type: array
Title: Scheduling Resources
The Scheduling Resources resource manages the production resources used in the production schedule.
Show Source
Nested Schema : Selected Item Categories
Type: array
Title: Selected Item Categories
The Selected Item Categories resource manages the item categories used to establish the scope of items to include in the production schedule.
Show Source
Nested Schema : Supply Events
Type: array
Title: Supply Events
The Supply Events resource manages the supplies that are a part of the production schedule and can include purchase orders, transfer orders, and on hand.
Show Source
Nested Schema : Work Order Operation Alternate Resources
Type: array
Title: Work Order Operation Alternate Resources
The Work Order Operation Alternate Resources resource manages the viable alternate production resource that can be used for an operation.
Show Source
Nested Schema : Work Order Operation Attributes
Type: array
Title: Work Order Operation Attributes
The Work Order Operation Attributes resource manages the attributes that are relevant for a work order operation and used to generate a production schedule.
Show Source
Nested Schema : Work Order Operations
Type: array
Title: Work Order Operations
The Operations resource manages the operations that are a part of the work definition.
Show Source
Nested Schema : Work Orders
Type: array
Title: Work Orders
The Work Orders resource manages the work orders that are to be scheduled in the production schedule.
Show Source
Nested Schema : Work Order Temporal Relations
Type: array
Title: Work Order Temporal Relations
The Work Order Temporal Relations resource manages the temporal relations between the upstream and downstream operations.
Show Source
Nested Schema : productionSchedulingPlans-assets-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-assignedAttributeValues-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-attributes-item-post-request
Type: object
Show Source
Nested Schema : Attribute Values
Type: array
Title: Attribute Values
The Attribute Values resource manages the attribute values that are used in the scheduling changeover rules.
Show Source
Nested Schema : productionSchedulingPlans-attributes-attributeValues-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-calendarEvents-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-calendars-item-post-request
Type: object
Show Source
Nested Schema : Calendar Events
Type: array
Title: Calendar Events
The Calendar Events resource manages the specific events on a calendar that indicates what time a resource is available.
Show Source
Nested Schema : productionSchedulingPlans-calendars-calendarEvents-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-changeoverInstances-item-post-request
Type: object
Show Source
Nested Schema : Changeover Instance Details
Type: array
Title: Changeover Instance Details
The Changeover Instance Details resource manages the details of the changeovers including the attributes and durations that impact that changeover.
Show Source
Nested Schema : productionSchedulingPlans-changeoverInstances-changeoverInstanceDetails-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-changeoverRules-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-changeoverTimeMeasures-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-demandEvents-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-items-item-post-request
Type: object
Show Source
Nested Schema : On Hold Lots
Type: array
Title: On Hold Lots
The On Hold Lots resource manages the on-hand inventory that's on hold.
Show Source
Nested Schema : productionSchedulingPlans-items-onHoldLots-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-lateDemandMeasures-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-lateWorkOrderMeasures-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-peggingRelationships-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-planStatus-item-post-request
Type: object
Show Source
Nested Schema : Plan Status Details
Type: array
Title: Plan Status Details
The Plan Status Details resource manages the details of the different states of the schedule.
Show Source
Nested Schema : productionSchedulingPlans-planStatus-planStatusDetails-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-reservations-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceAvailabilityLevels-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceCalendars-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceChangeoverSequences-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceGroups-item-post-request
Type: object
Show Source
Nested Schema : Resource Group Members
Type: array
Title: Resource Group Members
The Resource Group Members resource manages the resources associated with a resource group.
Show Source
Nested Schema : productionSchedulingPlans-resourceGroups-groupMembers-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceGroupUtilization-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceOperationSequences-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceRelationships-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resources-item-post-request
Type: object
Show Source
  • Maximum Length: 1
    Contains one of the following values: true or false. If true, then apply user-defined ideal sequence to a resource. If false, then don't apply user-defined ideal sequence to a resource. This attribute doesn't have a default value.
  • Value that uniquely identifies the available calendar.
  • Availability Levels
    Title: Availability Levels
    The level of resource units available for the work center resource. This can occur if you have varying resource unit levels by shift such as 10 in the day shift and 8 in the night shift or during holidays where 0 resource units are available.
  • Maximum Length: 30
    Type of resource capacity. Valid values include single capacity, multiple capacity, or batch.
  • Maximum Length: 12
    Value that indicates whether multiple changeover rules that apply at the same time shall be considered to occur concurrently or in sequence. This attribute applies only to equipment resources. Valid values include Concurrent and Sequential.
  • Maximum Length: 12
    Value that indicates whether changeovers will be considered as setup or cleanup activities. This attribute applies only to equipment resources. Valid values include Setup and Cleanup.
  • Maximum Length: 30
    Mode of constraint. Valid values include RelaxCapacity, Relaxed, and Constrained.
  • Maximum Length: 1
    Contains one of the following values: Y or N. If Y, then the horizon start will be enforced during schedule generation. If N, then the horizon start won't be enforced during schedule generation. This attribute doesn't have a default value.
  • Duration of the fixed time fence from the start of the horizon.
  • Maximum Length: 12
    Time unit of measure for the fixed time fence. Valid values include seconds, minutes, hours, and days.
  • Maximum capacity for multiple capacity resources.
  • Value that uniquely identifies the production schedule.
  • Prebuild maximum considered by the dynamic resource allocation solver method.
  • Maximum Length: 1
    Contains one of the following values: true or false. If true, then use the prebuild maximum. If false, then don't use prebuild maximum. This attribute doesn't have a default value.
  • Maximum Length: 12
    Time unit of measure for the prebuild maximum. Valid values include seconds, minutes, hours, and days.
  • Maximum Length: 1
    Contains one of the following values: true or false. If true, then continue ideal sequence independent of rank. If false, then don't continue ideal sequence independent of rank. This attribute doesn't have a default value.
  • Maximum Length: 300
    Abbreviation that identifies the production resource.
  • Value that uniquely identifies the production resource. It's a primary key of the resource.
  • Maximum Length: 120
    Name of the resource.
  • Maximum Length: 30
    Type of production resource. Valid values include Equipment or Labor.
  • Maximum Length: 1
    Contains one of the following values: Y or N. If Y, then the user-defined ideal attribute sequence will be restarted at each scheduling cycle boundary during schedule generation. If N, then the user-defined ideal attribute sequence won't be restarted. This attribute doesn't have a default value.
  • Usage Levels
    Title: Usage Levels
    The Usage Levels resource manages the usage levels for a production resource.
  • Maximum Length: 100
    Abbreviation that identifies the work center.
  • Value that uniquely identifies the work center. It's a primary key of the work center.
  • Maximum Length: 120
    Name of the work center that's associated with the resource.
Nested Schema : Availability Levels
Type: array
Title: Availability Levels
The level of resource units available for the work center resource. This can occur if you have varying resource unit levels by shift such as 10 in the day shift and 8 in the night shift or during holidays where 0 resource units are available.
Show Source
Nested Schema : Usage Levels
Type: array
Title: Usage Levels
The Usage Levels resource manages the usage levels for a production resource.
Show Source
Nested Schema : schema
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resources-usageLevels-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceUsageLevels-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceUtilization-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceUtilizationMeasures-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-scheduleMeasures-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-schedulingResources-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-selectedItemCategories-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-supplyEvents-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperationAlternateResources-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperationAttributes-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperations-item-post-request
Type: object
Show Source
Nested Schema : Operation Materials
Type: array
Title: Operation Materials
The Operation Materials resource manages the items that are either produced or consumed during the manufacturing production process.
Show Source
Nested Schema : Operation Resources
Type: array
Title: Operation Resources
The Operation Resources resource manages the production resources that are used for a particular operation.
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperations-operationMaterials-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperations-operationResources-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrders-item-post-request
Type: object
Show Source
Nested Schema : Demands
Type: array
Title: Demands
Demands and customers pegged to a work order.
Show Source
Nested Schema : Work Order Operations
Type: array
Title: Work Order Operations
The Operations resource manages the operations that are a part of the work definition.
Show Source
Nested Schema : productionSchedulingPlans-workOrders-demands-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrders-operations-item-post-request
Type: object
Show Source
Nested Schema : Operation Materials
Type: array
Title: Operation Materials
The Operation Materials resource manages the items that are either produced or consumed during the manufacturing production process.
Show Source
Nested Schema : Operation Resources
Type: array
Title: Operation Resources
The Operation Resources resource manages the production resources that are used for a particular operation.
Show Source
Nested Schema : productionSchedulingPlans-workOrders-operations-operationMaterials-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrders-operations-operationResources-item-post-request
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderTemporalRelations-item-post-request
Type: object
Show Source
Back to Top

Response

Supported Media Types

Default Response

The following table describes the default response for this task.
Headers
  • If the REST API supports runtime customizations, the shape of the service may change during runtime. The REST client may isolate itself from these changes or choose to interact with the latest version of the API by specifying this header. For example: Metadata-Context:sandbox="TrackEmployeeFeature".
  • The protocol version between a REST client and service. If the client does not specify this header in the request the server will pick a default version for the API.
Body ()
Root Schema : productionSchedulingPlans-item-response
Type: object
Show Source
Nested Schema : Assets
Type: array
Title: Assets
The Assets resource manages the assets that require maintenance.
Show Source
Nested Schema : Assigned Attribute Values
Type: array
Title: Assigned Attribute Values
The Assigned Attribute Values resource manages the attributes that are assigned to work order operations that are used for scheduling.
Show Source
Nested Schema : Attributes
Type: array
Title: Attributes
The Attributes resource manages the attributes that are a part of the plan that are used for scheduling.
Show Source
Nested Schema : Calendar Events
Type: array
Title: Calendar Events
The Calendar Events resource manages the specific events on a calendar that indicates what time a resource is available.
Show Source
Nested Schema : Calendars
Type: array
Title: Calendars
The Calendars resource manages the calendars that are part of the schedule to establish availability.
Show Source
Nested Schema : Changeover Instances
Type: array
Title: Changeover Instances
The Changeover Instances resource manages the individual changeover instances that occur on a production resource as a result of the changeover rules.
Show Source
Nested Schema : Changeover Rules
Type: array
Title: Changeover Rules
The Changeover Rules resource manages the changeover rules by attribute for a production resource or group.
Show Source
Nested Schema : KPI for Changeover Times
Type: array
Title: KPI for Changeover Times
The KPI for Changeover Times resource manages the key performance indicator for changeover times of the production schedule used for reporting.
Show Source
Nested Schema : Demand Events
Type: array
Title: Demand Events
The Demand Events resource manages the demands to be considered in the production schedule.
Show Source
Nested Schema : Items
Type: array
Title: Items
The Items resource manages the items that are part of the schedule and can include purchased, manufactured, and finished good items.
Show Source
Nested Schema : KPI for Late Demands
Type: array
Title: KPI for Late Demands
The KPI for Late Demands resource manages the key performance indicator for late demands of the production schedule used for reporting.
Show Source
Nested Schema : KPI for Late Work Orders
Type: array
Title: KPI for Late Work Orders
The KPI for Late Work Orders resource manages the key performance indicator for late work orders of the production schedule used for reporting.
Show Source
Nested Schema : Pegging Relationships
Type: array
Title: Pegging Relationships
The Pegging Relationships resource manages the pegging between different types of supply and demand.
Show Source
Nested Schema : Plan Statuses
Type: array
Title: Plan Statuses
The Plan Statuses resource manages the different states of the schedule and determines when the schedule is completed.
Show Source
Nested Schema : Reservations
Type: array
Title: Reservations
The Reservations resource manages the reservations in a schedule.
Show Source
Nested Schema : Resource Availability Levels
Type: array
Title: Resource Availability Levels
The level of resource units available for the schedule. This can occur if you have varying resource unit levels by shift such as 10 in the day shift and 8 in the night shift or during holidays where 0 resource units are available.
Show Source
Nested Schema : Resource Calendars
Type: array
Title: Resource Calendars
The Resource Calendars resource manages the association of the calendar to the production resource.
Show Source
Nested Schema : Resource Changeover Sequences
Type: array
Title: Resource Changeover Sequences
The Resource Changeover Sequences resource manages the changeover sequences for a production resource.
Show Source
Nested Schema : Resource Groups
Type: array
Title: Resource Groups
The Resource Groups resource manages the user-defined groups of resources.
Show Source
Nested Schema : Resource Group Utilization
Type: array
Title: Resource Group Utilization
The Resource Group Utilization resource manages the resource utilization of a production resource group.
Show Source
Nested Schema : Resource Operation Sequences
Type: array
Title: Resource Operation Sequences
The Resource Operation Sequences resource manages the sequence of operations that occur on a production resource.
Show Source
Nested Schema : Resource Relationships
Type: array
Title: Resource Relationships
The Resource Relationships resource manages the upstream and downstream production resource relationships that describe how a product can be manufactured in a multistage production environment.
Show Source
Nested Schema : Resources
Type: array
Title: Resources
The Resources resource manages production resources that are part of the production schedule.
Show Source
Nested Schema : Resource Usage Levels
Type: array
Title: Resource Usage Levels
The Resource Usage Levels resource manages the usage levels for a production resource.
Show Source
Nested Schema : Resource Utilization
Type: array
Title: Resource Utilization
The Resource Utilization resource manages the resource utilization of a production resource.
Show Source
Nested Schema : KPIs for Resource Utilization
Type: array
Title: KPIs for Resource Utilization
The KPI for Resource Utilization resource manages the summary of the overall utilization of the production resources that are included in the schedule and used for reporting.
Show Source
Nested Schema : KPI Summaries
Type: array
Title: KPI Summaries
The KPI Summaries resource manages the summary of the overall key performance indicators of the production schedule used for reporting.
Show Source
Nested Schema : Scheduling Resources
Type: array
Title: Scheduling Resources
The Scheduling Resources resource manages the production resources used in the production schedule.
Show Source
Nested Schema : Selected Item Categories
Type: array
Title: Selected Item Categories
The Selected Item Categories resource manages the item categories used to establish the scope of items to include in the production schedule.
Show Source
Nested Schema : Supply Events
Type: array
Title: Supply Events
The Supply Events resource manages the supplies that are a part of the production schedule and can include purchase orders, transfer orders, and on hand.
Show Source
Nested Schema : Work Order Operation Alternate Resources
Type: array
Title: Work Order Operation Alternate Resources
The Work Order Operation Alternate Resources resource manages the viable alternate production resource that can be used for an operation.
Show Source
Nested Schema : Work Order Operation Attributes
Type: array
Title: Work Order Operation Attributes
The Work Order Operation Attributes resource manages the attributes that are relevant for a work order operation and used to generate a production schedule.
Show Source
Nested Schema : Work Order Operations
Type: array
Title: Work Order Operations
The Operations resource manages the operations that are a part of the work definition.
Show Source
Nested Schema : Work Orders
Type: array
Title: Work Orders
The Work Orders resource manages the work orders that are to be scheduled in the production schedule.
Show Source
Nested Schema : Work Order Temporal Relations
Type: array
Title: Work Order Temporal Relations
The Work Order Temporal Relations resource manages the temporal relations between the upstream and downstream operations.
Show Source
Nested Schema : productionSchedulingPlans-assets-item-response
Type: object
Show Source
  • Read Only: true
    Value that uniquely identifies the asset charge. This attribute is read only.
  • Read Only: true
    Maximum Length: 80
    Number that uniquely identifies the asset.
  • Read Only: true
    Maximum Length: 64
    User who created the record.
  • Read Only: true
    Date and time when the user created the record.
  • Read Only: true
    Maximum Length: 240
    Description of the asset that the user defines. It can describe the features, characteristics, and so on of the asset.
  • Read Only: true
    Maximum Length: 300
    Abbreviation that uniquely identifies the item that the asset references. The application determines this value from the attribute that identifies the item. This attribute is read only.
  • Read Only: true
    Value that uniquely identifies the item that the asset references.
  • Read Only: true
    Date and time when the user most recently updated the record.
  • Read Only: true
    Maximum Length: 64
    User who most recently updated the record.
  • Read Only: true
    Maximum Length: 32
    Login that the user used when updating the record.
  • Links
  • Read Only: true
    Value that uniquely identifies the production schedule.
  • Read Only: true
    Maximum Length: 80
    Number that uniquely identifies the serial that the asset references. This attributes is applied when the item is serial controlled.
Nested Schema : productionSchedulingPlans-assignedAttributeValues-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-attributes-item-response
Type: object
Show Source
Nested Schema : Attribute Values
Type: array
Title: Attribute Values
The Attribute Values resource manages the attribute values that are used in the scheduling changeover rules.
Show Source
Nested Schema : productionSchedulingPlans-attributes-attributeValues-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-calendarEvents-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-calendars-item-response
Type: object
Show Source
Nested Schema : Calendar Events
Type: array
Title: Calendar Events
The Calendar Events resource manages the specific events on a calendar that indicates what time a resource is available.
Show Source
Nested Schema : productionSchedulingPlans-calendars-calendarEvents-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-changeoverInstances-item-response
Type: object
Show Source
Nested Schema : Changeover Instance Details
Type: array
Title: Changeover Instance Details
The Changeover Instance Details resource manages the details of the changeovers including the attributes and durations that impact that changeover.
Show Source
Nested Schema : productionSchedulingPlans-changeoverInstances-changeoverInstanceDetails-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-changeoverRules-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-changeoverTimeMeasures-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-demandEvents-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-items-item-response
Type: object
Show Source
Nested Schema : On Hold Lots
Type: array
Title: On Hold Lots
The On Hold Lots resource manages the on-hand inventory that's on hold.
Show Source
Nested Schema : productionSchedulingPlans-items-onHoldLots-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-lateDemandMeasures-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-lateWorkOrderMeasures-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-peggingRelationships-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-planStatus-item-response
Type: object
Show Source
Nested Schema : Plan Status Details
Type: array
Title: Plan Status Details
The Plan Status Details resource manages the details of the different states of the schedule.
Show Source
Nested Schema : productionSchedulingPlans-planStatus-planStatusDetails-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-reservations-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceAvailabilityLevels-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceCalendars-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceChangeoverSequences-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceGroups-item-response
Type: object
Show Source
Nested Schema : Resource Group Members
Type: array
Title: Resource Group Members
The Resource Group Members resource manages the resources associated with a resource group.
Show Source
Nested Schema : productionSchedulingPlans-resourceGroups-groupMembers-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceGroupUtilization-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceOperationSequences-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceRelationships-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resources-item-response
Type: object
Show Source
Nested Schema : Availability Levels
Type: array
Title: Availability Levels
The level of resource units available for the work center resource. This can occur if you have varying resource unit levels by shift such as 10 in the day shift and 8 in the night shift or during holidays where 0 resource units are available.
Show Source
Nested Schema : Usage Levels
Type: array
Title: Usage Levels
The Usage Levels resource manages the usage levels for a production resource.
Show Source
Nested Schema : productionSchedulingPlans-resources-availabilityLevels-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resources-usageLevels-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceUsageLevels-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceUtilization-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-resourceUtilizationMeasures-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-scheduleMeasures-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-schedulingResources-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-selectedItemCategories-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-supplyEvents-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperationAlternateResources-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperationAttributes-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperations-item-response
Type: object
Show Source
Nested Schema : Operation Materials
Type: array
Title: Operation Materials
The Operation Materials resource manages the items that are either produced or consumed during the manufacturing production process.
Show Source
Nested Schema : Operation Resources
Type: array
Title: Operation Resources
The Operation Resources resource manages the production resources that are used for a particular operation.
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperations-operationMaterials-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderOperations-operationResources-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrders-item-response
Type: object
Show Source
Nested Schema : Demands
Type: array
Title: Demands
Demands and customers pegged to a work order.
Show Source
Nested Schema : Work Order Operations
Type: array
Title: Work Order Operations
The Operations resource manages the operations that are a part of the work definition.
Show Source
Nested Schema : productionSchedulingPlans-workOrders-demands-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrders-operations-item-response
Type: object
Show Source
Nested Schema : Operation Materials
Type: array
Title: Operation Materials
The Operation Materials resource manages the items that are either produced or consumed during the manufacturing production process.
Show Source
Nested Schema : Operation Resources
Type: array
Title: Operation Resources
The Operation Resources resource manages the production resources that are used for a particular operation.
Show Source
Nested Schema : productionSchedulingPlans-workOrders-operations-operationMaterials-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrders-operations-operationResources-item-response
Type: object
Show Source
Nested Schema : productionSchedulingPlans-workOrderTemporalRelations-item-response
Type: object
Show Source
Back to Top

Examples

This example describes how to create one transit time.

Example cURL Command

Use the following cURL command to submit a request on the REST resource.

curl -u username:password -X POST -H "Content-Type:application/vnd.oracle.adf.resourceitem+json" -d 'request payload' 
"https://servername/fscmRestApi/resources/version/productionSchedulingPlans"

Example Request Body

The following example includes the contents of the request body in JSON format. You replace the request payload in the cURL command with the contents of the Example Request Body. The request payload specifies attribute values that the command will use in the record that it creates.

{
	"PlanName": "My Schedule",
	"OrganizationId": 209,
	"OrganizationCode": "M2",
	"Description": "Sample PS Plan",
	"HorizonDuration": 14,
	"HorizonDurationUnit": "days",
	"AnchorTimestamp": "2021-03-01T00:00:00+00:00",
	"HorizonAnchorBehavior": "Rolling",
	"UseAnchorForHorizonFlag": false,
	"MinimumTimeFence": null,
	"HorizonExtension": null,
	"FixedTimeFenceDuration": 7,
	"PublishHorizonDuration": 3,
	"ResourceCapacityHorizonDuration": 7,
	"PastDueDemandDuration": 7,
	"PastDueSupplyDuration": 7
} 

Example Response Body

The following example includes the contents of the response body in JSON format:

{
	"PlanId": 300100222372498,
	"ShortPlanId": null,
	"PlanName": "My Schedule",
	"OrganizationId": 209,
	"OrganizationCode": "M2",
	"Description": "Sample PS Plan",
	"HorizonDuration": 14,
	"HorizonDurationUnit": "days",
	"AnchorTimestamp": "2021-03-01T00:00:00+00:00",
	"HorizonAnchorBehavior": "Rolling",
	"UseAnchorForHorizonFlag": false,
	"MinimumTimeFence": null,
	"HorizonExtension": null,
	"FixedTimeFenceDuration": 7,
	"ActualFixedTimeFenceDuration": null,
	"PublishHorizonDuration": 3,
	"ResourceCapacityHorizonDuration": 7,
	"PastDueDemandDuration": 7,
	"PastDueSupplyDuration": 7,
	"HorizonStartDate": null,
	"HorizonEndDate": null,
	"CalendarHorizonStartDate": null,
	"CalendarHorizonEndDate": null,
	"DataHorizonStartDate": null,
	"DataHorizonEndDate": null,
	"PlanOwner": null,
	"LastApprovedBy": null,
	"ApprovedFlag": null,
	"LastApprovedDate": null,
	"PlanApprovalStatus": null,
	"BuildStrategy": null,
	"PreBuildPolicy": null,
	"ResourceAllocationMode": null,
	"AcceleratedDispatchingFlag": null,
	"RepairUnconstrainedMode": null,
	"RepairSequencingMode": null,
	"UseSchedulingBucketFlag": null,
	"SchedulingBucket": null,
	"SchedulingBucketUnit": null,
	"RespectFirmDatesInsideTimeFenceFlag": null,
	"FirmInsideTimeFenceOnRefreshFlag": null,
	"WorkOrderUnitOfEffort": null,
	"UseSolveTimeLimitFlag": null,
	"SolveTimeLimitDuration": null,
	"SolveTimeLimitUnit": null,
	"RequestInProcessFlag": null,
	"LastRequest": null,
	"LastRequestId": null,
	"LastExecutionId": null,
	"LastRequestAction": null,
	"LastRequestStatus": null,
	"LastRequestPercentage": null,
	"LastRequestEndDate": null,
	"LastRequestErrorCode": null,
	"LastPublishDate": null,
	"LastRefreshDate": null,
	"DefaultResourceGanttGroupId": null,
	"DefaultResourceGanttGroupCode": null,
	"CreatedBy": "PRODUCTION_SCHEDULER",
	"CreationDate": "2020-10-07T16:10:54.018+00:00",
	"LastUpdatedBy": "PRODUCTION_SCHEDULER",
	"LastUpdateDate": "2020-10-07T16:10:54.230+00:00",
	"LastUpdateLogin": "B0968C6B28003D45E0534005F00A6076",
	"links": [
	{
		"rel": "self",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498",
		"name": "productionSchedulingPlans",
		"kind": "item"
	},
	{
		"rel": "canonical",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498",
		"name": "productionSchedulingPlans",
		"kind": "item"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/attributes",
		"name": "attributes",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/calendarEvents",
		"name": "calendarEvents",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/calendars",
		"name": "calendars",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/changeoverInstances",
		"name": "changeoverInstances",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/changeoverRules",
		"name": "changeoverRules",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/changeoverTimeMeasures",
		"name": "changeoverTimeMeasures",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/demandEvents",
		"name": "demandEvents",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/items",
		"name": "items",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/lateDemandMeasures",
		"name": "lateDemandMeasures",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/lateWorkOrderMeasures",
		"name": "lateWorkOrderMeasures",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/planStatus",
		"name": "planStatus",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceCalendars",
		"name": "resourceCalendars",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceChangeoverSequences",
		"name": "resourceChangeoverSequences",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceGroups",
		"name": "resourceGroups",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceOperationSequences",
		"name": "resourceOperationSequences",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceRelationships",
		"name": "resourceRelationships",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceUsageLevels",
		"name": "resourceUsageLevels",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceUtilization",
		"name": "resourceUtilization",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resourceUtilizationMeasures",
		"name": "resourceUtilizationMeasures",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/resources",
		"name": "resources",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/scheduleMeasures",
		"name": "scheduleMeasures",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/schedulingResources",
		"name": "schedulingResources",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/selectedItemCategories",
		"name": "selectedItemCategories",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/supplyEvents",
		"name": "supplyEvents",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/workOrderOperationAlternateResources",
		"name": "workOrderOperationAlternateResources",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/workOrderOperationAttributes",
		"name": "workOrderOperationAttributes",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/workOrderOperations",
		"name": "workOrderOperations",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/workOrderTemporalRelations",
		"name": "workOrderTemporalRelations",
		"kind": "collection"
	},
	{
		"rel": "child",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/child/workOrders",
		"name": "workOrders",
		"kind": "collection"
	},
	{
		"rel": "action",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/action/stopSolvingPlan",
		"name": "stopSolvingPlan",
		"kind": "other"
	},
	{
		"rel": "action",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/action/releasePlan",
		"name": "releasePlan",
		"kind": "other"
	},
	{
		"rel": "action",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/action/refreshPlanData",
		"name": "refreshPlanData",
		"kind": "other"
	},
	{
		"rel": "action",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/action/solvePlan",
		"name": "solvePlan",
		"kind": "other"
	},
	{
		"rel": "action",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/action/repairPlan",
		"name": "repairPlan",
		"kind": "other"
	},
	{
		"rel": "enclosure",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/enclosure/EngineStateFile",
		"name": "EngineStateFile",
		"kind": "other"
	},
	{
		"rel": "enclosure",
		"href": "https://servername/fscmRestApi/resources/version/productionSchedulingPlans/300100222372498/enclosure/ModelExtractFile",
		"name": "ModelExtractFile",
		"kind": "other"
	}
	]
}
Back to Top