Change Order Affected Item Reference Designator Descriptive Flexfields REST Endpoints
Product Lifecycle Management/Item Structure/Item Structure Component/Component Reference Designator/Change Order Affected Item Reference Designator Descriptive Flexfields
The operations from the Product Lifecycle Management/Item Structure/Item Structure Component/Component Reference Designator/Change Order Affected Item Reference Designator Descriptive Flexfields category.
- Create reference designator descriptive flexfields
- Method: postPath:
/fscmRestApi/resources/11.13.18.05/itemStructures/{BillSequenceId}/child/Component/{ComponentSequenceId}/child/ReferenceDesignator/{ReferenceDesignatorSequenceId}/child/ReferenceDesignatorDFF - Get all reference designator descriptive flexfields
- Method: getPath:
/fscmRestApi/resources/11.13.18.05/itemStructures/{BillSequenceId}/child/Component/{ComponentSequenceId}/child/ReferenceDesignator/{ReferenceDesignatorSequenceId}/child/ReferenceDesignatorDFF - Get one reference designator descriptive flexfield
- Method: getPath:
/fscmRestApi/resources/11.13.18.05/itemStructures/{BillSequenceId}/child/Component/{ComponentSequenceId}/child/ReferenceDesignator/{ReferenceDesignatorSequenceId}/child/ReferenceDesignatorDFF/{RefDesigSequenceId} - Update a reference designator descriptive flexfield
- Method: patchPath:
/fscmRestApi/resources/11.13.18.05/itemStructures/{BillSequenceId}/child/Component/{ComponentSequenceId}/child/ReferenceDesignator/{ReferenceDesignatorSequenceId}/child/ReferenceDesignatorDFF/{RefDesigSequenceId}