PreviousNext JavaScript must be enabled to correctly display this content
  • Title and Copyright Information
  • Get Help
  • 1 Introduction to Replenishment Planning
    • Overview of Oracle Replenishment Planning
    • Overview of Supply Chain Planning Work Areas
    • Overview of the Replenishment Planning Work Area
    • How to Enable the Replenishment Planning Work Area
    • Access Tasks as Quick Actions on a Home Page
    • Work with Page Layouts in Replenishment Planning
    • Overview of Supply Chain Planning Plan Types
    • Planners for Supply Chain Planning
      • How You Define Planners for Supply Chain Planning
      • Update Planner Data with New Employee Information
      • How You Reassign Item Definitions to a Different Planner
    • Assign Time Zones to Locations in Supply Chain Planning
    • Administer Planning Security
      • Overview of Administer Planning Security
      • Factors to Consider When You Design Your Data Access Sets
      • Design the Conditions for Data Access Sets
      • Create a Data Access Set and Define Its Conditions
      • Manage Data Access Sets
  • 2 Tables, Graphs, Analysis Sets, Tiles, and Tile Sets
    • Overview of Tables, Graphs, Analysis Sets, Tiles, and Tile Sets
    • Use Advanced Options in the Selector Tool
    • Use Measure Filters
      • Overview of Measure Filters for Pivot Tables and Graphs
      • Create Measure Filters for Pivot Tables and Graphs
      • Edit Measure Filters for Pivot Tables and Graphs
    • Create an Analysis Set
    • Create a Tile in Supply Chain Planning
    • Set Measure Targets for Use in Tiles
    • Create a Tile Set in Supply Chain Planning
    • Use Table Drilling
    • Use Table Linking
    • Link to External Systems
      • Overview of Linking to External Systems with Context
      • Structure of a Link to an External System
      • Set Up the Application Integration for an External System
      • Edit the Application Integration for an External System
      • Create a Link to an External System
      • Edit a Link to an External System
      • Use a Link to an External System
    • Graph Layout Options
    • Configure Filters for Graphs
    • Set Your Axis Scale
    • Format How Measures Are Displayed in Tables and Graphs
    • Configure Color by Measure to Display in Graphs
    • How You Can Edit Measures at an Aggregate Time Level
    • How Time Periods Are Calculated and Displayed in Tables, Graphs, and the Selector Tool
    • Manage Measure Data in Tables
      • How You Can Edit Measure Data
      • Copy and Paste Values in Tables
      • Manage Data Calculations When Editing Measure Data in a Supply Chain Planning Table
      • How You Lock Cells While Editing Measure Data or Allocating Values in a Table
      • How can I highlight editable cells in a table?
    • Export Data to Microsoft Excel
    • Predefined Tables, Graphs, and Infotiles for Replenishment Planning
      • Predefined Tables for Replenishment Planning
      • Predefined Graphs for Replenishment Planning
      • Predefined Infotiles for Replenishment Planning
  • 3 Planning Analytics
    • Overview of Planning Analytics
    • Configure Planning Analytics
    • Dimensions and Dimension Catalogs
      • How You Use Dimensions and Dimension Catalogs in Supply Chain Planning
      • Considerations for Setting Up Dimension Catalogs
      • What's a dimension in Supply Chain Planning?
      • How can I use dimensions in Supply Chain Planning?
      • What's a dimension catalog in Supply Chain Planning?
      • Can I modify the default dimension catalog?
    • Measure Catalogs
      • How You Use Measure Catalogs in Supply Chain Planning
      • Can I modify the default measure catalog?
    • Levels and Attributes
      • How You Use Levels and Attributes in Supply Chain Planning
  • 4 Planning Measures
    • Predefined Measures in Supply Chain Planning
    • How You Manage Planning Measures
    • Import Measure Data Into a Planning Table
    • Configure Units for a Measure
    • Configure Currencies for a Measure
    • Configure Conditional Formatting for a Measure
    • Guidelines for Setting the Calculation Order
    • Manage User-Defined Measures
      • Create Measures and Assign to a Measure Catalog
      • Duplicate, Edit, and Delete Measures
      • Create Measure Groups
      • Configure Global Goals for Measures
    • View the Audit Trail for Measure Updates
      • Overview of Viewing the Audit Trail for Measure Data
      • View the Audit Trail for Measure Data from a Cell in a Pivot Table
      • View the Audit Trail of Measure Updates Table
      • How Security Is Applied to the Audit Trail
      • Enable or Disable Update Modes for the Audit Trail for Measure Updates
      • Change the Number of Days for Which the Audit Trail Is Displayed by Default in the Dialog Box
  • 5 Supply Network Model
    • How You Maintain Your Supply Network Model
    • Past Due Sales Order Days Parameter
    • Publish Order Forecasts to Suppliers
    • How You Define the Approved Supplier List for Supply Chain Planning
    • Associate Calendars with Supplier Sites
    • Assignment Sets, Sourcing Rules, and Bills of Distribution
    • Create an Assignment Set
    • Specify Catalogs for Assignment Sets
    • Create a Sourcing Rule
    • Export Planning Data to CSV Files
    • Item Attributes for Oracle Replenishment Planning
  • 6 Planning Data Collections
    • Overview of Data Collections for Supply Chain Planning
    • Global Entities
    • Data Collection Types for Supply Chain Planning
    • Manage Planning Source Systems for Data Collections
    • How the Order Orchestration and Order Promising Processes Use the Collected Planning Data
    • How You Enable Cross-References of Entities by Data Collections
    • How Planning Processes Collect Different Work Definitions and Item Structures
    • Enable External Data Collection for the Oracle Fusion Source System
    • Collection of Safety Stock Levels
    • Set Up Catalogs and Items for Collections
      • Guidelines for Setting Up Catalogs for Collections
      • Guidelines for Setting Up Items for Collections
    • Collect Planning Data from the Oracle Fusion Source System
      • How You Collect Different Data Types for Supply Chain Planning
      • Collection Filters and Collection Templates
      • Collect Data Using the Targeted Collection Type
      • Collect Data Using the Net Change Collection Type
      • Enable Organization Group Collection for the Net Change Collection Type
      • Manage Incremental Planning Collections Artifacts Scheduled Process
    • Load Planning Data from Others and External Source Systems
      • How You Load Planning Data from Files
      • Create CSV Files to Load Planning Data
      • Data Collection Sequence
      • Import Templates Used to Create CSV Files for Supply Chain Planning
      • Loading of Measure Data at Aggregate Levels
      • Run the Load Planning Data from Files Process
      • Load Planning Data from Files for a Selected Group of Organizations
      • How You Extract Data from Oracle E-Business Suite for Loading
      • Improve Performance of Measure Disaggregation
        • Overview of Improving Performance While Disaggregating Measure Data
        • Enable Multithreading for Measure Data Disaggregation for All Plans
        • Enable Multithreading for Measure Data Disaggregation for a Single Plan
        • Override the Default Value for the Multithreaded Process
    • Collect Resources and the Resource Availability
      • Overview of Collecting Resources and the Resource Availability
      • Collect Resources and the Resource Availability from Oracle Fusion Cloud Manufacturing
      • Collect Resources and the Resource Availability from an External Source
      • Profile Option Codes and the Collection of Resources and the Resource Availability
    • Collections for Oracle Replenishment Planning
    • Collection of Consumption Data for Oracle Replenishment Planning
    • ERP Integrations REST Service
      • Use of ERP Integrations REST Service in Collections
      • ERP Integrations REST Service
    • Verify Collection Processes
      • Verify the Load Planning Data from Files Process
      • Review Data in the Planning Data Repository
    • Purge Data
      • How You Purge Collected Data from the Data Repository for Supply Chain Planning
      • How You Purge Staging Tables for Supply Chain Planning
    • View and Refresh Collected Measure Data
      • View Collected Data for Measures Before Running a Plan
      • Additional Points About the Collected Measure Data Table
      • Refresh Collected Measure Data
      • Orchestrate Refresh Measures Processes
      • Additional Information About Orchestrate Refresh Measures Processes
  • 7 Exceptions
    • Exceptions in Plans
      • Overview of Plan Exceptions
      • Configure Exception Thresholds
      • Create Tables and Graphs for Exceptions
    • Exceptions and Exception Sets
      • Overview of Exceptions and Exception Sets
      • How You Edit Exceptions
      • Configure Exception Sets
      • Set Filters on Planning Dimensions for Exceptions
    • Predefined Planning Exceptions
      • Overview of Predefined Planning Exceptions
      • Predefined Demand Planning Exceptions
    • User-Defined Exceptions
      • Overview of User-Defined Exceptions
      • Configure Measure-Based Exceptions
      • Configure Exceptions for Replenishment Planning
      • Configure Exceptions Based on User-Defined Measures
      • Calculate User-Defined, Measure-Based Exceptions
  • 8 Segmentation
    • Segmentation in Oracle Replenishment Planning
    • Work with Segment Groups
      • Create a Segment Group
      • Edit a Segment Group
    • Run Segmentation
    • View the Segmentation Summary
    • Override Segmentation Results
    • Guidelines for Working with the Segmentation Feature
  • 9 Policy Assignment Sets and Policy Parameter Calculation
    • Policy Assignment Sets
    • How You Use Policy Assignment Sets
    • How Average Daily Demand Is Calculated in Oracle Replenishment Planning
    • How EOQ Is Calculated in Oracle Replenishment Planning
    • How Safety Stock Is Calculated in Oracle Replenishment Planning
    • How You Upload Externally Calculated Safety Stock
    • Static Policies or Time-Phased Policies in Oracle Replenishment Planning
    • Work With Policy Assignment Sets
      • Create a Policy Assignment Set
      • Edit a Policy Assignment Set
  • 10 Policy Comparisons
    • Overview of the Policy Comparison Feature
    • How You Use the Policy Comparison Feature
    • Measures Used for Comparing Policy Parameters
    • Work with the Manage Policy Comparison Table
    • How You Use the Policy Comparison Analytics
  • 11 Statistical Forecasts
    • Create a Forecasting Profile
    • Edit a User-Defined Forecasting Profile
    • Forecasting Methods
    • Configure Decomposition Groups
    • Forecasting Parameters
    • Measures for Bayesian Forecasting
    • Forecast Trees
      • Overview of Forecast Trees
      • How a Forecast Tree Is Constructed
      • Best Practices for Setting Up Forecasting Tables for Forecast Trees
      • Example of an Incorrectly Constructed Forecast Tree
    • Disaggregation of Statistical Forecasts
      • How Statistical Forecasts Are Disaggregated by Default
      • How You Configure Disaggregation of Statistical Forecasts
    • Forecasting Using Supersession Relationships
      • Overview of Forecasting Using Supersession Relationships
      • How You Set Up Forecasting with Supersession Relationships
      • How the History Average Measure Is Calculated for the Current Revision and Latest Revision
      • Measures for Forecasting Using Supersession Relationships
    • Use the Product Lifecycle Management Page Layout
      • Overview of the Product Lifecycle Management Page Layout
      • How You Generate Forecasts While Managing Product Life Cycles
    • How You Forecast Product Returns
    • How You Generate Forecasts from a Product Launch Date
    • How You Stop Forecasts from a Product Discontinuation Date
    • How You Analyze Forecast Consumption
    • Forecast Processing in Replenishment Plans
      • Overview of Forecast Processing in Replenishment Plans
      • Examples of Forecast Processing in Replenishment Plans
  • 12 Replenishment Plans
    • Create a Replenishment Plan
    • Open a Replenishment Plan
    • Copy a Replenishment Plan
    • View a Replenishment Plan
    • Manage Plan Options
      • Scope Plan Options for Replenishment Plans
      • Set Up Policy Comparisons and Retain Policy Overrides
      • Considerations for Storing Plan Data at Aggregate Time Levels
      • Demand Plan Options for Demand or Replenishment Plans
      • Use the History Offset for Out-of-Sample Forecast Tuning
      • Considerations for Configuring Replenishment Plan Attributes
      • How the Natural Time Fence Controls the Creation of Planned Orders
      • Automatic Release Options
      • Item Relationship Options for Replenishment Plans
      • Enable Multiechelon Planning for Your Replenishment Plan
      • Release Recommendation Options
      • Technical Control Parameters
      • Organizations and Schedules Options for Replenishment Plans
      • Demand Measures and Forecast Accuracy Measures
      • Inventory Rebalancing Options for Replenishment Plans
    • Run a Replenishment Plan
    • Publish Plan Data
    • Best Practices for Setting Up Replenishment Plans
    • Example of Replenishment Plans for a Standard Business Scenario
    • Guidelines for Working with Plan Messages for Replenishment Plans
  • 13 Calculation and Release of Replenishment Orders
    • Overview of Replenishment Order Release
    • Measures Used for Calculating Replenishment Orders
    • Support for Create Supply and Create Supply After Attributes in Oracle Replenishment Planning
    • Support for Sourcing Rules and Bills of Distribution in Oracle Replenishment Planning
    • Examples of Replenishment Orders for Different Policy Types
    • How Order Modifiers Are Applied When Replenishments Are Calculated
    • Aggregate Planning Buckets and Replenishment Orders
    • How Replenishment Orders Are Calculated During Incremental Planning
    • How Lead Time Is Calculated for Buy Orders and Transfer Orders
    • Scheduling of Replenishment Orders
    • How Replenishment Orders Are Automatically Released
    • Manually Release Replenishment Orders
    • Create and Release Manual Planned Orders
    • Release Plan Recommendations to an External Execution System
    • Verify Status of Replenishment Orders
    • Support for Hold Dates and Expiration Dates in On-Hand Lots
      • Overview of Support for Hold Dates and Expiration Dates in On-Hand Lots
      • How On-Hand Lots Are Consumed in Replenishment Plans
      • How the Suggested Due Dates and In Receiving Measure Are Calculated for On-Hand Lots with Hold Dates
  • 14 Multiechelon Replenishment Planning
    • Overview of Multiechelon Replenishment Planning
    • How Multiechelon Replenishment Planning Is Done
    • How You Use Multiechelon Replenishment Planning
    • Measures for Multiechelon Replenishment Planning
    • How the Low-Level Code Is Calculated During Multiechelon Replenishment Planning
    • How Sourcing Ranks Are Used in Multiechelon Replenishment Planning
    • How Sourcing Allocation Percentages Are Used in Multiechelon Replenishment Planning
    • Rescheduling of Orders During Bottom-up Phase of Multiechelon Replenishment Planning
    • Example of Multiechelon Replenishment Planning
  • 15 Replenishment Planning for Subinventories
    • Overview of Replenishment Planning for Subinventories
    • How You Set Up Replenishment Planning for Subinventories
    • Example of Replenishment Plans for Stores Modeled as Subinventories
  • 16 Inventory Rebalancing
    • Overview of Inventory Rebalancing
    • Work with Clusters
      • Create a Cluster
      • Edit a Cluster
    • Measures for Inventory Rebalancing
    • How Rebalancing Recommendations Are Created
    • How You Use the Inventory Rebalancing Feature
    • How the Projected Inventory Measure Is Calculated
    • How the Excess Inventory and Inventory Shortage Are Calculated
    • Example of Inventory Rebalancing
    • Examples of Inventory Rebalancing and Replenishment Planning
    • End Item Substitution and Supersession in Inventory Rebalancing
      • Overview of Support for End Item Substitution and Supersession in Inventory Rebalancing
      • How End Item Substitution and Supersession Are Done with Inventory Rebalancing
      • Example of End Item Substitution and Supersession with Inventory Rebalancing
    • Manually Release Rebalancing Recommendations
    • How You Use the Analytics for Inventory Rebalancing
  • 17 End Item Substitution and Supersession
    • Overview of End Item Substitution and Supersession
    • How You Use the End Item Substitution and Supersession Feature
    • How End Item Substitution and Supersession Are Performed
    • Create Analysis Hierarchies for Related Items
    • Edit an Analysis Hierarchy
    • Examples of Analysis Hierarchies
    • Measures for End Item Substitution and Supersession
    • How You Create and Use Analytics for Analysis Hierarchies
    • Examples of End Item Substitution and Supersession
  • 18 Simulations for Replenishment Plans
    • Overview of Simulations for Replenishment Plans
    • Simulate Changes to Policy Parameters for Segments Within a Replenishment Plan
    • Simulate Changes to Policy Values for Items Within a Replenishment Plan
    • How You Simulate Changes to Supplies and Demands in Replenishment Plans
    • How You Simulate Changes to Item Attributes in Replenishment Plans
    • Simulations for Inventory Rebalancing Recommendations
      • Overview of Simulations for Inventory Rebalancing Recommendations
      • How You Simulate Changes to Inventory Rebalancing Recommendations in Replenishment Plans
      • Example of Simulation of Changes to Inventory Rebalancing Recommendations
  • 19 Simulation Sets
    • Create a Simulation Set
    • Edit a Simulation Set
    • Edit a Simulation Set from a Spreadsheet
  • 20 Buyer Planning
    • Buyer Planning for Administrators
    • Overview of Buyer Planning for Buyer Planners
    • How to Get Ready for Buyer Planning
    • Add Suppliers to Use When Doing Buyer Planning
    • Add the Updated Projected Available Balances Measure
    • Consolidate Orders for Better Price Break Opportunities
    • Group Orders to Save Costs
    • Analyze Impact on Inventory
    • Release Your Plan from Buyer Planning
  • 21 Extract Plan Data
    • Overview of Planning Measure Data Extractions from Plan Output
    • Configure Plan Extract Parameters
    • Files Created by the Plan Extract Process
    • Dimension Data Files Created by the Plan Extract Process
    • Dimension Definition Files Created by the Plan Extract Process
    • Measure Data Files Created by the Plan Extract Process
    • Measure Definition Files Created by the Plan Extract Process
    • Dimension Codes Used by the Plan Extract Process
    • Dimensionality Group Codes Used by the Plan Extract Process
  • 22 Troubleshooting
    • Resolve Error MSC-2806379
    • Resolve Error MSC-2806380
    • Resolve Warnings About Catalogs and Categories That Weren't Processed
    • Resolve the Warning About the Default Product Catalog
    • Resolve the Issue About Items Not Being Collected
    • Resolve the Error About No Free Web Service or Application Resources