Generate Movement Request Documents
The Generate Movement Request Documents scheduled process is a job set that contains the Print Movement Request Pick Slip Report scheduled process.
Use the Print Movement Request Pick Slip Report scheduled process to release movement request lines for picking and to generate corresponding movement request pick slip reports.
When to Use
The Generate Movement Request Documents job set is not run manually, it’s used when configuring whether the output goes to a printer, email, or fax.
The job set is assigned using the Manage Inventory Document Output Preferences task from the Setup and Maintenance work area.
Use the Print Movement Request Pick Slip Report scheduled process to run this manually.
Privileges Required
- Print Movement Request Pick Slip Report (INV_PRINT_MOVEMENT_REQUEST_PICK_SLIP_REPORT_PRIV)
Specifications
Specification | Description |
---|---|
Job Type | Ad hoc job Scheduled |
Frequency |
As required, after movement requests have been created and preapproved. The frequency depends on the number of movement requests requiring processing. Also, the frequency can also depend on your organization’s material picking schedule. For example, you might want to consider running the process immediately before starting picking activities within your warehouse. |
Time of Day | Any time. |
Duration | The runtime of this process varies based on the number of movement requests requiring processing. Also, movement requests for lot and serial-controlled items can take more processing time. |
Compatibility |
There should be only one instance of the Print Movement Request Pick Slip Report process running at any one time. Consider other scheduled processes that are being submitted at the same time. For example, processes such as Transfer Transactions from Inventory to Costing can be submitted after the Manage Inventory Transactions process. |
Parameters
Parameter | Optional or Required | Description | Parameter Values | Special Combinations Required | Notes |
---|---|---|---|---|---|
Organization | Required | Select the inventory organization. You can run this process for those inventory organizations for which you have inventory organization data access. | Inventory organization | None | N/A |
From Movement Request | Optional | Select the starting movement request for a range of movement requests. | Movement request | None | N/A |
To Movement Request | Optional | Select the ending movement request for a range of movement requests. | Movement request | None | N/A |
From Pick Slip | Optional | Select the starting pick slip for a range of pick slips. | Pick slip | None | N/A |
To Pick Slip | Optional | Select the ending pick slip for a range of pick slips. | Pick slip | None | N/A |
Source Subinventory | Optional | Select the source subinventory for the movement request. | Subinventory | None | N/A |
Source Locator | Optional | Select the source locator for the movement request. | Locator | None | N/A |
Destination Subinventory | Optional | Select the destination subinventory for the movement request. | Subinventory | None | N/A |
Destination Locator | Optional | Select the destination locator for the movement request. | Locator | None | N/A |
Requester | Optional | Select the requester name associated with the movement request. | Requester | None | N/A |
From Required Date | Optional | Select the starting movement request required date for a range of dates. | Date | None | N/A |
To Required Date | Optional | Select the ending movement request required date for a range of dates. | Date | None | N/A |
Line Status to Print | Optional | Select the line status to print. |
All Completed picks Open picks Unallocated |
None |
All - Includes movement requests with a pick status of Completed picks, Open picks, and Unallocated movement request. Complete picks - Movement request lines with a pick status of Completed picks. Open picks - Movement request lines with a pick status of Open picks. Unallocated - Movement request lines with a pick status of Unallocated movement request. |
Troubleshooting Information
- You can view the status of the process in the Scheduled Processes work area. If the process status is error, select the row and click the log and output attachment on the Process Details tab. Download the log and output file. Share the files with support to log a service request.
- If the process has completed successfully, use the pick release logs to view
details about your submitted pick wave process. These logs also give you a quick
and easy way to identify which lines were excluded from being released to your
warehouse for picking and why they were omitted. The log messages are created
when pick release is performed using the Schedule Pick Wave scheduled process or
the Release Pick Wave scheduled process (submitted by the Add to
Release Schedule option on the Create Pick Wave page). The logs
provide you with this information:
- Pick release demand selection criteria
- Pick release processing parameters
- Pick release sequence
- Dynamic SQL statement used
- Overall count of the shipment lines that were excluded from selection with the reason those lines were excluded
- In addition, you can also view the exact shipment line numbers that were excluded if you set the Enable Pick Release Detailed profile option (ORA_WSH_PICK_RELEASE_ESS_DETAIL_LOGGING) to Y. This option is set to N by default.