cXML 1.2.009 Change Order Requests
There are two cXML 1.2.009 Change Order Request message definitions outlined in this section:
-
cXML-1-2-009-ChangeOrderRequest-Out
-
OBN-cXML-1-2-009-ChangeOrderRequest-Out
Data Mapping
Refer to Figure 1 in cXML 1.2.007 Order Requests in for the structure of the payload received from the application.
Refer to Figure 2 in cXML 1.2.007 Order Requests for the structure of the payload that is sent to the supplier.
This table shows the data mapping for the predefined cXML message definitions for change order requests, cXML-1-2-009-ChangeOrderRequest-Out and OBN-cXML-1-2-009-ChangeOrderRequest-Out for the extensible purchase order data model.
|
Procurement Source |
Message Payload |
|---|---|
|
Segment1 |
|
|
OrderDate |
|
|
N/A |
Set to Regular. |
|
CollaborationEventName |
Note:
For OrderRequest, the value is new, for ChangeOrderRequest it's update and for CancelOrderRequest, it's delete. |
|
RevisionNum |
Note:
This field is only applicable for OrderRequest or ChangeOrderRequest and the value is equal to RevisionNum + 1. |
|
Attribute1...16 |
|
|
CurrencyCode There's a predefined DVM in use for this field. |
|
|
Ordered |
|
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocCountry |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. There's a predefined DVM in use for this field. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToInternalLocationCode |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. There's a predefined DVM in use for this field. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/LineLocShipToLocationName |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/PdfDraftPurchaseOrderDistributionVORow/Requester |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocAddressLine1 |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocAddressLine2 |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocAddressLine3 |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocTownOrCity |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocStateProvn |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. There's a predefined DVM in use for this field. |
|
|
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocCountry |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. There's a predefined DVM in use for this field. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocCountry |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. There's a predefined DVM in use for this field. |
|
|
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocCountry |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. There's a predefined DVM in use for this field. |
|
PdfDraftPurchaseOrderLineVORow/PdfDraftPurchaseOrderLineLocationVORow/ShipToLocCountry |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. There's a predefined DVM in use for this field. |
|
N/A |
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
|
Note:
The ship-to fields from the first line location (schedule) are mapped to the cXML Fields at the header. |
|
BillToLocCountry There's a predefined DVM in use for this field. |
|
|
BillToLocationCode There's a predefined DVM in use for this field. |
|
|
BillToBuName |
|
|
BillToLocAddressLine1 |
|
|
BillToLocAddressLine2 |
|
|
BillToLocAddressLine3 |
|
|
BillToLocTownOrCity |
|
|
BillToLocStateProvn There's a predefined DVM in use for this field. |
|
|
|
|
|
BillToLocCountry There's a predefined DVM in use for this field. |
|
|
BillToLocCountry There's a predefined DVM in use for this field. |
|
|
BillToLocCountry There's a predefined DVM in use for this field. |
|
|
BillToLocCountry There's a predefined DVM in use for this field. |
|
|
BillToLocTelephoneNumber1 |
|
|
CarrierPartyName |
|
|
CurrencyCode There's a predefined DVM in use for this field. |
|
|
CarrierPartyName |
|
|
N/A |
Set to Buyer. |
|
PersonName |
|
|
SoldToLeAddressLine1 |
|
|
SoldToLeAddressLine2 |
|
|
SoldToLeAddressLine3 |
|
|
SoldToLeAddressLine4 |
|
|
SoldToLeTownOrCity |
|
|
SoldToLeStateProvn There's a predefined DVM in use for this field. |
|
|
|
|
|
SoldToLeCountry There's a predefined DVM in use for this field. |
|
|
SoldToLeCountry There's a predefined DVM in use for this field. |
|
|
PersonEmailAddress |
|
|
SoldToLeCountry There's a predefined DVM in use for this field. |
|
|
SoldToLeCountry There's a predefined DVM in use for this field. |
|
|
PersonWorkPhone |
|
|
PdfDraftPurchaseOrderHeaderVORow/ PdfDraftPurchaseOrderHeaderVOToAttachmentsVOAccessor/ AttachmentsVORow/FileName |
|
|
PdfDraftPurchaseOrderHeaderVORow/ PdfDraftPurchaseOrderHeaderVOToAttachmentsVOAccessor/ AttachmentsVORow/DmDocumentId |
|
|
AcceptanceRequiredFlag |
|
|
AcceptanceDueDate |
|
|
TermsAndConditions |
|
|
HeaderNoteToVendor |
|
|
Line - Line Location |
|
|
Quantity |
|
|
LineNum |
|
|
NeedByDate |
|
|
VendorProductNum |
|
|
SupplierRefNumber |
|
|
N/A |
Set to BUYERPARTNUM. |
|
ItemNumber |
|
|
Attribute1..16 |
|
|
CurrencyCode There's a predefined DVM in use for this field. |
|
|
UnitPrice Note:
For Change Purchase Orders, UnitPrice is mapped. PriceOverride Note:
For Order Requests, PriceOverride is mapped. |
|
|
ItemDescription |
|
|
UnitOfMeasure There's a predefined DVM in use for this field. |
|
|
ShiptoCustomerName |
|
|
LineNum |
|
|
ShipmentNum |
|
|
NoteToVendor |
|
|
SupplierPartyName |
|
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
VendorSiteCode |
|
|
SupplierSiteAddress1 |
|
|
SupplierSiteAddress2 |
|
|
SupplierSiteAddress3 |
|
|
SupplierSiteCity |
|
|
SupplierSiteState There's a predefined DVM in use for this field. |
|
|
|
|
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
EmailAddress |
|
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
SupplierSitePhoneCountryCode SupplierSitePhoneAreaCode SupplierSitePhoneNumber |
|
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
SupplierSiteFaxCountryCode SupplierSiteFaxAreaCode SupplierSiteFaxPhoneNumber |
|
|
Set to Oracle XML Direct. |
|
|
SupplierContactPartyName |
|
|
EmailAddress |
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
SupplierSiteCountry There's a predefined DVM in use for this field. |
|
|
SupplierSitePhoneCountryCode SupplierSitePhoneAreaCode SupplierSitePhoneNumber |
|
ShipToLocCountry There's a predefined DVM in use for this field. |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
ShipToInternalLocationCode There's a predefined DVM in use for this field. |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
LineLocShipToLocationName |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
Requester |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
ShipToLocAddressLine1 |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
ShipToLocAddressLine2 |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
ShipToLocAddressLine3 |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
ShipToLocTownOrCity |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
ShipToLocStateProvn There's a predefined DVM in use for this field. |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
|
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
ShipToLocCountry There's a predefined DVM in use for this field. |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
ShipToLocCountry |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
|
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
ShipToLocCountry There's a predefined DVM in use for this field. |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
ShipToLocCountry There's a predefined DVM in use for this field. |
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
|
|
Note:
The ship-to component from the first line location is mapped to the header ship-to. |
CurrencyCode There's a predefined DVM in use for this field. |
|
|
Set to Taxable or Non-Taxable. |
|
|
CurrencyCode |
|
|
PdfDraftPurchaseOrderLineVORow/ PdfDraftPurchaseOrderLineVOToAttachmentsVOAccessor/ AttachmentsVORow/FileName |
|
|
PdfDraftPurchaseOrderLineVORow/ PdfDraftPurchaseOrderLineVOToAttachmentsVOAccessor/ AttachmentsVORow/DmDocumentId |
|
|
PdfDraftPurchaseOrderLineLocationVORow/ PdfDraftPurchaseOrderLineLocationVOToAttachmentsVOAccessor/ AttachmentsVORow/FileName |
|
|
PdfDraftPurchaseOrderLineLocationVORow/ PdfDraftPurchaseOrderLineLocationVOToAttachmentsVOAccessor/ AttachmentsVORow/DmDocumentId |
|
|
Distribution |
-- |
|
Attribute1...16 |
|
Sample Payload
Here's a sample payload.
<sendCollaborationDocument xmlns="http://xmlns.oracle.com/apps/scm/cmk" xmlns:wsa="http://www.w3.org/2005/08/addressing">
<CollaborationEvent testFlag="true" testResult="Success">
<CollaborationEventName>PurchaseOrderIssued</CollaborationEventName>
<RecipientKey1>999992000323897</RecipientKey1>
<RecipientKey2>999992000365366</RecipientKey2>
<RecipientKeyType>Supplier Site</RecipientKeyType>
<ObjectKey1>300100035338808</ObjectKey1>
<ObjectKey2>1002676</ObjectKey2>
<ObjectKey3>Vision Operations</ObjectKey3>
</CollaborationEvent>
<Document>
<tns:getCmkInputPayloadResponse xmlns:tns="http://xmlns.oracle.com/apps/prc/po/manageDocument/publicModel/viewPdf/types/">
<tns:result xmlns:ns2="http://xmlns.oracle.com/apps/prc/po/manageDocument/publicModel/viewPdf/v2/">
<ns2:PdfDraftPurchaseOrderHeaderVORow>
<ns2:Segment1>1004846</ns2:Segment1>
<ns2:CurrencyCode>USD</ns2:CurrencyCode>
<ns2:HeaderNoteToVendor>Note to Supplier</ns2:HeaderNoteToVendor>
<ns2:Comments>PO description</ns2:Comments>
<ns2:AcceptanceRequiredFlag>Y</ns2:AcceptanceRequiredFlag>
<ns2:AcceptanceDueDate>2020-10-09T00:00:00.000+00:00</ns2:AcceptanceDueDate>
<ns2:Attribute1>Attribute1</ns2:Attribute1>
<ns2:Attribute2>Attribute2</ns2:Attribute2>
<ns2:Attribute3>Attribute3</ns2:Attribute3>
<ns2:Attribute4>Attribute4</ns2:Attribute4>
<ns2:Attribute5>Attribute5</ns2:Attribute5>
<ns2:Attribute6>Attribute6</ns2:Attribute6>
<ns2:Attribute7>Attribute7</ns2:Attribute7>
<ns2:Attribute8>Attribute8</ns2:Attribute8>
<ns2:Attribute9>Attribute9</ns2:Attribute9>
<ns2:Attribute10>Attribute10</ns2:Attribute10>
<ns2:Attribute11>Attribute11</ns2:Attribute11>
<ns2:Attribute12>Attribute12</ns2:Attribute12>
<ns2:Attribute13>Attribute13</ns2:Attribute13>
<ns2:Attribute14>Attribute14</ns2:Attribute14>
<ns2:Attribute15>Attribute15</ns2:Attribute15>
<ns2:Attribute16>Attribute16</ns2:Attribute16>
<ns2:EmailAddress>my@mail</ns2:EmailAddress>
<ns2:RevisionNum>0</ns2:RevisionNum>
<ns2:TermsAndConditions>TermsAndConditions</ns2:TermsAndConditions>
<ns2:BillToLocationName>BillToLocationName</ns2:BillToLocationName>
<ns2:SoldToLeName>Vision Operations</ns2:SoldToLeName>
<ns2:SupplierPartyName>CMK_PO_18</ns2:SupplierPartyName>
<ns2:SupplierContactPartyName>CMK_PO18_ST CMK_PO18_ST</ns2:SupplierContactPartyName>
<ns2:CarrierPartyName>Airborne</ns2:CarrierPartyName>
<ns2:PersonName>Clare Furey</ns2:PersonName>
<ns2:PersonWorkPhone>123-456-7890</ns2:PersonWorkPhone>
<!--<ns2:PersonFax>123-456-7890</ns2:PersonFax> -->
<ns2:PersonEmailAddress>my@mailm</ns2:PersonEmailAddress>
<ns2:PaymentTermsName>30 Net</ns2:PaymentTermsName>
<ns2:isShipToLocationMultiple>N</ns2:isShipToLocationMultiple>
<ns2:Ordered>1000.00</ns2:Ordered>
<ns2:VendorID>123456</ns2:VendorID>
<ns2:OrderedDisplay>1000.00</ns2:OrderedDisplay>
<!-- <ns2:SupplierNumber>1488256471</ns2:SupplierNumber>
<ns2:ChangeOrderDate>2020-08-12T20:26:40.0Z</ns2:ChangeOrderDate> -->
<ns2:OrderDate>2020-10-01T15:49:35.000000</ns2:OrderDate>
<ns2:OrderDateDisplay>01-OCT-2020</ns2:OrderDateDisplay>
<!-- <ns2:TotalTaxDisplay>0.00</ns2:TotalTaxDisplay> -->
<ns2:VendorSiteCode>CMK_PO18_ST</ns2:VendorSiteCode>
<ns2:SupplierSiteCity>Any City</ns2:SupplierSiteCity>
<!-- <ns2:SupplierSiteCounty>Any County</ns2:SupplierSiteCounty> -->
<ns2:SupplierSiteState>Any State</ns2:SupplierSiteState>
<ns2:SupplierSiteCountry>Any Country</ns2:SupplierSiteCountry>
<ns2:SupplierSitePostalCode>123456</ns2:SupplierSitePostalCode>
<ns2:SupplierSiteAddress1>Address1</ns2:SupplierSiteAddress1>
<ns2:SupplierSiteAddress2>Address2</ns2:SupplierSiteAddress2>
<ns2:SupplierSiteAddress3>Address3</ns2:SupplierSiteAddress3>
<ns2:SupplierSiteFaxCountryCode>1</ns2:SupplierSiteFaxCountryCode>
<ns2:SupplierSiteFaxAreaCode>123</ns2:SupplierSiteFaxAreaCode>
<ns2:SupplierSiteFaxPhoneNumber>456-7890</ns2:SupplierSiteFaxPhoneNumber>
<ns2:SupplierSitePhoneAreaCode>123</ns2:SupplierSitePhoneAreaCode>
<ns2:SupplierSitePhoneCountryCode>1</ns2:SupplierSitePhoneCountryCode>
<ns2:SupplierSitePhoneNumber>456-7890</ns2:SupplierSitePhoneNumber>
<ns2:BillToLocTownOrCity>Any City</ns2:BillToLocTownOrCity>
<ns2:BillToLocCountry>US</ns2:BillToLocCountry>
<ns2:BillToLocPostalCode>10022-3422</ns2:BillToLocPostalCode>
<ns2:BillToLocAddressLine1>90 Fifth Avenue</ns2:BillToLocAddressLine1>
<ns2:BillToLocAddressLine2>AddressLine2</ns2:BillToLocAddressLine2>
<ns2:BillToLocAddressLine3>AddressLine3</ns2:BillToLocAddressLine3>
<ns2:BillToLocStateProvn>NY</ns2:BillToLocStateProvn>
<!--<ns2:BillToLocCounty>New York</ns2:BillToLocCounty> -->
<ns2:BillToLocTelephoneNumber1>BillToLocTelephoneNumber1</ns2:BillToLocTelephoneNumber1>
<!--<ns2:PaymentTermsDescription>PaymentTermsDescription</ns2:PaymentTermsDescription> -->
<ns2:BillToBuName>Vision Operations</ns2:BillToBuName>
<!--<ns2:SoldToLeName>Vision Operations</ns2:SoldToLeName>
<ns2:TaxRegistrationNumber>SYS12125</ns2:TaxRegistrationNumber>
<ns2:ProcurementBuName>Vision Operations</ns2:ProcurementBuName> -->
<ns2:BillToLocationCode>V1- New York City</ns2:BillToLocationCode>
<!-- <ns2:ModeOfTransportName>Parcel</ns2:ModeOfTransportName>
<ns2:ServiceLevelName>2nd day air</ns2:ServiceLevelName>
<ns2:ShippingMethod>Airborne-Parcel-2nd day air</ns2:ShippingMethod> -->
<ns2:SoldToLeTownOrCity>New York</ns2:SoldToLeTownOrCity>
<ns2:SoldToLeCountry>US</ns2:SoldToLeCountry>
<ns2:SoldToLePostalCode>10022</ns2:SoldToLePostalCode>
<ns2:SoldToLeAddressLine1>475 Park Avenue</ns2:SoldToLeAddressLine1>
<ns2:SoldToLeAddressLine2>AddressLine2</ns2:SoldToLeAddressLine2>
<ns2:SoldToLeAddressLine3>AddressLine3</ns2:SoldToLeAddressLine3>
<ns2:SoldToLeAddressLine4>AddressLine4</ns2:SoldToLeAddressLine4>
<ns2:SoldToLeStateProvn>NY</ns2:SoldToLeStateProvn>
<!-- <ns2:SoldToLeCounty>New York</ns2:SoldToLeCounty>
<ns2:BuyerManagedTransportFlag>N</ns2:BuyerManagedTransportFlag> -->
<ns2:PdfDraftPurchaseOrderLineVORow>
<ns2:LineNum>1</ns2:LineNum>
<!-- <ns2:ItemRevision>Rev</ns2:ItemRevision> -->
<ns2:ItemDescription>Envoy Laptop - Rugged</ns2:ItemDescription>
<ns2:UnitPrice>500</ns2:UnitPrice>
<!-- <ns2:Quantity>2</ns2:Quantity>-->
<ns2:NoteToVendor>NoteToVendor</ns2:NoteToVendor>
<ns2:VendorProductNum>AS92888</ns2:VendorProductNum>
<ns2:Attribute1>Attribute1</ns2:Attribute1>
<ns2:Attribute2>Attribute2</ns2:Attribute2>
<ns2:Attribute3>Attribute3</ns2:Attribute3>
<ns2:Attribute4>Attribute4</ns2:Attribute4>
<ns2:Attribute5>Attribute5</ns2:Attribute5>
<ns2:Attribute6>Attribute6</ns2:Attribute6>
<ns2:Attribute7>Attribute7</ns2:Attribute7>
<ns2:Attribute8>Attribute8</ns2:Attribute8>
<ns2:Attribute9>Attribute9</ns2:Attribute9>
<ns2:Attribute10>Attribute10</ns2:Attribute10>
<ns2:Attribute11>Attribute11</ns2:Attribute11>
<ns2:Attribute12>Attribute12</ns2:Attribute12>
<ns2:Attribute13>Attribute13</ns2:Attribute13>
<ns2:Attribute14>Attribute14</ns2:Attribute14>
<ns2:Attribute15>Attribute15</ns2:Attribute15>
<ns2:Attribute16>Attribute16</ns2:Attribute16>
<ns2:SupplierRefNumber>SupplierRefNumber</ns2:SupplierRefNumber>
<!-- <ns2:BlanketHeaderDocNumber>BlanketHeaderDocNumber</ns2:BlanketHeaderDocNumber>
<ns2:ContractHeaderDocNumber>ContractHeaderDocNumber</ns2:ContractHeaderDocNumber> -->
<ns2:UnitOfMeasure>Each</ns2:UnitOfMeasure>
<ns2:ItemNumber>AS92888_CUSTOMER</ns2:ItemNumber>
<!-- <ns2:AmountDisplay>1,000.00</ns2:AmountDisplay>
<ns2:TotalTaxDisplay>0.00</ns2:TotalTaxDisplay> -->
<ns2:UomBaseLanguage>Each</ns2:UomBaseLanguage>
<ns2:PdfDraftPurchaseOrderLineLocationVORow>
<ns2:Quantity>10</ns2:Quantity>
<ns2:QuantityDisplay>10</ns2:QuantityDisplay>
<ns2:NeedByDate>2020-11-01T00:00:00.000+00:00</ns2:NeedByDate>
<!-- <ns2:PromisedDate>2020-09-01</ns2:PromisedDate> -->
<ns2:PriceOverride>PriceOverride</ns2:PriceOverride>
<ns2:TaxableFlag>N</ns2:TaxableFlag>
<ns2:ShipmentNum>1</ns2:ShipmentNum>
<!-- <ns2:Amount>5.00</ns2:Amount> -->
<ns2:LineLocShipToLocationName>LineLocShipToLocationName</ns2:LineLocShipToLocationName>
<ns2:ShipToLocTownOrCity>New York</ns2:ShipToLocTownOrCity>
<ns2:ShipToLocCountry>US</ns2:ShipToLocCountry>
<ns2:ShipToLocPostalCode>10022-3422</ns2:ShipToLocPostalCode>
<ns2:ShipToLocAddressLine1>90 Fifth Avenue</ns2:ShipToLocAddressLine1>
<ns2:ShipToLocAddressLine2>AddressLine2</ns2:ShipToLocAddressLine2>
<ns2:ShipToLocAddressLine3>AddressLine3</ns2:ShipToLocAddressLine3>
<!--<ns2:ShipToLocAddressLine4>AddressLine4</ns2:ShipToLocAddressLine4> -->
<ns2:ShipToLocStateProvn>NY</ns2:ShipToLocStateProvn>
<!-- <ns2:ShipToLocCounty>New York</ns2:ShipToLocCounty> -->
<ns2:ShiptoCustomerName>ShipTo</ns2:ShiptoCustomerName>
<!-- <ns2:ShiptoCustContactName>Claire</ns2:ShiptoCustContactName>
<ns2:ShiptoCustContactEmailAddress>my@mail</ns2:ShiptoCustContactEmailAddress>
<ns2:ShiptoCustContactPhoneNumber>123-456-7890</ns2:ShiptoCustContactPhoneNumber>
<ns2:RequestedShipDate>1957-08-13</ns2:RequestedShipDate>-->
<ns2:ShipToInternalLocationCode>V1-_NEW_YORK_CITY_0_2450399170046</ns2:ShipToInternalLocationCode>
<ns2:PdfDraftPurchaseOrderDistributionVORow>
<ns2:Requester>Requester_LineLocDist</ns2:Requester>
<ns2:Attribute1>Attribute1</ns2:Attribute1>
<ns2:Attribute2>Attribute2</ns2:Attribute2>
<ns2:Attribute3>Attribute3</ns2:Attribute3>
<ns2:Attribute4>Attribute4</ns2:Attribute4>
<ns2:Attribute5>Attribute5</ns2:Attribute5>
<ns2:Attribute6>Attribute6</ns2:Attribute6>
<ns2:Attribute7>Attribute7</ns2:Attribute7>
<ns2:Attribute8>Attribute8</ns2:Attribute8>
<ns2:Attribute9>Attribute9</ns2:Attribute9>
<ns2:Attribute10>Attribute10</ns2:Attribute10>
<ns2:Attribute11>Attribute11</ns2:Attribute11>
<ns2:Attribute12>Attribute12</ns2:Attribute12>
<ns2:Attribute13>Attribute13</ns2:Attribute13>
<ns2:Attribute14>Attribute14</ns2:Attribute14>
<ns2:Attribute15>Attribute15</ns2:Attribute15>
<ns2:Attribute16>Attribute16</ns2:Attribute16>
<ns2:RequesterEmailAddress>RequesterEmailAddress</ns2:RequesterEmailAddress>
<ns2:RequesterPhoneNumber>RequesterPhoneNumber</ns2:RequesterPhoneNumber>
</ns2:PdfDraftPurchaseOrderDistributionVORow>
<ns2:PdfDraftPurchaseOrderLineLocationVOToAttachmentsVOAccessor>
<ns2:AttachmentsVORow>
<ns2:FileName>BUG 24415509.docx</ns2:FileName>
<ns2:DmDocumentId>UCMFA00074730</ns2:DmDocumentId>
</ns2:AttachmentsVORow>
</ns2:PdfDraftPurchaseOrderLineLocationVOToAttachmentsVOAccessor>
</ns2:PdfDraftPurchaseOrderLineLocationVORow>
<ns2:PdfDraftPurchaseOrderLineVOToAttachmentsVOAccessor>
<ns2:AttachmentsVORow>
<ns2:FileName>Attachments.txt</ns2:FileName>
<ns2:DmDocumentId>UCMFA00074727</ns2:DmDocumentId>
</ns2:AttachmentsVORow>
</ns2:PdfDraftPurchaseOrderLineVOToAttachmentsVOAccessor>
<!--<ns2:PdfDraftPurchaseOrderConfigComponentVORow>
<ns2:ItemDescription>ItemDescription</ns2:ItemDescription>
<ns2:UnitPrice>21</ns2:UnitPrice>
<ns2:ItemRevision>ItemRevision</ns2:ItemRevision>
<ns2:ComponentQuantity>5.00</ns2:ComponentQuantity>
<ns2:OptionItemNumber>123</ns2:OptionItemNumber>
<ns2:UnitPriceDisplay>20</ns2:UnitPriceDisplay>
<ns2:ComponentLineNumber>101</ns2:ComponentLineNumber>
<ns2:BaseModelItemNumber>12345</ns2:BaseModelItemNumber>
<ns2:ParentLineNumber>101</ns2:ParentLineNumber>
<ns2:UnitOfMeasure>Each</ns2:UnitOfMeasure>
<ns2:SupplierItemNumber>AS92888</ns2:SupplierItemNumber>
</ns2:PdfDraftPurchaseOrderConfigComponentVORow> -->
</ns2:PdfDraftPurchaseOrderLineVORow>
<ns2:PdfDraftPurchaseOrderHeaderVOToAttachmentsVOAccessor>
<ns2:AttachmentsVORow>
<ns2:FileName>notes.txt</ns2:FileName>
<ns2:DmDocumentId>UCMFA00074696</ns2:DmDocumentId>
</ns2:AttachmentsVORow>
</ns2:PdfDraftPurchaseOrderHeaderVOToAttachmentsVOAccessor>
</ns2:PdfDraftPurchaseOrderHeaderVORow>
</tns:result>
</tns:getCmkInputPayloadResponse>
</Document>
</sendCollaborationDocument>