This graphic shows an X-Y axis. The Y-axis shows High Cost at the top and Low Cost at the bottom. The X-axis shows More CPU at the left and More I/O at the right. Three plan icons appear on the axis, stretching from the lower left to the upper right: Plan 1, Plan 3, and Plan 2. Plan 1 is contained within a dotted-line circle.