A.5 Facility Power Checklist
Use this checklist to ensure that the facility power requirements have been addressed.
| Facility Power Considerations | Yes | No | N/A | Comment |
|---|---|---|---|---|
|
Have the operating voltage and electric current requirements been reviewed? |
||||
|
What type of PDUs have been ordered (low voltage or high voltage, single-phase or 3-phase)? |
||||
|
Are enough power outlets provided within 2 meters for each rack? |
||||
|
Do the power outlets have appropriate socket receptacles for the PDU option ordered? |
||||
|
Will optional ground cables be attached to the rack? |
||||
|
Do the electrical circuits (and breakers) provide suitable power (kW/kVA), voltage, and current-carrying capacities? |
||||
|
Does the power frequency meet the equipment specifications? |
||||
|
Will system power be delivered from two separate supplies? |
||||
|
Will a UPS power the equipment? |